To the Top
Jump to main content
The Generations & Gender Contextual Database
/
1 Demography
/
CPAM_Contraceptive prevalence: Any method (Percentage)
Choose table
Choose variable
Show result
CPAM_Contraceptive prevalence: Any method (Percentage)
Choose variables
About table
Contact
Arianna Caporali, Institut national d'études démographiques (INED)
9, cours des Humanités
CS 50004
93322 Aubervilliers Cedex
Phone : +33 (0)1 56 06 20 00
e-Mail:
arianna.caporali@ined.fr
Unit
Percentage
Reference time
Oldest data: 1970. Most recent data: 2022
Creation date
1/18/2023
Copyright
Yes
Source
Generations and Gender Contextual Database. See 'Citation guidelines' for proper acknowledgement.
Matrix
CDB_CPAM
Mark your selections and choose between table on screen and file format.
Marking tips
Country
Mandatory
--- Select classification ---
Countries by NUTS codes
Countries by OECD codes
Countries by GGP codes
Go to: Select values from group
Field for searching for a specific value in the list box. This is examples of values you can search for.Albania , Andorra , Argentina ,
wave temp fix..
Beginning of word
Selected
0
of total
65
Albania
Andorra
Argentina
Armenia
Australia
Austria
Azerbaijan
Belarus
Belgium
Bosnia and Herzegovina
Bulgaria
Canada
China, Hong Kong SAR
China, Taiwan Province of China
Croatia
Cyprus
Czechia
Denmark
Estonia
Finland
France
Georgia
Germany
Greece
Hungary
Iceland
Ireland
Israel
Italy
Japan
Kosovo
Kyrgyzstan
Latvia
Liechtenstein
Lithuania
Luxembourg
Malta
Monaco
Montenegro
Netherlands
New Zealand
North Macedonia
Norway
Poland
Portugal
Republic of Kazakhstan
Republic of Korea
Republic of Moldova
Romania
Russian Federation
San Marino
Serbia
Slovakia
Slovenia
Spain
Sweden
Switzerland
Tajikistan
Turkmenistan
Türkiye
Ukraine
United Kingdom
United States of America
Uruguay
Uzbekistan
Select at least one value
Year
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1970 , 1971 , 1972 ,
wave temp fix..
Beginning of word
Selected
1
of total
53
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979
1978
1977
1976
1975
1974
1973
1972
1971
1970
Select at least one value
Number of selected data cells are:
(maximum number allowed is 500,000)
Number of selected cells exceeds the maximum allowed 500,000
Obs:
Source(s) used:
United Nations, Department of Economic and Social Affairs, Population Division (2022). Estimates and Projections of Family Planning Indicators 2022. New York: United Nations. Donwloaded from
https://www.un.org/development/desa/pd/data/family-planning-indicators
on 18/01/2023
Citation Guidelines:
All data are free for scientific use only. For any other use, please contact the data producer directly to obtain authorization. Please cite the database as follows:
Generations and Gender Programme (Year). Generations and Gender Contextual Database. Netherlands Interdisciplinary Demographic Institute (distributor).
Retrieved from: https://www.ggp-i.org/data/ggp-contextual-database/ on Day/Month/Year
If the data downloaded from the GGP Contextual Database comes only from one source (e.g. Eurostat), you might cite it as follows:
Original Source [e.g. Eurostat, © European Union, 1995-2019] (Data obtained through the Generations and Gender Contextual Database. Netherlands Interdisciplinary Demographic Institute (distributor). Retrieved from: https://www.ggp-i.org/data/ggp-contextual-database/ on Day/Month/Year)
Please also check the original source for further information on the use of the data and proper citation.
Indicator (long name):
Contraceptive prevalence: Any method (Percentage)
Indicator (short name):
CPAM
Definition:
Percentage of married or in-union women of reproductive age (15-49 years) who are currently using, or whose sexual
partner is currently using, at least one method of contraception.
Source of variable definition: Source(s)used:
United Nations, Department of Economic and Social Affairs, Population Division (2022). Estimates and Projections of Family Planning Indicators 2022. New York: United Nations. Downloaded from
https://www.un.org/development/desa/pd/data/family-planning-indicators
on 18/01/2023.
Comments:
Data are model-based estimates pertaining to married or in-union women for years 1970-2022. Data are median values and were obtained either through interpolation or projection. The estimation method (either interpolation or projection) is given in the footnotes. Footnotes also contain the 80 percent uncertainty intervals and the 95 percent uncertainty intervals, for each year. A Bayesian hierarchical model combined with country-specific time trends was used to generate the estimates, projections and uncertainty assessments.
The model-based estimates and projections were derived from survey-based estimates by country, as compiled in: United Nations, Department of Economic and Social Affairs, Population Division (2022) World Contraceptive Use 2022. New York: United Nations.
In the survey-based estimates, contraceptive methods include: 1) modern methods - i.e., female & male sterilizations, IUD, implant, injectable, pill, male and female condoms, vaginal barrier methods, lactational amenorrhea method (LAM), emergency contraception, and other modern methods not reported separately -, and 2) traditional methods - i.e., rhythm, withdrawal and other traditional methods not reported separately. For the categories 'other methods not reported separately', please see the notes on residuals for each type of contraceptive methods in the original publication.
The model-based estimates account for differences by data source in the characteristics of the sample population and in the contraceptive methods included in survey-based estimates of prevalence.
For further details, see the documentation accompanying the dataset available from: https://www.un.org/development/desa/pd/sites/www.un.org.development.desa.pd/files/undesa_pd_2022_wcu_fp-indicators_documentation.pdf (last accessed on 18/1/2023).
Reference areas:
Click
here
to download the list of reference areas and the respective geographical codes.
Footnotes
Country: Albania , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.3 and 83.1. Uncertainty (95%) bounds are between 46.3 and 88.4.
Country: Albania , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 82.8. Uncertainty (95%) bounds are between 47 and 88.1.
Country: Albania , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 82.6. Uncertainty (95%) bounds are between 47.7 and 87.8.
Country: Albania , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.2 and 82.5. Uncertainty (95%) bounds are between 48.4 and 87.5.
Country: Albania , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 82.1. Uncertainty (95%) bounds are between 49 and 87.3.
Country: Albania , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 81.9. Uncertainty (95%) bounds are between 49.7 and 86.9.
Country: Albania , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 40 and 81.5. Uncertainty (95%) bounds are between 50.3 and 86.6.
Country: Albania , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 81.3. Uncertainty (95%) bounds are between 51 and 86.2.
Country: Albania , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 42 and 80.9. Uncertainty (95%) bounds are between 51.6 and 86.
Country: Albania , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.9 and 80.5. Uncertainty (95%) bounds are between 52.4 and 85.6.
Country: Albania , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.9 and 80.2. Uncertainty (95%) bounds are between 53.2 and 85.1.
Country: Albania , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.1 and 79.8. Uncertainty (95%) bounds are between 53.9 and 84.6.
Country: Albania , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.3 and 79.5. Uncertainty (95%) bounds are between 54.7 and 84.2.
Country: Albania , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.7 and 79. Uncertainty (95%) bounds are between 55.4 and 83.6.
Country: Albania , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 78.6. Uncertainty (95%) bounds are between 56.2 and 83.1.
Country: Albania , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 50 and 78.2. Uncertainty (95%) bounds are between 56.9 and 82.4.
Country: Albania , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 77.7. Uncertainty (95%) bounds are between 57.8 and 81.9.
Country: Albania , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 77.3. Uncertainty (95%) bounds are between 58.6 and 81.2.
Country: Albania , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 76.8. Uncertainty (95%) bounds are between 59.3 and 80.5.
Country: Albania , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.7 and 76.2. Uncertainty (95%) bounds are between 60.1 and 79.8.
Country: Albania , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 75.8. Uncertainty (95%) bounds are between 60.5 and 79.2.
Country: Albania , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 75.6. Uncertainty (95%) bounds are between 60.6 and 78.7.
Country: Albania , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 75.4. Uncertainty (95%) bounds are between 60.5 and 78.4.
Country: Albania , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 75.2. Uncertainty (95%) bounds are between 60.4 and 78.2.
Country: Albania , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 75. Uncertainty (95%) bounds are between 60.1 and 78.2.
Country: Albania , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 74.7. Uncertainty (95%) bounds are between 60 and 78.
Country: Albania , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 74.4. Uncertainty (95%) bounds are between 59.9 and 77.6.
Country: Albania , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.8 and 74. Uncertainty (95%) bounds are between 59.9 and 77.2.
Country: Albania , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 73.5. Uncertainty (95%) bounds are between 60 and 76.6.
Country: Albania , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 73. Uncertainty (95%) bounds are between 60.2 and 76.2.
Country: Albania , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 72.6. Uncertainty (95%) bounds are between 60.3 and 75.6.
Country: Albania , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 72.3. Uncertainty (95%) bounds are between 60.4 and 75.2.
Country: Albania , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 72. Uncertainty (95%) bounds are between 60.4 and 74.9.
Country: Albania , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 71.9. Uncertainty (95%) bounds are between 60.5 and 74.7.
Country: Albania , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 71.6. Uncertainty (95%) bounds are between 60.5 and 74.3.
Country: Albania , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 71.2. Uncertainty (95%) bounds are between 60.3 and 73.8.
Country: Albania , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 70.4. Uncertainty (95%) bounds are between 59.7 and 73.
Country: Albania , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 69.3. Uncertainty (95%) bounds are between 58.9 and 71.9.
Country: Albania , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 68.1. Uncertainty (95%) bounds are between 57.7 and 70.7.
Country: Albania , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 66.7. Uncertainty (95%) bounds are between 56 and 69.4.
Country: Albania , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 65.4. Uncertainty (95%) bounds are between 53.6 and 68.4.
Country: Albania , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 63.9. Uncertainty (95%) bounds are between 50.9 and 67.2.
Country: Albania , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 62.2. Uncertainty (95%) bounds are between 48.2 and 65.8.
Country: Albania , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 60.5. Uncertainty (95%) bounds are between 45.7 and 64.4.
Country: Albania , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.5 and 58.5. Uncertainty (95%) bounds are between 43.3 and 62.6.
Country: Albania , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 56.6. Uncertainty (95%) bounds are between 41.1 and 60.8.
Country: Albania , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 54.8. Uncertainty (95%) bounds are between 39.1 and 59.1.
Country: Albania , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.5 and 53.5. Uncertainty (95%) bounds are between 37.5 and 57.9.
Country: Albania , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.3 and 53. Uncertainty (95%) bounds are between 36.4 and 57.6.
Country: Albania , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 31 and 53.2. Uncertainty (95%) bounds are between 35.3 and 57.9.
Country: Albania , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 30 and 53.8. Uncertainty (95%) bounds are between 34.6 and 58.7.
Country: Albania , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.1 and 54.5. Uncertainty (95%) bounds are between 33.9 and 59.8.
Country: Albania , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.5 and 55.4. Uncertainty (95%) bounds are between 33.5 and 60.9.
Country: Armenia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.8 and 68.2. Uncertainty (95%) bounds are between 16.8 and 77.8.
Country: Armenia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.7 and 68.1. Uncertainty (95%) bounds are between 17.8 and 77.5.
Country: Armenia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.6 and 67.8. Uncertainty (95%) bounds are between 18.9 and 77.2.
Country: Armenia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.5 and 67.5. Uncertainty (95%) bounds are between 19.9 and 76.8.
Country: Armenia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 67.3. Uncertainty (95%) bounds are between 21 and 76.3.
Country: Armenia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.7 and 67.1. Uncertainty (95%) bounds are between 22 and 75.8.
Country: Armenia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.9 and 66.8. Uncertainty (95%) bounds are between 23.2 and 75.3.
Country: Armenia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.1 and 66.3. Uncertainty (95%) bounds are between 24.5 and 74.7.
Country: Armenia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.3 and 66.1. Uncertainty (95%) bounds are between 25.9 and 74.1.
Country: Armenia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.6 and 65.9. Uncertainty (95%) bounds are between 27.2 and 73.7.
Country: Armenia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 21 and 65.6. Uncertainty (95%) bounds are between 28.6 and 73.1.
Country: Armenia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.6 and 65.3. Uncertainty (95%) bounds are between 30 and 72.5.
Country: Armenia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.3 and 64.9. Uncertainty (95%) bounds are between 31.5 and 71.9.
Country: Armenia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 26 and 64.5. Uncertainty (95%) bounds are between 33 and 71.2.
Country: Armenia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.9 and 64.1. Uncertainty (95%) bounds are between 34.5 and 70.5.
Country: Armenia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.8 and 63.8. Uncertainty (95%) bounds are between 36.1 and 69.6.
Country: Armenia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.7 and 63.4. Uncertainty (95%) bounds are between 37.7 and 68.9.
Country: Armenia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.7 and 63. Uncertainty (95%) bounds are between 39.4 and 68.
Country: Armenia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.6 and 62.5. Uncertainty (95%) bounds are between 41.1 and 67.1.
Country: Armenia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 61.9. Uncertainty (95%) bounds are between 42.7 and 66.4.
Country: Armenia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 40 and 61.5. Uncertainty (95%) bounds are between 44.3 and 65.7.
Country: Armenia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.7 and 61.3. Uncertainty (95%) bounds are between 45.6 and 65.2.
Country: Armenia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 61.5. Uncertainty (95%) bounds are between 46.5 and 65.
Country: Armenia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 61.8. Uncertainty (95%) bounds are between 47.1 and 65.1.
Country: Armenia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44 and 62. Uncertainty (95%) bounds are between 47.7 and 65.3.
Country: Armenia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 62. Uncertainty (95%) bounds are between 48.2 and 65.3.
Country: Armenia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 62. Uncertainty (95%) bounds are between 49 and 65.1.
Country: Armenia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 61.8. Uncertainty (95%) bounds are between 49.7 and 64.7.
Country: Armenia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 61.4. Uncertainty (95%) bounds are between 50.6 and 64.1.
Country: Armenia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.9 and 60.8. Uncertainty (95%) bounds are between 51.3 and 63.4.
Country: Armenia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 60.3. Uncertainty (95%) bounds are between 51.7 and 62.4.
Country: Armenia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 59.8. Uncertainty (95%) bounds are between 50.9 and 62.1.
Country: Armenia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 59.2. Uncertainty (95%) bounds are between 49.9 and 61.6.
Country: Armenia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 58.4. Uncertainty (95%) bounds are between 49.1 and 60.8.
Country: Armenia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 57.5. Uncertainty (95%) bounds are between 48.7 and 60.
Country: Armenia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.3 and 57. Uncertainty (95%) bounds are between 48.5 and 59.3.
Country: Armenia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.4 and 57.6. Uncertainty (95%) bounds are between 48.7 and 59.9.
Country: Armenia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 58.5. Uncertainty (95%) bounds are between 49.2 and 61.1.
Country: Armenia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.6 and 59.3. Uncertainty (95%) bounds are between 50.1 and 61.9.
Country: Armenia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.9 and 60. Uncertainty (95%) bounds are between 51.3 and 62.4.
Country: Armenia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 60.5. Uncertainty (95%) bounds are between 52.2 and 62.8.
Country: Armenia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 61.1. Uncertainty (95%) bounds are between 52.3 and 63.6.
Country: Armenia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.8 and 61.7. Uncertainty (95%) bounds are between 52.3 and 64.2.
Country: Armenia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.8 and 61.9. Uncertainty (95%) bounds are between 52.3 and 64.6.
Country: Armenia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 62. Uncertainty (95%) bounds are between 52.6 and 64.7.
Country: Armenia , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 62. Uncertainty (95%) bounds are between 53 and 64.5.
Country: Armenia , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 62.2. Uncertainty (95%) bounds are between 53.3 and 64.7.
Country: Armenia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 63.1. Uncertainty (95%) bounds are between 52.8 and 65.8.
Country: Armenia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 64.2. Uncertainty (95%) bounds are between 52.2 and 67.3.
Country: Armenia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 65.3. Uncertainty (95%) bounds are between 51.6 and 68.8.
Country: Armenia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 66.5. Uncertainty (95%) bounds are between 51.1 and 70.4.
Country: Armenia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.1 and 67.5. Uncertainty (95%) bounds are between 50.6 and 71.6.
Country: Armenia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 68.4. Uncertainty (95%) bounds are between 50.3 and 72.7.
Country: Australia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 85.9. Uncertainty (95%) bounds are between 60.2 and 89.7.
Country: Australia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 85.6. Uncertainty (95%) bounds are between 60.8 and 89.4.
Country: Australia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 85.3. Uncertainty (95%) bounds are between 61.5 and 89.1.
Country: Australia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 85. Uncertainty (95%) bounds are between 62.1 and 88.8.
Country: Australia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 84.7. Uncertainty (95%) bounds are between 62.8 and 88.3.
Country: Australia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 84.4. Uncertainty (95%) bounds are between 63.5 and 87.9.
Country: Australia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 84. Uncertainty (95%) bounds are between 64.3 and 87.5.
Country: Australia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 83.6. Uncertainty (95%) bounds are between 64.9 and 87.
Country: Australia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 83.2. Uncertainty (95%) bounds are between 65.8 and 86.5.
Country: Australia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 82.8. Uncertainty (95%) bounds are between 66.5 and 85.9.
Country: Australia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.2 and 82.3. Uncertainty (95%) bounds are between 67.3 and 85.3.
Country: Australia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.3 and 81.8. Uncertainty (95%) bounds are between 68 and 84.6.
Country: Australia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.7 and 81.2. Uncertainty (95%) bounds are between 68.8 and 83.7.
Country: Australia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 66 and 80.5. Uncertainty (95%) bounds are between 69.6 and 82.8.
Country: Australia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.4 and 79.8. Uncertainty (95%) bounds are between 70.4 and 81.7.
Country: Australia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.3 and 78.9. Uncertainty (95%) bounds are between 71 and 80.7.
Country: Australia , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 78.1. Uncertainty (95%) bounds are between 71.2 and 79.7.
Country: Australia , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 77.5. Uncertainty (95%) bounds are between 70.4 and 79.2.
Country: Australia , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 77. Uncertainty (95%) bounds are between 69.2 and 78.7.
Country: Australia , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 76.2. Uncertainty (95%) bounds are between 67.9 and 78.2.
Country: Australia , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 75.5. Uncertainty (95%) bounds are between 66.7 and 77.5.
Country: Australia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 74.8. Uncertainty (95%) bounds are between 65.4 and 77.
Country: Australia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 74. Uncertainty (95%) bounds are between 64.2 and 76.2.
Country: Australia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 73.2. Uncertainty (95%) bounds are between 63.1 and 75.6.
Country: Australia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 72.4. Uncertainty (95%) bounds are between 62.3 and 74.9.
Country: Australia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 71.9. Uncertainty (95%) bounds are between 61.6 and 74.2.
Country: Australia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 71.9. Uncertainty (95%) bounds are between 61 and 74.4.
Country: Australia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 72.2. Uncertainty (95%) bounds are between 60.8 and 74.8.
Country: Australia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 72.4. Uncertainty (95%) bounds are between 60.9 and 75.
Country: Australia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 72.5. Uncertainty (95%) bounds are between 61.2 and 75.1.
Country: Australia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 72.5. Uncertainty (95%) bounds are between 61.5 and 75.
Country: Australia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 72.2. Uncertainty (95%) bounds are between 61.7 and 74.5.
Country: Australia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 71.5. Uncertainty (95%) bounds are between 61.6 and 73.7.
Country: Australia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 70.6. Uncertainty (95%) bounds are between 61.3 and 72.7.
Country: Australia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 69.5. Uncertainty (95%) bounds are between 61.1 and 71.4.
Country: Australia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 68.4. Uncertainty (95%) bounds are between 60.9 and 70.
Country: Australia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 67.6. Uncertainty (95%) bounds are between 60.4 and 69.2.
Country: Australia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 67.1. Uncertainty (95%) bounds are between 60 and 68.8.
Country: Australia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 66.8. Uncertainty (95%) bounds are between 59.9 and 68.4.
Country: Australia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 67.2. Uncertainty (95%) bounds are between 60.2 and 68.8.
Country: Australia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 68. Uncertainty (95%) bounds are between 60.9 and 69.5.
Country: Australia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 68.6. Uncertainty (95%) bounds are between 61.7 and 70.1.
Country: Australia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 69.2. Uncertainty (95%) bounds are between 62.1 and 70.8.
Country: Australia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 69.6. Uncertainty (95%) bounds are between 62.1 and 71.3.
Country: Australia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 69.8. Uncertainty (95%) bounds are between 62.2 and 71.6.
Country: Australia , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 69.9. Uncertainty (95%) bounds are between 62.3 and 71.7.
Country: Australia , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 70.5. Uncertainty (95%) bounds are between 61.8 and 72.6.
Country: Australia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.5 and 71.3. Uncertainty (95%) bounds are between 61 and 73.8.
Country: Australia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.3 and 72.3. Uncertainty (95%) bounds are between 60.1 and 75.1.
Country: Australia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.1 and 73.1. Uncertainty (95%) bounds are between 59.2 and 76.3.
Country: Australia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 73.9. Uncertainty (95%) bounds are between 58.5 and 77.3.
Country: Australia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 74.7. Uncertainty (95%) bounds are between 57.8 and 78.4.
Country: Australia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.8 and 75.3. Uncertainty (95%) bounds are between 57.1 and 79.3.
Country: Austria , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.5 and 80.3. Uncertainty (95%) bounds are between 36.9 and 86.2.
Country: Austria , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 79.9. Uncertainty (95%) bounds are between 37.8 and 85.9.
Country: Austria , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.7 and 79.7. Uncertainty (95%) bounds are between 38.9 and 85.5.
Country: Austria , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.1 and 79.3. Uncertainty (95%) bounds are between 39.6 and 85.1.
Country: Austria , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.2 and 78.9. Uncertainty (95%) bounds are between 40.4 and 84.8.
Country: Austria , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.6 and 78.7. Uncertainty (95%) bounds are between 41.5 and 84.5.
Country: Austria , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.9 and 78.3. Uncertainty (95%) bounds are between 42.4 and 84.1.
Country: Austria , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 78. Uncertainty (95%) bounds are between 43.5 and 83.6.
Country: Austria , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.6 and 77.6. Uncertainty (95%) bounds are between 44.4 and 83.2.
Country: Austria , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 77.2. Uncertainty (95%) bounds are between 45.4 and 82.8.
Country: Austria , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 76.8. Uncertainty (95%) bounds are between 46.4 and 82.4.
Country: Austria , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.4 and 76.5. Uncertainty (95%) bounds are between 47.3 and 81.7.
Country: Austria , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 76.1. Uncertainty (95%) bounds are between 48.1 and 81.1.
Country: Austria , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.3 and 75.7. Uncertainty (95%) bounds are between 49.2 and 80.5.
Country: Austria , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.8 and 75.3. Uncertainty (95%) bounds are between 50.2 and 79.9.
Country: Austria , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.5 and 74.8. Uncertainty (95%) bounds are between 51.2 and 79.3.
Country: Austria , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.2 and 74.3. Uncertainty (95%) bounds are between 52.4 and 78.5.
Country: Austria , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 47 and 73.7. Uncertainty (95%) bounds are between 53.4 and 77.7.
Country: Austria , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.4 and 73.1. Uncertainty (95%) bounds are between 54.5 and 76.7.
Country: Austria , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.5 and 72.4. Uncertainty (95%) bounds are between 55.2 and 75.8.
Country: Austria , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.5 and 71.7. Uncertainty (95%) bounds are between 55.7 and 74.9.
Country: Austria , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 70.9. Uncertainty (95%) bounds are between 55.7 and 74.1.
Country: Austria , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 70.2. Uncertainty (95%) bounds are between 55.3 and 73.4.
Country: Austria , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.5 and 69.3. Uncertainty (95%) bounds are between 54.7 and 72.7.
Country: Austria , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 68.6. Uncertainty (95%) bounds are between 54.3 and 72.
Country: Austria , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 67.9. Uncertainty (95%) bounds are between 53.9 and 71.4.
Country: Austria , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 67.7. Uncertainty (95%) bounds are between 53.8 and 71.1.
Country: Austria , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 68.1. Uncertainty (95%) bounds are between 53.9 and 71.5.
Country: Austria , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.2 and 68.8. Uncertainty (95%) bounds are between 54.1 and 72.2.
Country: Austria , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 69.5. Uncertainty (95%) bounds are between 54.6 and 73.
Country: Austria , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 70.3. Uncertainty (95%) bounds are between 55.2 and 73.8.
Country: Austria , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.3 and 71. Uncertainty (95%) bounds are between 55.9 and 74.4.
Country: Austria , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 71.5. Uncertainty (95%) bounds are between 56.6 and 75.
Country: Austria , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 72.1. Uncertainty (95%) bounds are between 57.4 and 75.4.
Country: Austria , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 72.6. Uncertainty (95%) bounds are between 58.4 and 75.8.
Country: Austria , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 73. Uncertainty (95%) bounds are between 59.5 and 76.1.
Country: Austria , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 73.4. Uncertainty (95%) bounds are between 60.5 and 76.4.
Country: Austria , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 73.7. Uncertainty (95%) bounds are between 61.8 and 76.4.
Country: Austria , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 74.1. Uncertainty (95%) bounds are between 63 and 76.6.
Country: Austria , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 74.5. Uncertainty (95%) bounds are between 64 and 76.8.
Country: Austria , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 74.9. Uncertainty (95%) bounds are between 64.9 and 77.2.
Country: Austria , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 75.3. Uncertainty (95%) bounds are between 65.6 and 77.4.
Country: Austria , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 75.3. Uncertainty (95%) bounds are between 65.8 and 77.5.
Country: Austria , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 75.1. Uncertainty (95%) bounds are between 65.3 and 77.3.
Country: Austria , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 74.8. Uncertainty (95%) bounds are between 64.4 and 77.1.
Country: Austria , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 74.8. Uncertainty (95%) bounds are between 64 and 77.3.
Country: Austria , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 75.4. Uncertainty (95%) bounds are between 64.1 and 78.
Country: Austria , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 76.2. Uncertainty (95%) bounds are between 64.7 and 79.
Country: Austria , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 77. Uncertainty (95%) bounds are between 65.5 and 79.7.
Country: Austria , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 77.7. Uncertainty (95%) bounds are between 66 and 80.4.
Country: Austria , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.2 and 78.5. Uncertainty (95%) bounds are between 66 and 81.2.
Country: Austria , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.5 and 79.2. Uncertainty (95%) bounds are between 65.7 and 82.1.
Country: Austria , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.6 and 79.8. Uncertainty (95%) bounds are between 65.2 and 83.
Country: Azerbaijan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.9 and 62.1. Uncertainty (95%) bounds are between 9.5 and 75.7.
Country: Azerbaijan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.3 and 62. Uncertainty (95%) bounds are between 10.1 and 75.5.
Country: Azerbaijan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.8 and 61.9. Uncertainty (95%) bounds are between 10.8 and 75.2.
Country: Azerbaijan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.3 and 61.9. Uncertainty (95%) bounds are between 11.6 and 74.9.
Country: Azerbaijan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.9 and 61.7. Uncertainty (95%) bounds are between 12.4 and 74.5.
Country: Azerbaijan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 61.7. Uncertainty (95%) bounds are between 13.2 and 74.2.
Country: Azerbaijan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 61.6. Uncertainty (95%) bounds are between 14 and 73.9.
Country: Azerbaijan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 61.4. Uncertainty (95%) bounds are between 14.9 and 73.6.
Country: Azerbaijan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.8 and 61.4. Uncertainty (95%) bounds are between 15.8 and 73.2.
Country: Azerbaijan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 61.1. Uncertainty (95%) bounds are between 16.9 and 72.7.
Country: Azerbaijan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.5 and 60.9. Uncertainty (95%) bounds are between 17.9 and 72.2.
Country: Azerbaijan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.3 and 60.9. Uncertainty (95%) bounds are between 19.1 and 71.8.
Country: Azerbaijan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.5 and 60.8. Uncertainty (95%) bounds are between 20.3 and 71.4.
Country: Azerbaijan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.6 and 60.7. Uncertainty (95%) bounds are between 21.3 and 70.8.
Country: Azerbaijan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.8 and 60.7. Uncertainty (95%) bounds are between 22.6 and 70.5.
Country: Azerbaijan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.1 and 60.6. Uncertainty (95%) bounds are between 23.8 and 70.
Country: Azerbaijan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.5 and 60.5. Uncertainty (95%) bounds are between 25 and 69.3.
Country: Azerbaijan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.8 and 60.2. Uncertainty (95%) bounds are between 26.4 and 68.9.
Country: Azerbaijan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 60. Uncertainty (95%) bounds are between 27.8 and 68.2.
Country: Azerbaijan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.6 and 59.7. Uncertainty (95%) bounds are between 29.2 and 67.5.
Country: Azerbaijan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.3 and 59.6. Uncertainty (95%) bounds are between 30.6 and 66.9.
Country: Azerbaijan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.9 and 59.7. Uncertainty (95%) bounds are between 32 and 66.6.
Country: Azerbaijan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.5 and 59.8. Uncertainty (95%) bounds are between 33.5 and 66.3.
Country: Azerbaijan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 29 and 59.9. Uncertainty (95%) bounds are between 34.9 and 66.2.
Country: Azerbaijan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 60. Uncertainty (95%) bounds are between 36.4 and 66.1.
Country: Azerbaijan , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.5 and 60.1. Uncertainty (95%) bounds are between 37.8 and 65.8.
Country: Azerbaijan , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.3 and 60.1. Uncertainty (95%) bounds are between 39.3 and 65.6.
Country: Azerbaijan , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 60.2. Uncertainty (95%) bounds are between 40.9 and 65.1.
Country: Azerbaijan , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.8 and 60.1. Uncertainty (95%) bounds are between 42.4 and 64.7.
Country: Azerbaijan , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 59.9. Uncertainty (95%) bounds are between 43.7 and 64.2.
Country: Azerbaijan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41 and 59.6. Uncertainty (95%) bounds are between 44.8 and 63.5.
Country: Azerbaijan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.6 and 59.1. Uncertainty (95%) bounds are between 45.4 and 62.9.
Country: Azerbaijan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 58.6. Uncertainty (95%) bounds are between 45.5 and 62.2.
Country: Azerbaijan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 58.2. Uncertainty (95%) bounds are between 45.4 and 61.5.
Country: Azerbaijan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.4 and 57.6. Uncertainty (95%) bounds are between 45.5 and 60.9.
Country: Azerbaijan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.8 and 57. Uncertainty (95%) bounds are between 45.6 and 60.1.
Country: Azerbaijan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.9 and 56.6. Uncertainty (95%) bounds are between 45.6 and 59.6.
Country: Azerbaijan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.6 and 56.7. Uncertainty (95%) bounds are between 45.4 and 59.9.
Country: Azerbaijan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.3 and 57.1. Uncertainty (95%) bounds are between 45.2 and 60.4.
Country: Azerbaijan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.1 and 57.6. Uncertainty (95%) bounds are between 45.1 and 60.8.
Country: Azerbaijan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 57.9. Uncertainty (95%) bounds are between 45.3 and 61.2.
Country: Azerbaijan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.2 and 58.2. Uncertainty (95%) bounds are between 45.4 and 61.8.
Country: Azerbaijan , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.7 and 59.2. Uncertainty (95%) bounds are between 45.2 and 63.
Country: Azerbaijan , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.2 and 60.4. Uncertainty (95%) bounds are between 45 and 64.3.
Country: Azerbaijan , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.5 and 61.5. Uncertainty (95%) bounds are between 44.8 and 65.8.
Country: Azerbaijan , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.7 and 62.7. Uncertainty (95%) bounds are between 44.6 and 67.3.
Country: Azerbaijan , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 63.7. Uncertainty (95%) bounds are between 44.4 and 68.5.
Country: Azerbaijan , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 64.7. Uncertainty (95%) bounds are between 44.4 and 69.8.
Country: Azerbaijan , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.7 and 65.7. Uncertainty (95%) bounds are between 44.3 and 70.8.
Country: Azerbaijan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 66.5. Uncertainty (95%) bounds are between 44.2 and 71.9.
Country: Azerbaijan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.9 and 67.3. Uncertainty (95%) bounds are between 44.2 and 72.8.
Country: Azerbaijan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 68.1. Uncertainty (95%) bounds are between 44.2 and 73.7.
Country: Azerbaijan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 69. Uncertainty (95%) bounds are between 44.4 and 74.5.
Country: Belarus , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.9 and 77.4. Uncertainty (95%) bounds are between 33.3 and 84.
Country: Belarus , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 77.2. Uncertainty (95%) bounds are between 34.1 and 83.7.
Country: Belarus , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 76.9. Uncertainty (95%) bounds are between 35 and 83.4.
Country: Belarus , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 76.6. Uncertainty (95%) bounds are between 36 and 82.9.
Country: Belarus , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 26 and 76.2. Uncertainty (95%) bounds are between 36.8 and 82.5.
Country: Belarus , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.1 and 76. Uncertainty (95%) bounds are between 37.9 and 82.1.
Country: Belarus , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 28 and 75.6. Uncertainty (95%) bounds are between 38.9 and 81.7.
Country: Belarus , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.4 and 75.2. Uncertainty (95%) bounds are between 39.9 and 81.3.
Country: Belarus , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.7 and 74.8. Uncertainty (95%) bounds are between 40.8 and 80.7.
Country: Belarus , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 74.4. Uncertainty (95%) bounds are between 41.9 and 80.2.
Country: Belarus , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.3 and 74. Uncertainty (95%) bounds are between 43 and 79.9.
Country: Belarus , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 73.5. Uncertainty (95%) bounds are between 43.8 and 79.2.
Country: Belarus , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 73.1. Uncertainty (95%) bounds are between 44.9 and 78.6.
Country: Belarus , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 72.7. Uncertainty (95%) bounds are between 45.9 and 78.
Country: Belarus , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.2 and 72.2. Uncertainty (95%) bounds are between 46.9 and 77.2.
Country: Belarus , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 71.6. Uncertainty (95%) bounds are between 48 and 76.4.
Country: Belarus , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.4 and 71. Uncertainty (95%) bounds are between 49 and 75.5.
Country: Belarus , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 70.4. Uncertainty (95%) bounds are between 50.1 and 74.5.
Country: Belarus , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 69.5. Uncertainty (95%) bounds are between 51.1 and 73.4.
Country: Belarus , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 68.6. Uncertainty (95%) bounds are between 51.8 and 72.1.
Country: Belarus , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 67.5. Uncertainty (95%) bounds are between 52.3 and 70.7.
Country: Belarus , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.8 and 66.1. Uncertainty (95%) bounds are between 52.1 and 69.2.
Country: Belarus , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.9 and 64.5. Uncertainty (95%) bounds are between 51.7 and 67.4.
Country: Belarus , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.9 and 62.9. Uncertainty (95%) bounds are between 51.2 and 65.8.
Country: Belarus , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 61.5. Uncertainty (95%) bounds are between 50.9 and 64.3.
Country: Belarus , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.3 and 60.8. Uncertainty (95%) bounds are between 50.8 and 63.6.
Country: Belarus , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.4 and 61.6. Uncertainty (95%) bounds are between 51.1 and 64.4.
Country: Belarus , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 63. Uncertainty (95%) bounds are between 51.5 and 66.
Country: Belarus , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.1 and 64.6. Uncertainty (95%) bounds are between 52.3 and 67.8.
Country: Belarus , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 66.2. Uncertainty (95%) bounds are between 53.3 and 69.5.
Country: Belarus , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 67.7. Uncertainty (95%) bounds are between 54.6 and 71.
Country: Belarus , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.4 and 69.1. Uncertainty (95%) bounds are between 56 and 72.3.
Country: Belarus , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 70.2. Uncertainty (95%) bounds are between 57.5 and 73.3.
Country: Belarus , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 71.3. Uncertainty (95%) bounds are between 58.9 and 74.2.
Country: Belarus , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 72.2. Uncertainty (95%) bounds are between 60.3 and 74.9.
Country: Belarus , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 72.7. Uncertainty (95%) bounds are between 61.3 and 75.4.
Country: Belarus , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 73. Uncertainty (95%) bounds are between 61.6 and 75.7.
Country: Belarus , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 73.1. Uncertainty (95%) bounds are between 61.4 and 75.9.
Country: Belarus , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 73. Uncertainty (95%) bounds are between 61.2 and 75.9.
Country: Belarus , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 72.8. Uncertainty (95%) bounds are between 61 and 75.7.
Country: Belarus , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 72.4. Uncertainty (95%) bounds are between 60.8 and 75.2.
Country: Belarus , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 71.9. Uncertainty (95%) bounds are between 60.6 and 74.7.
Country: Belarus , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 71.5. Uncertainty (95%) bounds are between 60.5 and 74.1.
Country: Belarus , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 71.2. Uncertainty (95%) bounds are between 60.1 and 73.8.
Country: Belarus , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 70.9. Uncertainty (95%) bounds are between 59.6 and 73.6.
Country: Belarus , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 70.6. Uncertainty (95%) bounds are between 59.2 and 73.3.
Country: Belarus , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.9 and 70.1. Uncertainty (95%) bounds are between 58.9 and 72.9.
Country: Belarus , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 69.6. Uncertainty (95%) bounds are between 58.3 and 72.4.
Country: Belarus , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 69.1. Uncertainty (95%) bounds are between 57.4 and 71.9.
Country: Belarus , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 68.7. Uncertainty (95%) bounds are between 56.4 and 71.8.
Country: Belarus , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 69.1. Uncertainty (95%) bounds are between 55.3 and 72.4.
Country: Belarus , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 69.7. Uncertainty (95%) bounds are between 54.5 and 73.3.
Country: Belarus , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 70.4. Uncertainty (95%) bounds are between 53.7 and 74.2.
Country: Belgium , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 83. Uncertainty (95%) bounds are between 70 and 85.6.
Country: Belgium , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 83.8. Uncertainty (95%) bounds are between 71.7 and 86.1.
Country: Belgium , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 84.4. Uncertainty (95%) bounds are between 73.3 and 86.6.
Country: Belgium , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.5 and 84.9. Uncertainty (95%) bounds are between 74.8 and 86.9.
Country: Belgium , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73 and 85.2. Uncertainty (95%) bounds are between 76.1 and 87.1.
Country: Belgium , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74 and 85.4. Uncertainty (95%) bounds are between 76.7 and 87.1.
Country: Belgium , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.6 and 85.2. Uncertainty (95%) bounds are between 76.4 and 87.
Country: Belgium , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.6 and 84.7. Uncertainty (95%) bounds are between 75.7 and 86.6.
Country: Belgium , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.6 and 84.1. Uncertainty (95%) bounds are between 74.7 and 86.1.
Country: Belgium , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.6 and 83.3. Uncertainty (95%) bounds are between 73.8 and 85.4.
Country: Belgium , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.6 and 82.4. Uncertainty (95%) bounds are between 72.9 and 84.4.
Country: Belgium , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 81.4. Uncertainty (95%) bounds are between 72 and 83.5.
Country: Belgium , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 80.4. Uncertainty (95%) bounds are between 71.1 and 82.5.
Country: Belgium , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 79.8. Uncertainty (95%) bounds are between 70 and 81.9.
Country: Belgium , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 79.3. Uncertainty (95%) bounds are between 68.9 and 81.6.
Country: Belgium , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 78.8. Uncertainty (95%) bounds are between 67.9 and 81.1.
Country: Belgium , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 78.2. Uncertainty (95%) bounds are between 67.1 and 80.7.
Country: Belgium , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.9 and 77.6. Uncertainty (95%) bounds are between 66.4 and 80.1.
Country: Belgium , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 76.7. Uncertainty (95%) bounds are between 65.8 and 79.3.
Country: Belgium , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 75.8. Uncertainty (95%) bounds are between 65.2 and 78.3.
Country: Belgium , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 74.8. Uncertainty (95%) bounds are between 64.5 and 77.1.
Country: Belgium , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 73.7. Uncertainty (95%) bounds are between 63.6 and 76.1.
Country: Belgium , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 72.4. Uncertainty (95%) bounds are between 62.3 and 74.7.
Country: Belgium , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 71. Uncertainty (95%) bounds are between 60.7 and 73.4.
Country: Belgium , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 69.3. Uncertainty (95%) bounds are between 59.2 and 71.8.
Country: Belgium , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 67.4. Uncertainty (95%) bounds are between 57.8 and 69.8.
Country: Belgium , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 65.6. Uncertainty (95%) bounds are between 56.7 and 68.
Country: Belgium , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 64.3. Uncertainty (95%) bounds are between 55.9 and 66.7.
Country: Belgium , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 64.3. Uncertainty (95%) bounds are between 55.5 and 66.8.
Country: Belgium , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 64.7. Uncertainty (95%) bounds are between 55.3 and 67.3.
Country: Belgium , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 65.4. Uncertainty (95%) bounds are between 55.5 and 67.9.
Country: Belgium , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 65.9. Uncertainty (95%) bounds are between 55.8 and 68.5.
Country: Belgium , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 66.3. Uncertainty (95%) bounds are between 55.9 and 69.
Country: Belgium , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 66.7. Uncertainty (95%) bounds are between 56.3 and 69.2.
Country: Belgium , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 67. Uncertainty (95%) bounds are between 56.9 and 69.4.
Country: Belgium , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 67.7. Uncertainty (95%) bounds are between 57.5 and 70.1.
Country: Belgium , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 68.6. Uncertainty (95%) bounds are between 58.3 and 71.2.
Country: Belgium , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 69.4. Uncertainty (95%) bounds are between 59.3 and 71.9.
Country: Belgium , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 70.2. Uncertainty (95%) bounds are between 60.3 and 72.5.
Country: Belgium , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 70.7. Uncertainty (95%) bounds are between 61.2 and 72.9.
Country: Belgium , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 71. Uncertainty (95%) bounds are between 62 and 73.2.
Country: Belgium , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 71.1. Uncertainty (95%) bounds are between 62.8 and 73.2.
Country: Belgium , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 71.1. Uncertainty (95%) bounds are between 63.6 and 73.
Country: Belgium , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 70.9. Uncertainty (95%) bounds are between 64.1 and 72.8.
Country: Belgium , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 70.9. Uncertainty (95%) bounds are between 63.9 and 72.7.
Country: Belgium , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 70.9. Uncertainty (95%) bounds are between 63.6 and 72.7.
Country: Belgium , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 70.6. Uncertainty (95%) bounds are between 63.5 and 72.4.
Country: Belgium , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 70.2. Uncertainty (95%) bounds are between 63.4 and 71.9.
Country: Belgium , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 70. Uncertainty (95%) bounds are between 63.4 and 71.6.
Country: Belgium , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.2 and 70.6. Uncertainty (95%) bounds are between 62.5 and 72.6.
Country: Belgium , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.7 and 71.5. Uncertainty (95%) bounds are between 61.5 and 74.
Country: Belgium , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 72.4. Uncertainty (95%) bounds are between 60.6 and 75.2.
Country: Belgium , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 73.2. Uncertainty (95%) bounds are between 59.7 and 76.3.
Country: Bosnia and Herzegovina , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.6 and 59.3. Uncertainty (95%) bounds are between 35.1 and 65.8.
Country: Bosnia and Herzegovina , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.1 and 59.8. Uncertainty (95%) bounds are between 36 and 66.
Country: Bosnia and Herzegovina , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.8 and 60.5. Uncertainty (95%) bounds are between 36.7 and 66.7.
Country: Bosnia and Herzegovina , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.5 and 61.3. Uncertainty (95%) bounds are between 37.3 and 67.5.
Country: Bosnia and Herzegovina , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 62.2. Uncertainty (95%) bounds are between 38 and 68.1.
Country: Bosnia and Herzegovina , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33 and 62.9. Uncertainty (95%) bounds are between 38.8 and 68.9.
Country: Bosnia and Herzegovina , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.8 and 63.7. Uncertainty (95%) bounds are between 39.6 and 69.6.
Country: Bosnia and Herzegovina , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.6 and 64.5. Uncertainty (95%) bounds are between 40.4 and 70.2.
Country: Bosnia and Herzegovina , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 65.3. Uncertainty (95%) bounds are between 41.3 and 70.8.
Country: Bosnia and Herzegovina , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.2 and 66. Uncertainty (95%) bounds are between 42.3 and 71.4.
Country: Bosnia and Herzegovina , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 66.7. Uncertainty (95%) bounds are between 43.2 and 72.
Country: Bosnia and Herzegovina , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38 and 67.2. Uncertainty (95%) bounds are between 44.2 and 72.5.
Country: Bosnia and Herzegovina , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39 and 67.8. Uncertainty (95%) bounds are between 45.2 and 72.8.
Country: Bosnia and Herzegovina , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40 and 68.4. Uncertainty (95%) bounds are between 46.3 and 73.2.
Country: Bosnia and Herzegovina , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.2 and 68.8. Uncertainty (95%) bounds are between 47.3 and 73.3.
Country: Bosnia and Herzegovina , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.3 and 69.1. Uncertainty (95%) bounds are between 48.3 and 73.5.
Country: Bosnia and Herzegovina , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 69.5. Uncertainty (95%) bounds are between 49.5 and 73.6.
Country: Bosnia and Herzegovina , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.8 and 69.7. Uncertainty (95%) bounds are between 50.6 and 73.7.
Country: Bosnia and Herzegovina , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 69.9. Uncertainty (95%) bounds are between 51.7 and 73.8.
Country: Bosnia and Herzegovina , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 70. Uncertainty (95%) bounds are between 52.6 and 73.6.
Country: Bosnia and Herzegovina , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 69.9. Uncertainty (95%) bounds are between 53 and 73.5.
Country: Bosnia and Herzegovina , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 69.8. Uncertainty (95%) bounds are between 53 and 73.4.
Country: Bosnia and Herzegovina , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 69.6. Uncertainty (95%) bounds are between 52.5 and 73.3.
Country: Bosnia and Herzegovina , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 69.3. Uncertainty (95%) bounds are between 51.9 and 73.2.
Country: Bosnia and Herzegovina , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 68.9. Uncertainty (95%) bounds are between 51.2 and 72.8.
Country: Bosnia and Herzegovina , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.6 and 68.5. Uncertainty (95%) bounds are between 50.5 and 72.4.
Country: Bosnia and Herzegovina , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.9 and 68. Uncertainty (95%) bounds are between 50 and 72.1.
Country: Bosnia and Herzegovina , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 67.3. Uncertainty (95%) bounds are between 49.4 and 71.6.
Country: Bosnia and Herzegovina , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 66.7. Uncertainty (95%) bounds are between 48.7 and 70.9.
Country: Bosnia and Herzegovina , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.3 and 66. Uncertainty (95%) bounds are between 48.2 and 70.3.
Country: Bosnia and Herzegovina , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 65.1. Uncertainty (95%) bounds are between 47.4 and 69.6.
Country: Bosnia and Herzegovina , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.5 and 64.2. Uncertainty (95%) bounds are between 46.2 and 69.1.
Country: Bosnia and Herzegovina , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 63.3. Uncertainty (95%) bounds are between 44.9 and 68.2.
Country: Bosnia and Herzegovina , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.3 and 62.4. Uncertainty (95%) bounds are between 43.7 and 67.3.
Country: Bosnia and Herzegovina , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.1 and 61.4. Uncertainty (95%) bounds are between 42.6 and 66.3.
Country: Bosnia and Herzegovina , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 60.4. Uncertainty (95%) bounds are between 41.7 and 65.4.
Country: Bosnia and Herzegovina , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 59.5. Uncertainty (95%) bounds are between 40.9 and 64.5.
Country: Bosnia and Herzegovina , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.7 and 59. Uncertainty (95%) bounds are between 40.2 and 64.
Country: Bosnia and Herzegovina , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.2 and 58.6. Uncertainty (95%) bounds are between 39.7 and 63.8.
Country: Bosnia and Herzegovina , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 58.3. Uncertainty (95%) bounds are between 39.2 and 63.3.
Country: Bosnia and Herzegovina , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 58.1. Uncertainty (95%) bounds are between 38.8 and 63.
Country: Bosnia and Herzegovina , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.9 and 57.9. Uncertainty (95%) bounds are between 38.5 and 63.
Country: Bosnia and Herzegovina , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.4 and 58.1. Uncertainty (95%) bounds are between 38.1 and 63.5.
Country: Bosnia and Herzegovina , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.8 and 58.6. Uncertainty (95%) bounds are between 37.6 and 64.2.
Country: Bosnia and Herzegovina , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.1 and 59.4. Uncertainty (95%) bounds are between 37.3 and 65.
Country: Bosnia and Herzegovina , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.4 and 60. Uncertainty (95%) bounds are between 36.9 and 66.
Country: Bosnia and Herzegovina , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 60.7. Uncertainty (95%) bounds are between 36.5 and 66.9.
Country: Bosnia and Herzegovina , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.1 and 61.5. Uncertainty (95%) bounds are between 36.2 and 67.9.
Country: Bosnia and Herzegovina , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.5 and 62.2. Uncertainty (95%) bounds are between 35.9 and 68.6.
Country: Bosnia and Herzegovina , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.8 and 62.9. Uncertainty (95%) bounds are between 35.6 and 69.6.
Country: Bosnia and Herzegovina , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.4 and 63.7. Uncertainty (95%) bounds are between 35.2 and 70.4.
Country: Bosnia and Herzegovina , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 28 and 64.4. Uncertainty (95%) bounds are between 35.1 and 71.2.
Country: Bosnia and Herzegovina , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.5 and 65. Uncertainty (95%) bounds are between 34.9 and 71.8.
Country: Bulgaria , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.7 and 81.7. Uncertainty (95%) bounds are between 53.9 and 86.1.
Country: Bulgaria , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.9 and 81.3. Uncertainty (95%) bounds are between 54.8 and 85.7.
Country: Bulgaria , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 81. Uncertainty (95%) bounds are between 55.7 and 85.3.
Country: Bulgaria , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 80.6. Uncertainty (95%) bounds are between 56.8 and 84.9.
Country: Bulgaria , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 80.3. Uncertainty (95%) bounds are between 57.7 and 84.5.
Country: Bulgaria , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 80. Uncertainty (95%) bounds are between 58.6 and 84.2.
Country: Bulgaria , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 80. Uncertainty (95%) bounds are between 59.5 and 84.
Country: Bulgaria , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 80.1. Uncertainty (95%) bounds are between 60.3 and 84.
Country: Bulgaria , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 80.4. Uncertainty (95%) bounds are between 61.1 and 84.1.
Country: Bulgaria , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 80.7. Uncertainty (95%) bounds are between 61.9 and 84.3.
Country: Bulgaria , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 81. Uncertainty (95%) bounds are between 62.8 and 84.6.
Country: Bulgaria , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 81.3. Uncertainty (95%) bounds are between 63.5 and 84.8.
Country: Bulgaria , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 81.6. Uncertainty (95%) bounds are between 64.3 and 85.
Country: Bulgaria , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 81.9. Uncertainty (95%) bounds are between 65.2 and 85.1.
Country: Bulgaria , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 82.2. Uncertainty (95%) bounds are between 66.1 and 85.3.
Country: Bulgaria , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 82.3. Uncertainty (95%) bounds are between 67 and 85.4.
Country: Bulgaria , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 82.5. Uncertainty (95%) bounds are between 68.1 and 85.5.
Country: Bulgaria , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 82.7. Uncertainty (95%) bounds are between 69.2 and 85.6.
Country: Bulgaria , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 83. Uncertainty (95%) bounds are between 70.4 and 85.7.
Country: Bulgaria , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68 and 83.3. Uncertainty (95%) bounds are between 71.6 and 85.9.
Country: Bulgaria , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 83.7. Uncertainty (95%) bounds are between 73 and 86.1.
Country: Bulgaria , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.4 and 84.5. Uncertainty (95%) bounds are between 74.5 and 86.7.
Country: Bulgaria , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.1 and 85.3. Uncertainty (95%) bounds are between 76 and 87.3.
Country: Bulgaria , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.7 and 86.1. Uncertainty (95%) bounds are between 77.5 and 88.
Country: Bulgaria , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.1 and 86.9. Uncertainty (95%) bounds are between 78.7 and 88.6.
Country: Bulgaria , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.9 and 87.5. Uncertainty (95%) bounds are between 79.4 and 89.1.
Country: Bulgaria , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.7 and 87.8. Uncertainty (95%) bounds are between 79.2 and 89.6.
Country: Bulgaria , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.7 and 88. Uncertainty (95%) bounds are between 78.7 and 89.9.
Country: Bulgaria , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.6 and 88.1. Uncertainty (95%) bounds are between 78 and 90.1.
Country: Bulgaria , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.6 and 88.1. Uncertainty (95%) bounds are between 77.2 and 90.2.
Country: Bulgaria , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.5 and 88. Uncertainty (95%) bounds are between 76.4 and 90.3.
Country: Bulgaria , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.5 and 87.8. Uncertainty (95%) bounds are between 75.6 and 90.3.
Country: Bulgaria , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.7 and 87.6. Uncertainty (95%) bounds are between 74.7 and 90.2.
Country: Bulgaria , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 87.4. Uncertainty (95%) bounds are between 74 and 90.2.
Country: Bulgaria , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.3 and 87.3. Uncertainty (95%) bounds are between 73.3 and 90.2.
Country: Bulgaria , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 87.3. Uncertainty (95%) bounds are between 73 and 90.3.
Country: Bulgaria , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 87.4. Uncertainty (95%) bounds are between 72.8 and 90.4.
Country: Bulgaria , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68 and 87.6. Uncertainty (95%) bounds are between 72.5 and 90.7.
Country: Bulgaria , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.4 and 87.8. Uncertainty (95%) bounds are between 72.1 and 90.9.
Country: Bulgaria , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.6 and 88. Uncertainty (95%) bounds are between 71.6 and 91.1.
Country: Bulgaria , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.6 and 88.3. Uncertainty (95%) bounds are between 71.2 and 91.4.
Country: Bulgaria , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.9 and 88.5. Uncertainty (95%) bounds are between 70.8 and 91.6.
Country: Bulgaria , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.1 and 88.7. Uncertainty (95%) bounds are between 70.3 and 91.9.
Country: Bulgaria , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.2 and 88.9. Uncertainty (95%) bounds are between 70 and 92.1.
Country: Bulgaria , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 89.1. Uncertainty (95%) bounds are between 69.6 and 92.3.
Country: Bulgaria , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.1 and 89.4. Uncertainty (95%) bounds are between 69.2 and 92.5.
Country: Bulgaria , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.5 and 89.6. Uncertainty (95%) bounds are between 68.9 and 92.6.
Country: Bulgaria , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 61 and 89.8. Uncertainty (95%) bounds are between 68.5 and 92.8.
Country: Bulgaria , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.3 and 90. Uncertainty (95%) bounds are between 68.1 and 93.
Country: Bulgaria , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.9 and 90.1. Uncertainty (95%) bounds are between 67.7 and 93.2.
Country: Bulgaria , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 59 and 90.2. Uncertainty (95%) bounds are between 67.4 and 93.4.
Country: Bulgaria , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 90.4. Uncertainty (95%) bounds are between 67.1 and 93.5.
Country: Bulgaria , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 90.6. Uncertainty (95%) bounds are between 66.6 and 93.7.
Country: Canada , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.4 and 82.5. Uncertainty (95%) bounds are between 53.1 and 87.
Country: Canada , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.5 and 82.2. Uncertainty (95%) bounds are between 54.1 and 86.6.
Country: Canada , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.4 and 81.9. Uncertainty (95%) bounds are between 55.4 and 86.2.
Country: Canada , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 81.5. Uncertainty (95%) bounds are between 56.4 and 85.8.
Country: Canada , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 81.1. Uncertainty (95%) bounds are between 57.6 and 85.3.
Country: Canada , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.4 and 80.8. Uncertainty (95%) bounds are between 58.7 and 84.7.
Country: Canada , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.1 and 80.3. Uncertainty (95%) bounds are between 59.8 and 84.1.
Country: Canada , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.2 and 79.9. Uncertainty (95%) bounds are between 60.9 and 83.4.
Country: Canada , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 79.3. Uncertainty (95%) bounds are between 62.1 and 82.7.
Country: Canada , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 78.7. Uncertainty (95%) bounds are between 63.2 and 81.9.
Country: Canada , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.8 and 78.1. Uncertainty (95%) bounds are between 64.4 and 80.9.
Country: Canada , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.7 and 77.5. Uncertainty (95%) bounds are between 65.6 and 79.9.
Country: Canada , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 76.8. Uncertainty (95%) bounds are between 66.8 and 78.9.
Country: Canada , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.4 and 76. Uncertainty (95%) bounds are between 68 and 77.8.
Country: Canada , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 75.5. Uncertainty (95%) bounds are between 68.8 and 77.2.
Country: Canada , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 75.8. Uncertainty (95%) bounds are between 68.8 and 77.4.
Country: Canada , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 76.3. Uncertainty (95%) bounds are between 68.6 and 78.
Country: Canada , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 76.7. Uncertainty (95%) bounds are between 68.3 and 78.7.
Country: Canada , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 77. Uncertainty (95%) bounds are between 68.2 and 79.
Country: Canada , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 77.1. Uncertainty (95%) bounds are between 68.3 and 79.2.
Country: Canada , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 77.3. Uncertainty (95%) bounds are between 68.5 and 79.4.
Country: Canada , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 77.7. Uncertainty (95%) bounds are between 68.7 and 79.8.
Country: Canada , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 78.1. Uncertainty (95%) bounds are between 69.1 and 80.2.
Country: Canada , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 78.4. Uncertainty (95%) bounds are between 69.6 and 80.6.
Country: Canada , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 78.6. Uncertainty (95%) bounds are between 70.2 and 80.7.
Country: Canada , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.5 and 78.9. Uncertainty (95%) bounds are between 70.8 and 80.7.
Country: Canada , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69 and 79.1. Uncertainty (95%) bounds are between 71.4 and 80.9.
Country: Canada , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 79.3. Uncertainty (95%) bounds are between 71.7 and 81.2.
Country: Canada , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 79.5. Uncertainty (95%) bounds are between 72.1 and 81.2.
Country: Canada , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.6 and 79.4. Uncertainty (95%) bounds are between 72 and 81.1.
Country: Canada , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 79.3. Uncertainty (95%) bounds are between 71.9 and 81.
Country: Canada , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 79.2. Uncertainty (95%) bounds are between 72.1 and 80.8.
Country: Canada , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70 and 79.4. Uncertainty (95%) bounds are between 72.4 and 80.9.
Country: Canada , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.7 and 80.3. Uncertainty (95%) bounds are between 73.4 and 81.8.
Country: Canada , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.8 and 81.4. Uncertainty (95%) bounds are between 74.5 and 82.9.
Country: Canada , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.1 and 82.5. Uncertainty (95%) bounds are between 75.7 and 83.9.
Country: Canada , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74 and 83.5. Uncertainty (95%) bounds are between 76.6 and 84.9.
Country: Canada , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 73.8 and 84.3. Uncertainty (95%) bounds are between 76.7 and 85.9.
Country: Canada , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 73.2 and 85. Uncertainty (95%) bounds are between 76.4 and 86.7.
Country: Canada , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 72.4 and 85.6. Uncertainty (95%) bounds are between 75.9 and 87.4.
Country: Canada , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.5 and 86.2. Uncertainty (95%) bounds are between 75.4 and 88.2.
Country: Canada , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.5 and 86.6. Uncertainty (95%) bounds are between 74.9 and 88.8.
Country: Canada , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.6 and 87. Uncertainty (95%) bounds are between 74.3 and 89.3.
Country: Canada , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.8 and 87.4. Uncertainty (95%) bounds are between 73.8 and 89.8.
Country: Canada , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 68 and 87.7. Uncertainty (95%) bounds are between 73.3 and 90.3.
Country: Canada , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.1 and 88.1. Uncertainty (95%) bounds are between 72.7 and 90.6.
Country: Canada , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.4 and 88.4. Uncertainty (95%) bounds are between 72.3 and 91.
Country: Canada , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.6 and 88.6. Uncertainty (95%) bounds are between 71.8 and 91.3.
Country: Canada , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.7 and 88.9. Uncertainty (95%) bounds are between 71.5 and 91.6.
Country: Canada , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.2 and 89.1. Uncertainty (95%) bounds are between 71.1 and 91.9.
Country: Canada , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.7 and 89.3. Uncertainty (95%) bounds are between 70.8 and 92.2.
Country: Canada , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.1 and 89.6. Uncertainty (95%) bounds are between 70.4 and 92.4.
Country: Canada , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 89.7. Uncertainty (95%) bounds are between 70.1 and 92.6.
Country: China, Hong Kong SAR , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 53. Uncertainty (95%) bounds are between 43 and 55.7.
Country: China, Hong Kong SAR , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.6 and 54.7. Uncertainty (95%) bounds are between 45.9 and 57.
Country: China, Hong Kong SAR , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47 and 56.9. Uncertainty (95%) bounds are between 49 and 59.
Country: China, Hong Kong SAR , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 60.2. Uncertainty (95%) bounds are between 52.1 and 62.3.
Country: China, Hong Kong SAR , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 63.7. Uncertainty (95%) bounds are between 55.3 and 65.7.
Country: China, Hong Kong SAR , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 66.8. Uncertainty (95%) bounds are between 58.5 and 68.9.
Country: China, Hong Kong SAR , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 69.4. Uncertainty (95%) bounds are between 61.7 and 71.3.
Country: China, Hong Kong SAR , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 71.6. Uncertainty (95%) bounds are between 64.3 and 73.3.
Country: China, Hong Kong SAR , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 73.3. Uncertainty (95%) bounds are between 65.9 and 74.9.
Country: China, Hong Kong SAR , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 74.5. Uncertainty (95%) bounds are between 67.1 and 76.2.
Country: China, Hong Kong SAR , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 75.5. Uncertainty (95%) bounds are between 68.3 and 77.2.
Country: China, Hong Kong SAR , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 76.3. Uncertainty (95%) bounds are between 69.6 and 77.9.
Country: China, Hong Kong SAR , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 77.1. Uncertainty (95%) bounds are between 70.8 and 78.6.
Country: China, Hong Kong SAR , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.2 and 78.4. Uncertainty (95%) bounds are between 72 and 79.9.
Country: China, Hong Kong SAR , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.4 and 79.7. Uncertainty (95%) bounds are between 73.3 and 81.2.
Country: China, Hong Kong SAR , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.8 and 80.8. Uncertainty (95%) bounds are between 74.7 and 82.2.
Country: China, Hong Kong SAR , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.4 and 81.8. Uncertainty (95%) bounds are between 76.2 and 83.1.
Country: China, Hong Kong SAR , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.9 and 82.7. Uncertainty (95%) bounds are between 77.5 and 83.9.
Country: China, Hong Kong SAR , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.8 and 83.7. Uncertainty (95%) bounds are between 78.4 and 84.9.
Country: China, Hong Kong SAR , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 77.7 and 84.6. Uncertainty (95%) bounds are between 79.3 and 85.8.
Country: China, Hong Kong SAR , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 78.7 and 85.3. Uncertainty (95%) bounds are between 80.3 and 86.5.
Country: China, Hong Kong SAR , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 79.7 and 86. Uncertainty (95%) bounds are between 81.3 and 87.
Country: China, Hong Kong SAR , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 80.7 and 86.5. Uncertainty (95%) bounds are between 82 and 87.4.
Country: China, Hong Kong SAR , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 80.9 and 86.9. Uncertainty (95%) bounds are between 82.4 and 87.9.
Country: China, Hong Kong SAR , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 81 and 87.2. Uncertainty (95%) bounds are between 82.5 and 88.2.
Country: China, Hong Kong SAR , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 81.1 and 87.3. Uncertainty (95%) bounds are between 82.7 and 88.3.
Country: China, Hong Kong SAR , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 81.4 and 87.2. Uncertainty (95%) bounds are between 82.8 and 88.2.
Country: China, Hong Kong SAR , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 81.4 and 87.1. Uncertainty (95%) bounds are between 82.9 and 88.1.
Country: China, Hong Kong SAR , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 81 and 87. Uncertainty (95%) bounds are between 82.5 and 88.
Country: China, Hong Kong SAR , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 80.5 and 86.8. Uncertainty (95%) bounds are between 82.1 and 87.9.
Country: China, Hong Kong SAR , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 80.1 and 86.5. Uncertainty (95%) bounds are between 81.7 and 87.6.
Country: China, Hong Kong SAR , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 79.8 and 86. Uncertainty (95%) bounds are between 81.3 and 87.1.
Country: China, Hong Kong SAR , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 79.4 and 85.5. Uncertainty (95%) bounds are between 80.8 and 86.5.
Country: China, Hong Kong SAR , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 78.5 and 85. Uncertainty (95%) bounds are between 80 and 86.2.
Country: China, Hong Kong SAR , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 77.5 and 84.5. Uncertainty (95%) bounds are between 79.1 and 85.7.
Country: China, Hong Kong SAR , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.5 and 83.8. Uncertainty (95%) bounds are between 78.2 and 85.1.
Country: China, Hong Kong SAR , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.7 and 82.9. Uncertainty (95%) bounds are between 77.5 and 84.2.
Country: China, Hong Kong SAR , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75 and 82. Uncertainty (95%) bounds are between 76.7 and 83.3.
Country: China, Hong Kong SAR , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.7 and 81.3. Uncertainty (95%) bounds are between 75.5 and 82.6.
Country: China, Hong Kong SAR , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.4 and 80.5. Uncertainty (95%) bounds are between 74.3 and 81.9.
Country: China, Hong Kong SAR , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.3 and 79.5. Uncertainty (95%) bounds are between 73.2 and 81.1.
Country: China, Hong Kong SAR , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.3 and 78.5. Uncertainty (95%) bounds are between 72.2 and 80.
Country: China, Hong Kong SAR , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 77.3. Uncertainty (95%) bounds are between 71.3 and 78.8.
Country: China, Hong Kong SAR , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 76.4. Uncertainty (95%) bounds are between 69.9 and 77.9.
Country: China, Hong Kong SAR , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 75.4. Uncertainty (95%) bounds are between 68.5 and 77.
Country: China, Hong Kong SAR , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 74.2. Uncertainty (95%) bounds are between 67.3 and 75.9.
Country: China, Hong Kong SAR , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 73. Uncertainty (95%) bounds are between 66.4 and 74.7.
Country: China, Hong Kong SAR , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 72.3. Uncertainty (95%) bounds are between 65.6 and 73.9.
Country: China, Hong Kong SAR , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.5 and 72.7. Uncertainty (95%) bounds are between 64.7 and 74.6.
Country: China, Hong Kong SAR , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.2 and 73.6. Uncertainty (95%) bounds are between 63.9 and 75.9.
Country: China, Hong Kong SAR , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 60 and 74.5. Uncertainty (95%) bounds are between 63.3 and 77.1.
Country: China, Hong Kong SAR , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 59 and 75.4. Uncertainty (95%) bounds are between 63 and 78.2.
Country: China, Hong Kong SAR , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 76.3. Uncertainty (95%) bounds are between 62.6 and 79.3.
Country: China, Taiwan Province of China , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.1 and 40.9. Uncertainty (95%) bounds are between 27.9 and 42.7.
Country: China, Taiwan Province of China , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.1 and 45.1. Uncertainty (95%) bounds are between 31.4 and 47.1.
Country: China, Taiwan Province of China , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.4 and 49.6. Uncertainty (95%) bounds are between 35.3 and 51.7.
Country: China, Taiwan Province of China , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32 and 53.9. Uncertainty (95%) bounds are between 39.2 and 56.1.
Country: China, Taiwan Province of China , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.9 and 57.8. Uncertainty (95%) bounds are between 42.5 and 60.1.
Country: China, Taiwan Province of China , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.7 and 61.2. Uncertainty (95%) bounds are between 45.4 and 63.6.
Country: China, Taiwan Province of China , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 64. Uncertainty (95%) bounds are between 48.2 and 66.4.
Country: China, Taiwan Province of China , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.9 and 66.2. Uncertainty (95%) bounds are between 50.8 and 68.5.
Country: China, Taiwan Province of China , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.2 and 68.1. Uncertainty (95%) bounds are between 53.4 and 70.1.
Country: China, Taiwan Province of China , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.4 and 69.7. Uncertainty (95%) bounds are between 55.6 and 71.5.
Country: China, Taiwan Province of China , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.7 and 71.4. Uncertainty (95%) bounds are between 57.2 and 73.3.
Country: China, Taiwan Province of China , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 72.9. Uncertainty (95%) bounds are between 58.4 and 75.
Country: China, Taiwan Province of China , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 74. Uncertainty (95%) bounds are between 59.5 and 76.2.
Country: China, Taiwan Province of China , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 74.9. Uncertainty (95%) bounds are between 60.6 and 77.
Country: China, Taiwan Province of China , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 75.6. Uncertainty (95%) bounds are between 61.8 and 77.5.
Country: China, Taiwan Province of China , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 76. Uncertainty (95%) bounds are between 62.9 and 77.8.
Country: China, Taiwan Province of China , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.9 and 76.5. Uncertainty (95%) bounds are between 63.9 and 78.2.
Country: China, Taiwan Province of China , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 77.6. Uncertainty (95%) bounds are between 64.8 and 79.4.
Country: China, Taiwan Province of China , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 78.9. Uncertainty (95%) bounds are between 65.7 and 80.7.
Country: China, Taiwan Province of China , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 79.9. Uncertainty (95%) bounds are between 66.6 and 81.9.
Country: China, Taiwan Province of China , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.6 and 80.8. Uncertainty (95%) bounds are between 67.5 and 83.1.
Country: China, Taiwan Province of China , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 81.8. Uncertainty (95%) bounds are between 68.5 and 83.9.
Country: China, Taiwan Province of China , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 82.6. Uncertainty (95%) bounds are between 69.4 and 84.6.
Country: China, Taiwan Province of China , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 83.3. Uncertainty (95%) bounds are between 70.4 and 85.2.
Country: China, Taiwan Province of China , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 83.8. Uncertainty (95%) bounds are between 71.5 and 85.7.
Country: China, Taiwan Province of China , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 84.3. Uncertainty (95%) bounds are between 72.5 and 86.
Country: China, Taiwan Province of China , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 84.5. Uncertainty (95%) bounds are between 73.4 and 86.1.
Country: China, Taiwan Province of China , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67 and 84.7. Uncertainty (95%) bounds are between 74 and 86.
Country: China, Taiwan Province of China , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 84.6. Uncertainty (95%) bounds are between 74.3 and 85.8.
Country: China, Taiwan Province of China , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 84.2. Uncertainty (95%) bounds are between 73.6 and 85.5.
Country: China, Taiwan Province of China , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 83.6. Uncertainty (95%) bounds are between 72.4 and 85.
Country: China, Taiwan Province of China , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 82.8. Uncertainty (95%) bounds are between 70.9 and 84.4.
Country: China, Taiwan Province of China , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 81.8. Uncertainty (95%) bounds are between 69.6 and 83.5.
Country: China, Taiwan Province of China , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 80.8. Uncertainty (95%) bounds are between 68.4 and 82.5.
Country: China, Taiwan Province of China , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 80. Uncertainty (95%) bounds are between 67.3 and 81.7.
Country: China, Taiwan Province of China , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 79.9. Uncertainty (95%) bounds are between 67 and 81.7.
Country: China, Taiwan Province of China , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 80.1. Uncertainty (95%) bounds are between 66.9 and 81.8.
Country: China, Taiwan Province of China , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 80.2. Uncertainty (95%) bounds are between 67.1 and 82.
Country: China, Taiwan Province of China , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 80.4. Uncertainty (95%) bounds are between 67.3 and 82.1.
Country: China, Taiwan Province of China , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 80.6. Uncertainty (95%) bounds are between 67.2 and 82.3.
Country: China, Taiwan Province of China , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 80.6. Uncertainty (95%) bounds are between 67.1 and 82.3.
Country: China, Taiwan Province of China , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 80.5. Uncertainty (95%) bounds are between 66.8 and 82.3.
Country: China, Taiwan Province of China , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 80.4. Uncertainty (95%) bounds are between 66.6 and 82.1.
Country: China, Taiwan Province of China , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 80.1. Uncertainty (95%) bounds are between 66.1 and 81.9.
Country: China, Taiwan Province of China , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 79.8. Uncertainty (95%) bounds are between 65.6 and 81.7.
Country: China, Taiwan Province of China , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 79.4. Uncertainty (95%) bounds are between 65.1 and 81.5.
Country: China, Taiwan Province of China , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 79.2. Uncertainty (95%) bounds are between 64.7 and 81.3.
Country: China, Taiwan Province of China , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 79.4. Uncertainty (95%) bounds are between 64.6 and 81.8.
Country: China, Taiwan Province of China , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 80. Uncertainty (95%) bounds are between 64.4 and 82.5.
Country: China, Taiwan Province of China , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 80.5. Uncertainty (95%) bounds are between 64.3 and 83.2.
Country: China, Taiwan Province of China , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 81.1. Uncertainty (95%) bounds are between 64.1 and 84.
Country: China, Taiwan Province of China , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 81.6. Uncertainty (95%) bounds are between 64 and 84.7.
Country: China, Taiwan Province of China , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 82.1. Uncertainty (95%) bounds are between 63.9 and 85.4.
Country: Croatia , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.8 and 70.6. Uncertainty (95%) bounds are between 48 and 75.7.
Country: Croatia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.4 and 70.8. Uncertainty (95%) bounds are between 48.4 and 75.8.
Country: Croatia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.9 and 71.2. Uncertainty (95%) bounds are between 49 and 76.2.
Country: Croatia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 71.7. Uncertainty (95%) bounds are between 49.3 and 76.5.
Country: Croatia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.3 and 72.1. Uncertainty (95%) bounds are between 49.8 and 76.9.
Country: Croatia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.7 and 72.6. Uncertainty (95%) bounds are between 50.1 and 77.4.
Country: Croatia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 72.9. Uncertainty (95%) bounds are between 50.4 and 77.7.
Country: Croatia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.6 and 73.4. Uncertainty (95%) bounds are between 50.8 and 78.1.
Country: Croatia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 73.7. Uncertainty (95%) bounds are between 51.4 and 78.3.
Country: Croatia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.4 and 74.1. Uncertainty (95%) bounds are between 52 and 78.7.
Country: Croatia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 46 and 74.4. Uncertainty (95%) bounds are between 52.6 and 79.
Country: Croatia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 74.6. Uncertainty (95%) bounds are between 53.2 and 79.1.
Country: Croatia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 74.9. Uncertainty (95%) bounds are between 53.8 and 79.2.
Country: Croatia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 75.1. Uncertainty (95%) bounds are between 54.5 and 79.4.
Country: Croatia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.9 and 75.3. Uncertainty (95%) bounds are between 55.3 and 79.3.
Country: Croatia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.9 and 75.4. Uncertainty (95%) bounds are between 56 and 79.5.
Country: Croatia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 75.5. Uncertainty (95%) bounds are between 56.9 and 79.5.
Country: Croatia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.6 and 75.7. Uncertainty (95%) bounds are between 57.6 and 79.5.
Country: Croatia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 75.7. Uncertainty (95%) bounds are between 58.3 and 79.4.
Country: Croatia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.2 and 75.8. Uncertainty (95%) bounds are between 58.9 and 79.5.
Country: Croatia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 76. Uncertainty (95%) bounds are between 59.5 and 79.6.
Country: Croatia , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.4 and 76.4. Uncertainty (95%) bounds are between 59.4 and 79.9.
Country: Croatia , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 76.8. Uncertainty (95%) bounds are between 58.9 and 80.6.
Country: Croatia , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 52 and 77.5. Uncertainty (95%) bounds are between 58.5 and 81.2.
Country: Croatia , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 77.9. Uncertainty (95%) bounds are between 58 and 81.9.
Country: Croatia , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 78.5. Uncertainty (95%) bounds are between 57.5 and 82.6.
Country: Croatia , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.9 and 79. Uncertainty (95%) bounds are between 56.9 and 83.2.
Country: Croatia , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 79.4. Uncertainty (95%) bounds are between 56.4 and 83.7.
Country: Croatia , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.5 and 79.8. Uncertainty (95%) bounds are between 56.2 and 84.3.
Country: Croatia , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 80.3. Uncertainty (95%) bounds are between 55.8 and 84.8.
Country: Croatia , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 80.6. Uncertainty (95%) bounds are between 55.4 and 85.2.
Country: Croatia , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 80.9. Uncertainty (95%) bounds are between 55 and 85.4.
Country: Croatia , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 46 and 81.3. Uncertainty (95%) bounds are between 54.8 and 85.8.
Country: Croatia , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 81.7. Uncertainty (95%) bounds are between 54.4 and 86.3.
Country: Croatia , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.8 and 82. Uncertainty (95%) bounds are between 54.1 and 86.7.
Country: Croatia , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.3 and 82.3. Uncertainty (95%) bounds are between 53.8 and 87.
Country: Croatia , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.9 and 82.5. Uncertainty (95%) bounds are between 53.6 and 87.4.
Country: Croatia , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.3 and 82.8. Uncertainty (95%) bounds are between 53.1 and 87.7.
Country: Croatia , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 43 and 83.1. Uncertainty (95%) bounds are between 52.9 and 88.
Country: Croatia , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.9 and 83.3. Uncertainty (95%) bounds are between 52.4 and 88.4.
Country: Croatia , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.2 and 83.5. Uncertainty (95%) bounds are between 52.1 and 88.7.
Country: Croatia , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.6 and 83.7. Uncertainty (95%) bounds are between 51.9 and 88.9.
Country: Croatia , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 41 and 84. Uncertainty (95%) bounds are between 51.7 and 89.2.
Country: Croatia , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.5 and 84.3. Uncertainty (95%) bounds are between 51.4 and 89.3.
Country: Croatia , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.3 and 84.5. Uncertainty (95%) bounds are between 51.2 and 89.6.
Country: Croatia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.9 and 84.7. Uncertainty (95%) bounds are between 51 and 89.8.
Country: Croatia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 84.9. Uncertainty (95%) bounds are between 50.7 and 90.1.
Country: Croatia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.2 and 85.1. Uncertainty (95%) bounds are between 50.5 and 90.3.
Country: Croatia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 39 and 85.3. Uncertainty (95%) bounds are between 50.3 and 90.5.
Country: Croatia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 85.5. Uncertainty (95%) bounds are between 50.1 and 90.7.
Country: Croatia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.6 and 85.6. Uncertainty (95%) bounds are between 50 and 91.
Country: Croatia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 85.8. Uncertainty (95%) bounds are between 49.7 and 91.1.
Country: Croatia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 86. Uncertainty (95%) bounds are between 49.4 and 91.3.
Country: Czechia , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.8 and 73.2. Uncertainty (95%) bounds are between 51.1 and 77.8.
Country: Czechia , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.2 and 73.7. Uncertainty (95%) bounds are between 51.6 and 78.3.
Country: Czechia , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.7 and 74.2. Uncertainty (95%) bounds are between 52.1 and 78.8.
Country: Czechia , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 74.8. Uncertainty (95%) bounds are between 52.7 and 79.3.
Country: Czechia , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 75.2. Uncertainty (95%) bounds are between 53.4 and 79.7.
Country: Czechia , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.4 and 75.6. Uncertainty (95%) bounds are between 53.9 and 80.1.
Country: Czechia , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 76. Uncertainty (95%) bounds are between 54.7 and 80.4.
Country: Czechia , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 76.4. Uncertainty (95%) bounds are between 55.4 and 80.7.
Country: Czechia , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 76.6. Uncertainty (95%) bounds are between 56.2 and 81.
Country: Czechia , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 76.9. Uncertainty (95%) bounds are between 57.1 and 81.1.
Country: Czechia , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 77.2. Uncertainty (95%) bounds are between 57.8 and 81.2.
Country: Czechia , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 77.4. Uncertainty (95%) bounds are between 58.7 and 81.1.
Country: Czechia , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 77.6. Uncertainty (95%) bounds are between 59.6 and 81.2.
Country: Czechia , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 77.7. Uncertainty (95%) bounds are between 60.6 and 81.2.
Country: Czechia , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 77.8. Uncertainty (95%) bounds are between 61.6 and 81.2.
Country: Czechia , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 77.8. Uncertainty (95%) bounds are between 62.6 and 81.
Country: Czechia , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 77.8. Uncertainty (95%) bounds are between 63.6 and 80.8.
Country: Czechia , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 77.8. Uncertainty (95%) bounds are between 64.7 and 80.5.
Country: Czechia , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 77.6. Uncertainty (95%) bounds are between 65.8 and 80.3.
Country: Czechia , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 77.5. Uncertainty (95%) bounds are between 66.9 and 79.9.
Country: Czechia , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 77.4. Uncertainty (95%) bounds are between 67.9 and 79.7.
Country: Czechia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 77.6. Uncertainty (95%) bounds are between 68.4 and 79.6.
Country: Czechia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 77.7. Uncertainty (95%) bounds are between 68.3 and 79.7.
Country: Czechia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 77.9. Uncertainty (95%) bounds are between 68.2 and 80.1.
Country: Czechia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 78.5. Uncertainty (95%) bounds are between 68.5 and 80.7.
Country: Czechia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 79.2. Uncertainty (95%) bounds are between 68.9 and 81.5.
Country: Czechia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 80. Uncertainty (95%) bounds are between 69.5 and 82.3.
Country: Czechia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.7 and 80.7. Uncertainty (95%) bounds are between 70.2 and 83.
Country: Czechia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 81.5. Uncertainty (95%) bounds are between 70.7 and 83.7.
Country: Czechia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 82.2. Uncertainty (95%) bounds are between 71.2 and 84.5.
Country: Czechia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 82.9. Uncertainty (95%) bounds are between 71.8 and 85.1.
Country: Czechia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 83.5. Uncertainty (95%) bounds are between 72.4 and 85.7.
Country: Czechia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69 and 84.1. Uncertainty (95%) bounds are between 73.1 and 86.2.
Country: Czechia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 84.6. Uncertainty (95%) bounds are between 73.8 and 86.7.
Country: Czechia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.3 and 85.2. Uncertainty (95%) bounds are between 74.5 and 87.2.
Country: Czechia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 85.8. Uncertainty (95%) bounds are between 75.3 and 87.8.
Country: Czechia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.8 and 86.5. Uncertainty (95%) bounds are between 76.2 and 88.5.
Country: Czechia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.5 and 87.3. Uncertainty (95%) bounds are between 77 and 89.3.
Country: Czechia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.9 and 88. Uncertainty (95%) bounds are between 77.6 and 90.
Country: Czechia , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 72.7 and 88.5. Uncertainty (95%) bounds are between 77.6 and 90.5.
Country: Czechia , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 72.2 and 89. Uncertainty (95%) bounds are between 77.3 and 91.
Country: Czechia , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.8 and 89.3. Uncertainty (95%) bounds are between 76.9 and 91.4.
Country: Czechia , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.1 and 89.7. Uncertainty (95%) bounds are between 76.5 and 91.8.
Country: Czechia , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.4 and 89.9. Uncertainty (95%) bounds are between 76 and 92.1.
Country: Czechia , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.8 and 90.2. Uncertainty (95%) bounds are between 75.7 and 92.4.
Country: Czechia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.9 and 90.5. Uncertainty (95%) bounds are between 75.4 and 92.7.
Country: Czechia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.3 and 90.7. Uncertainty (95%) bounds are between 75 and 93.
Country: Czechia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.7 and 90.9. Uncertainty (95%) bounds are between 74.6 and 93.2.
Country: Czechia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.1 and 91.1. Uncertainty (95%) bounds are between 74.2 and 93.5.
Country: Czechia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.5 and 91.3. Uncertainty (95%) bounds are between 73.8 and 93.6.
Country: Czechia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.1 and 91.4. Uncertainty (95%) bounds are between 73.5 and 93.8.
Country: Czechia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.5 and 91.6. Uncertainty (95%) bounds are between 73.2 and 94.
Country: Czechia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.8 and 91.7. Uncertainty (95%) bounds are between 72.9 and 94.2.
Country: Denmark , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 70.1. Uncertainty (95%) bounds are between 57.5 and 73.
Country: Denmark , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 70.1. Uncertainty (95%) bounds are between 58 and 72.9.
Country: Denmark , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 70.3. Uncertainty (95%) bounds are between 58.3 and 73.2.
Country: Denmark , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 70.6. Uncertainty (95%) bounds are between 58.7 and 73.5.
Country: Denmark , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 71. Uncertainty (95%) bounds are between 59 and 73.8.
Country: Denmark , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 71.6. Uncertainty (95%) bounds are between 59.5 and 74.4.
Country: Denmark , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 72.4. Uncertainty (95%) bounds are between 59.9 and 75.2.
Country: Denmark , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 73.5. Uncertainty (95%) bounds are between 60.4 and 76.4.
Country: Denmark , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 74.6. Uncertainty (95%) bounds are between 61 and 77.5.
Country: Denmark , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 75.5. Uncertainty (95%) bounds are between 61.7 and 78.5.
Country: Denmark , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 76.5. Uncertainty (95%) bounds are between 62.6 and 79.5.
Country: Denmark , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 77.4. Uncertainty (95%) bounds are between 63.4 and 80.3.
Country: Denmark , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.2 and 78.1. Uncertainty (95%) bounds are between 64.4 and 81.1.
Country: Denmark , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 78.8. Uncertainty (95%) bounds are between 65.4 and 81.7.
Country: Denmark , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 79.4. Uncertainty (95%) bounds are between 66.4 and 82.2.
Country: Denmark , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 79.9. Uncertainty (95%) bounds are between 67.4 and 82.6.
Country: Denmark , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 80.3. Uncertainty (95%) bounds are between 68.5 and 82.9.
Country: Denmark , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 80.5. Uncertainty (95%) bounds are between 69.5 and 83.
Country: Denmark , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.4 and 80.6. Uncertainty (95%) bounds are between 70.4 and 82.9.
Country: Denmark , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 80.2. Uncertainty (95%) bounds are between 71.1 and 82.4.
Country: Denmark , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.3 and 79.7. Uncertainty (95%) bounds are between 71.7 and 81.6.
Country: Denmark , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 79.5. Uncertainty (95%) bounds are between 72.1 and 81.2.
Country: Denmark , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 79.5. Uncertainty (95%) bounds are between 72.1 and 81.3.
Country: Denmark , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.1 and 80. Uncertainty (95%) bounds are between 71.7 and 81.9.
Country: Denmark , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.1 and 80.7. Uncertainty (95%) bounds are between 71 and 82.8.
Country: Denmark , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.9 and 81.3. Uncertainty (95%) bounds are between 70.2 and 83.6.
Country: Denmark , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.7 and 81.9. Uncertainty (95%) bounds are between 69.5 and 84.5.
Country: Denmark , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.5 and 82.5. Uncertainty (95%) bounds are between 68.8 and 85.3.
Country: Denmark , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.5 and 82.9. Uncertainty (95%) bounds are between 68.2 and 85.9.
Country: Denmark , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.5 and 83.3. Uncertainty (95%) bounds are between 67.6 and 86.4.
Country: Denmark , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.5 and 83.8. Uncertainty (95%) bounds are between 67.1 and 87.
Country: Denmark , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 84.2. Uncertainty (95%) bounds are between 66.5 and 87.5.
Country: Denmark , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 84.6. Uncertainty (95%) bounds are between 66.1 and 88.
Country: Denmark , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 59 and 85. Uncertainty (95%) bounds are between 65.7 and 88.5.
Country: Denmark , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.4 and 85.3. Uncertainty (95%) bounds are between 65.1 and 88.9.
Country: Denmark , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.9 and 85.6. Uncertainty (95%) bounds are between 64.7 and 89.2.
Country: Denmark , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 85.9. Uncertainty (95%) bounds are between 64.4 and 89.6.
Country: Denmark , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 86.1. Uncertainty (95%) bounds are between 63.9 and 89.9.
Country: Denmark , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 86.4. Uncertainty (95%) bounds are between 63.6 and 90.1.
Country: Denmark , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 86.7. Uncertainty (95%) bounds are between 63.2 and 90.4.
Country: Denmark , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.5 and 86.9. Uncertainty (95%) bounds are between 62.8 and 90.7.
Country: Denmark , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 87.1. Uncertainty (95%) bounds are between 62.4 and 90.9.
Country: Denmark , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.2 and 87.3. Uncertainty (95%) bounds are between 62.1 and 91.3.
Country: Denmark , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 87.6. Uncertainty (95%) bounds are between 61.7 and 91.4.
Country: Denmark , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.1 and 87.8. Uncertainty (95%) bounds are between 61.5 and 91.6.
Country: Denmark , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.6 and 88. Uncertainty (95%) bounds are between 61.1 and 91.8.
Country: Denmark , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.2 and 88.3. Uncertainty (95%) bounds are between 60.8 and 92.
Country: Denmark , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 88.4. Uncertainty (95%) bounds are between 60.5 and 92.2.
Country: Denmark , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 88.5. Uncertainty (95%) bounds are between 60.3 and 92.4.
Country: Denmark , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 88.7. Uncertainty (95%) bounds are between 60.1 and 92.5.
Country: Denmark , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 88.8. Uncertainty (95%) bounds are between 59.9 and 92.8.
Country: Denmark , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 89. Uncertainty (95%) bounds are between 59.7 and 92.9.
Country: Denmark , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 89.1. Uncertainty (95%) bounds are between 59.4 and 93.1.
Country: Estonia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.1 and 81.8. Uncertainty (95%) bounds are between 40.9 and 87.6.
Country: Estonia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.4 and 81.5. Uncertainty (95%) bounds are between 41.8 and 87.3.
Country: Estonia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 81.3. Uncertainty (95%) bounds are between 42.6 and 87.
Country: Estonia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.7 and 81. Uncertainty (95%) bounds are between 43.6 and 86.5.
Country: Estonia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 80.8. Uncertainty (95%) bounds are between 44.5 and 86.3.
Country: Estonia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.2 and 80.5. Uncertainty (95%) bounds are between 45.4 and 86.
Country: Estonia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 80.2. Uncertainty (95%) bounds are between 46.4 and 85.5.
Country: Estonia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 79.9. Uncertainty (95%) bounds are between 47.5 and 85.1.
Country: Estonia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.1 and 79.7. Uncertainty (95%) bounds are between 48.6 and 84.6.
Country: Estonia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.4 and 79.3. Uncertainty (95%) bounds are between 49.4 and 84.2.
Country: Estonia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 78.9. Uncertainty (95%) bounds are between 50.2 and 83.7.
Country: Estonia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.2 and 78.5. Uncertainty (95%) bounds are between 51.1 and 83.3.
Country: Estonia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 78.1. Uncertainty (95%) bounds are between 52 and 82.8.
Country: Estonia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 77.7. Uncertainty (95%) bounds are between 53 and 82.2.
Country: Estonia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 77.3. Uncertainty (95%) bounds are between 54 and 81.5.
Country: Estonia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 76.8. Uncertainty (95%) bounds are between 55 and 80.7.
Country: Estonia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.5 and 76.2. Uncertainty (95%) bounds are between 56.1 and 80.
Country: Estonia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 75.7. Uncertainty (95%) bounds are between 56.9 and 79.3.
Country: Estonia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 75.1. Uncertainty (95%) bounds are between 57.8 and 78.5.
Country: Estonia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 74.4. Uncertainty (95%) bounds are between 58.7 and 77.7.
Country: Estonia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.8 and 73.8. Uncertainty (95%) bounds are between 59.3 and 76.9.
Country: Estonia , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 73.3. Uncertainty (95%) bounds are between 59.5 and 76.4.
Country: Estonia , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 72.9. Uncertainty (95%) bounds are between 59.4 and 75.9.
Country: Estonia , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.5 and 72.5. Uncertainty (95%) bounds are between 59.3 and 75.5.
Country: Estonia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 72.1. Uncertainty (95%) bounds are between 59.1 and 75.2.
Country: Estonia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 72. Uncertainty (95%) bounds are between 58.9 and 75.2.
Country: Estonia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 72. Uncertainty (95%) bounds are between 58.7 and 75.1.
Country: Estonia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 72. Uncertainty (95%) bounds are between 58.6 and 75.2.
Country: Estonia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 72. Uncertainty (95%) bounds are between 58.6 and 75.1.
Country: Estonia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 71.8. Uncertainty (95%) bounds are between 58.8 and 74.9.
Country: Estonia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 71.7. Uncertainty (95%) bounds are between 59 and 74.6.
Country: Estonia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 71.3. Uncertainty (95%) bounds are between 59.4 and 74.2.
Country: Estonia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 70.9. Uncertainty (95%) bounds are between 60.1 and 73.5.
Country: Estonia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 70.5. Uncertainty (95%) bounds are between 60.9 and 72.9.
Country: Estonia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 70. Uncertainty (95%) bounds are between 61.8 and 72.2.
Country: Estonia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 69.8. Uncertainty (95%) bounds are between 62.8 and 71.7.
Country: Estonia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 70. Uncertainty (95%) bounds are between 63.6 and 71.8.
Country: Estonia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 70.5. Uncertainty (95%) bounds are between 63.7 and 72.3.
Country: Estonia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 70.9. Uncertainty (95%) bounds are between 63.7 and 72.7.
Country: Estonia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 71. Uncertainty (95%) bounds are between 64.1 and 72.8.
Country: Estonia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 71.2. Uncertainty (95%) bounds are between 64.5 and 72.9.
Country: Estonia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 71.7. Uncertainty (95%) bounds are between 64.8 and 73.5.
Country: Estonia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 72.2. Uncertainty (95%) bounds are between 65.3 and 74.
Country: Estonia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 72.5. Uncertainty (95%) bounds are between 65.9 and 74.3.
Country: Estonia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.5 and 72.9. Uncertainty (95%) bounds are between 66.3 and 74.7.
Country: Estonia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.7 and 73.8. Uncertainty (95%) bounds are between 65.9 and 75.8.
Country: Estonia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.4 and 74.8. Uncertainty (95%) bounds are between 65.1 and 77.
Country: Estonia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.9 and 75.7. Uncertainty (95%) bounds are between 64.3 and 78.2.
Country: Estonia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.6 and 76.5. Uncertainty (95%) bounds are between 63.5 and 79.3.
Country: Estonia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 77.2. Uncertainty (95%) bounds are between 62.8 and 80.3.
Country: Estonia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 77.9. Uncertainty (95%) bounds are between 62.1 and 81.1.
Country: Estonia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 78.4. Uncertainty (95%) bounds are between 61.4 and 82.
Country: Estonia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 79. Uncertainty (95%) bounds are between 60.7 and 82.7.
Country: Finland , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 64 and 81.7. Uncertainty (95%) bounds are between 68.2 and 84.4.
Country: Finland , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 81.4. Uncertainty (95%) bounds are between 68.7 and 84.1.
Country: Finland , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.5 and 81.3. Uncertainty (95%) bounds are between 68.7 and 84.
Country: Finland , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 81.3. Uncertainty (95%) bounds are between 68.5 and 84.
Country: Finland , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 81.3. Uncertainty (95%) bounds are between 68.2 and 84.
Country: Finland , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 81.4. Uncertainty (95%) bounds are between 68 and 84.
Country: Finland , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 81.4. Uncertainty (95%) bounds are between 67.8 and 84.
Country: Finland , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 81.4. Uncertainty (95%) bounds are between 67.5 and 83.9.
Country: Finland , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 81.4. Uncertainty (95%) bounds are between 67.1 and 83.9.
Country: Finland , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 81.4. Uncertainty (95%) bounds are between 66.9 and 84.
Country: Finland , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 81.3. Uncertainty (95%) bounds are between 66.6 and 84.
Country: Finland , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 81.2. Uncertainty (95%) bounds are between 66.3 and 83.9.
Country: Finland , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 81.1. Uncertainty (95%) bounds are between 66.1 and 83.8.
Country: Finland , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 80.9. Uncertainty (95%) bounds are between 66 and 83.7.
Country: Finland , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 80.6. Uncertainty (95%) bounds are between 66 and 83.3.
Country: Finland , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 80.3. Uncertainty (95%) bounds are between 65.9 and 83.
Country: Finland , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 80. Uncertainty (95%) bounds are between 66 and 82.4.
Country: Finland , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 79.6. Uncertainty (95%) bounds are between 66.2 and 81.9.
Country: Finland , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 79.1. Uncertainty (95%) bounds are between 66.4 and 81.3.
Country: Finland , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 78.7. Uncertainty (95%) bounds are between 66.6 and 80.7.
Country: Finland , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 78.5. Uncertainty (95%) bounds are between 66.8 and 80.2.
Country: Finland , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 78.6. Uncertainty (95%) bounds are between 66.8 and 80.3.
Country: Finland , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 78.7. Uncertainty (95%) bounds are between 66.8 and 80.2.
Country: Finland , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 79.1. Uncertainty (95%) bounds are between 66.7 and 80.7.
Country: Finland , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 79.5. Uncertainty (95%) bounds are between 66.5 and 81.2.
Country: Finland , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 79.6. Uncertainty (95%) bounds are between 66.3 and 81.6.
Country: Finland , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 79.7. Uncertainty (95%) bounds are between 66.3 and 81.7.
Country: Finland , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 79.6. Uncertainty (95%) bounds are between 66.3 and 81.4.
Country: Finland , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 79.5. Uncertainty (95%) bounds are between 66.4 and 81.2.
Country: Finland , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 79.3. Uncertainty (95%) bounds are between 66.4 and 80.9.
Country: Finland , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 79.3. Uncertainty (95%) bounds are between 65.9 and 81.
Country: Finland , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 79.3. Uncertainty (95%) bounds are between 65.3 and 81.2.
Country: Finland , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 79.1. Uncertainty (95%) bounds are between 64.9 and 81.2.
Country: Finland , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 78.8. Uncertainty (95%) bounds are between 64.4 and 81.
Country: Finland , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 78.5. Uncertainty (95%) bounds are between 64 and 80.7.
Country: Finland , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 78.2. Uncertainty (95%) bounds are between 63.9 and 80.2.
Country: Finland , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 77.9. Uncertainty (95%) bounds are between 63.9 and 79.8.
Country: Finland , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 77.9. Uncertainty (95%) bounds are between 64.3 and 79.7.
Country: Finland , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 78.8. Uncertainty (95%) bounds are between 65.1 and 80.6.
Country: Finland , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 79.9. Uncertainty (95%) bounds are between 66.2 and 81.8.
Country: Finland , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 81. Uncertainty (95%) bounds are between 67.4 and 83.
Country: Finland , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 82.1. Uncertainty (95%) bounds are between 68.8 and 84.
Country: Finland , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 83.1. Uncertainty (95%) bounds are between 70.3 and 84.8.
Country: Finland , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 83.9. Uncertainty (95%) bounds are between 71.7 and 85.5.
Country: Finland , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.5 and 84.6. Uncertainty (95%) bounds are between 73.1 and 85.9.
Country: Finland , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 85.1. Uncertainty (95%) bounds are between 74.1 and 86.4.
Country: Finland , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.6 and 85.7. Uncertainty (95%) bounds are between 74.5 and 87.1.
Country: Finland , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.5 and 86.2. Uncertainty (95%) bounds are between 74.4 and 87.9.
Country: Finland , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 69 and 86.7. Uncertainty (95%) bounds are between 74.1 and 88.5.
Country: Finland , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.2 and 87.1. Uncertainty (95%) bounds are between 73.7 and 89.1.
Country: Finland , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.5 and 87.5. Uncertainty (95%) bounds are between 73.3 and 89.7.
Country: Finland , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.8 and 87.8. Uncertainty (95%) bounds are between 72.9 and 90.1.
Country: Finland , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.1 and 88.1. Uncertainty (95%) bounds are between 72.4 and 90.5.
Country: France , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.1 and 75.5. Uncertainty (95%) bounds are between 58.9 and 79.2.
Country: France , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 75.5. Uncertainty (95%) bounds are between 60.1 and 79.
Country: France , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 75.9. Uncertainty (95%) bounds are between 61.3 and 79.3.
Country: France , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 76.6. Uncertainty (95%) bounds are between 62.5 and 79.7.
Country: France , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.6 and 77.2. Uncertainty (95%) bounds are between 63.8 and 80.3.
Country: France , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 77.9. Uncertainty (95%) bounds are between 65.1 and 80.9.
Country: France , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 78.6. Uncertainty (95%) bounds are between 66.3 and 81.3.
Country: France , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 79.1. Uncertainty (95%) bounds are between 67.5 and 81.7.
Country: France , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 79.6. Uncertainty (95%) bounds are between 68.5 and 82.1.
Country: France , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 80.2. Uncertainty (95%) bounds are between 69.2 and 82.6.
Country: France , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 80.6. Uncertainty (95%) bounds are between 69.6 and 82.9.
Country: France , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.7 and 80.9. Uncertainty (95%) bounds are between 70.1 and 83.2.
Country: France , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 81.2. Uncertainty (95%) bounds are between 70.7 and 83.4.
Country: France , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 81.4. Uncertainty (95%) bounds are between 71.3 and 83.6.
Country: France , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 81.5. Uncertainty (95%) bounds are between 71.9 and 83.5.
Country: France , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 81.4. Uncertainty (95%) bounds are between 72.7 and 83.3.
Country: France , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.9 and 81.3. Uncertainty (95%) bounds are between 73.5 and 83.
Country: France , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.8 and 81.1. Uncertainty (95%) bounds are between 74.1 and 82.5.
Country: France , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.3 and 80.7. Uncertainty (95%) bounds are between 74.5 and 82.
Country: France , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72 and 80.5. Uncertainty (95%) bounds are between 74 and 81.9.
Country: France , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.2 and 80.3. Uncertainty (95%) bounds are between 73.3 and 81.9.
Country: France , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.5 and 80.3. Uncertainty (95%) bounds are between 72.8 and 82.
Country: France , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70 and 80.3. Uncertainty (95%) bounds are between 72.5 and 82.2.
Country: France , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 80.3. Uncertainty (95%) bounds are between 72.2 and 82.2.
Country: France , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 80.2. Uncertainty (95%) bounds are between 72 and 82.2.
Country: France , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.1 and 80.3. Uncertainty (95%) bounds are between 71.8 and 82.3.
Country: France , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 80.4. Uncertainty (95%) bounds are between 71.7 and 82.3.
Country: France , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 80.3. Uncertainty (95%) bounds are between 71.6 and 82.2.
Country: France , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 80.1. Uncertainty (95%) bounds are between 71.7 and 82.
Country: France , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.3 and 79.9. Uncertainty (95%) bounds are between 71.9 and 81.7.
Country: France , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.6 and 79.7. Uncertainty (95%) bounds are between 72 and 81.4.
Country: France , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 79.4. Uncertainty (95%) bounds are between 72 and 81.1.
Country: France , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.1 and 79.2. Uncertainty (95%) bounds are between 72.2 and 80.7.
Country: France , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.5 and 78.8. Uncertainty (95%) bounds are between 72.4 and 80.2.
Country: France , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.9 and 78.4. Uncertainty (95%) bounds are between 72.7 and 79.8.
Country: France , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 78.4. Uncertainty (95%) bounds are between 72.8 and 79.7.
Country: France , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.2 and 78.8. Uncertainty (95%) bounds are between 73 and 80.3.
Country: France , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.6 and 79.3. Uncertainty (95%) bounds are between 73.4 and 80.8.
Country: France , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.2 and 79.6. Uncertainty (95%) bounds are between 73.9 and 81.
Country: France , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.9 and 79.8. Uncertainty (95%) bounds are between 74.5 and 81.1.
Country: France , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.3 and 80. Uncertainty (95%) bounds are between 74.8 and 81.3.
Country: France , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.6 and 80.7. Uncertainty (95%) bounds are between 74.5 and 82.1.
Country: France , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.4 and 81.4. Uncertainty (95%) bounds are between 73.8 and 83.1.
Country: France , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.1 and 82.1. Uncertainty (95%) bounds are between 73 and 84.
Country: France , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.9 and 82.8. Uncertainty (95%) bounds are between 72.3 and 84.9.
Country: France , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.7 and 83.4. Uncertainty (95%) bounds are between 71.5 and 85.7.
Country: France , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.6 and 83.9. Uncertainty (95%) bounds are between 70.9 and 86.2.
Country: France , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.5 and 84.3. Uncertainty (95%) bounds are between 70.3 and 86.9.
Country: France , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.5 and 84.6. Uncertainty (95%) bounds are between 69.7 and 87.4.
Country: France , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.5 and 85.1. Uncertainty (95%) bounds are between 69.2 and 87.9.
Country: France , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 85.4. Uncertainty (95%) bounds are between 68.5 and 88.4.
Country: France , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 85.7. Uncertainty (95%) bounds are between 68 and 88.8.
Country: France , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 86. Uncertainty (95%) bounds are between 67.5 and 89.2.
Country: Georgia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 37.8. Uncertainty (95%) bounds are between 5.2 and 56.5.
Country: Georgia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 2.9 and 38.2. Uncertainty (95%) bounds are between 5.6 and 56.4.
Country: Georgia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.2 and 38.5. Uncertainty (95%) bounds are between 6 and 56.3.
Country: Georgia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 39. Uncertainty (95%) bounds are between 6.4 and 56.1.
Country: Georgia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 39.2. Uncertainty (95%) bounds are between 6.9 and 56.1.
Country: Georgia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 39.6. Uncertainty (95%) bounds are between 7.3 and 55.7.
Country: Georgia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.6 and 39.9. Uncertainty (95%) bounds are between 7.9 and 55.5.
Country: Georgia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 40.4. Uncertainty (95%) bounds are between 8.4 and 55.1.
Country: Georgia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.6 and 40.8. Uncertainty (95%) bounds are between 9 and 54.9.
Country: Georgia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 41.2. Uncertainty (95%) bounds are between 9.6 and 55.1.
Country: Georgia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 41.5. Uncertainty (95%) bounds are between 10.2 and 54.7.
Country: Georgia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 41.8. Uncertainty (95%) bounds are between 10.9 and 54.6.
Country: Georgia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.8 and 41.9. Uncertainty (95%) bounds are between 11.7 and 54.2.
Country: Georgia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 42.2. Uncertainty (95%) bounds are between 12.5 and 53.6.
Country: Georgia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 42.5. Uncertainty (95%) bounds are between 13.2 and 53.7.
Country: Georgia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 10 and 42.5. Uncertainty (95%) bounds are between 14.1 and 53.4.
Country: Georgia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 42.6. Uncertainty (95%) bounds are between 15.1 and 53.2.
Country: Georgia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.8 and 42.8. Uncertainty (95%) bounds are between 16 and 52.9.
Country: Georgia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.7 and 43. Uncertainty (95%) bounds are between 17 and 52.4.
Country: Georgia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 43.2. Uncertainty (95%) bounds are between 18 and 51.9.
Country: Georgia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.8 and 43.2. Uncertainty (95%) bounds are between 19.1 and 51.5.
Country: Georgia , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.7 and 43.5. Uncertainty (95%) bounds are between 20 and 51.3.
Country: Georgia , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.9 and 43.6. Uncertainty (95%) bounds are between 20.9 and 51.
Country: Georgia , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.9 and 43.7. Uncertainty (95%) bounds are between 22 and 50.6.
Country: Georgia , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.9 and 43.8. Uncertainty (95%) bounds are between 23.1 and 50.4.
Country: Georgia , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 20 and 43.8. Uncertainty (95%) bounds are between 24.1 and 50.
Country: Georgia , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 43.8. Uncertainty (95%) bounds are between 25.3 and 49.5.
Country: Georgia , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.5 and 43.7. Uncertainty (95%) bounds are between 26.3 and 48.9.
Country: Georgia , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 43.7. Uncertainty (95%) bounds are between 27.4 and 48.4.
Country: Georgia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.2 and 43.7. Uncertainty (95%) bounds are between 28.6 and 48.1.
Country: Georgia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 43.9. Uncertainty (95%) bounds are between 29.8 and 48.
Country: Georgia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.7 and 44.3. Uncertainty (95%) bounds are between 30.8 and 48.1.
Country: Georgia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.8 and 44.6. Uncertainty (95%) bounds are between 31.8 and 48.3.
Country: Georgia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30 and 44.9. Uncertainty (95%) bounds are between 32.9 and 48.5.
Country: Georgia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.3 and 45.2. Uncertainty (95%) bounds are between 34 and 48.5.
Country: Georgia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.6 and 45.5. Uncertainty (95%) bounds are between 35.1 and 48.5.
Country: Georgia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 46.3. Uncertainty (95%) bounds are between 35.9 and 49.2.
Country: Georgia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.7 and 47. Uncertainty (95%) bounds are between 36.4 and 50.
Country: Georgia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.1 and 47.6. Uncertainty (95%) bounds are between 36.8 and 50.6.
Country: Georgia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.5 and 48.3. Uncertainty (95%) bounds are between 37.3 and 51.3.
Country: Georgia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.9 and 49.2. Uncertainty (95%) bounds are between 37.8 and 52.3.
Country: Georgia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.9 and 50.1. Uncertainty (95%) bounds are between 38 and 53.3.
Country: Georgia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 50.6. Uncertainty (95%) bounds are between 37.9 and 54.1.
Country: Georgia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.3 and 51.1. Uncertainty (95%) bounds are between 37.7 and 54.6.
Country: Georgia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 51.3. Uncertainty (95%) bounds are between 37.5 and 54.9.
Country: Georgia , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34 and 51.3. Uncertainty (95%) bounds are between 37.5 and 55.1.
Country: Georgia , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34 and 51.3. Uncertainty (95%) bounds are between 37.5 and 55.1.
Country: Georgia , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.1 and 51.4. Uncertainty (95%) bounds are between 37.6 and 55.1.
Country: Georgia , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 51.6. Uncertainty (95%) bounds are between 37.6 and 55.6.
Country: Georgia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.7 and 52.6. Uncertainty (95%) bounds are between 37.5 and 56.7.
Country: Georgia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.3 and 53.9. Uncertainty (95%) bounds are between 37.4 and 58.1.
Country: Georgia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.7 and 55.1. Uncertainty (95%) bounds are between 37.2 and 59.8.
Country: Georgia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.3 and 56.3. Uncertainty (95%) bounds are between 37.2 and 61.5.
Country: Germany , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.9 and 84.6. Uncertainty (95%) bounds are between 76.3 and 86.7.
Country: Germany , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.5 and 84.6. Uncertainty (95%) bounds are between 77.5 and 86.5.
Country: Germany , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.6 and 84.7. Uncertainty (95%) bounds are between 78.4 and 86.2.
Country: Germany , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76.3 and 84.8. Uncertainty (95%) bounds are between 78.3 and 86.4.
Country: Germany , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.6 and 85. Uncertainty (95%) bounds are between 77.7 and 86.6.
Country: Germany , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.5 and 85. Uncertainty (95%) bounds are between 77.1 and 86.8.
Country: Germany , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.5 and 84.9. Uncertainty (95%) bounds are between 76.3 and 86.8.
Country: Germany , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.7 and 84.7. Uncertainty (95%) bounds are between 75.6 and 86.7.
Country: Germany , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.8 and 84.5. Uncertainty (95%) bounds are between 74.9 and 86.5.
Country: Germany , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 84.2. Uncertainty (95%) bounds are between 74.3 and 86.3.
Country: Germany , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.5 and 83.8. Uncertainty (95%) bounds are between 73.8 and 86.
Country: Germany , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.1 and 83.4. Uncertainty (95%) bounds are between 73.3 and 85.6.
Country: Germany , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 82.8. Uncertainty (95%) bounds are between 72.9 and 85.
Country: Germany , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 82.2. Uncertainty (95%) bounds are between 72.5 and 84.3.
Country: Germany , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.2 and 81.6. Uncertainty (95%) bounds are between 72.2 and 83.6.
Country: Germany , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 80.8. Uncertainty (95%) bounds are between 71.8 and 82.9.
Country: Germany , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 80.2. Uncertainty (95%) bounds are between 71.1 and 82.3.
Country: Germany , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 79.5. Uncertainty (95%) bounds are between 70.3 and 81.6.
Country: Germany , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.7 and 78.8. Uncertainty (95%) bounds are between 69.5 and 81.
Country: Germany , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 78. Uncertainty (95%) bounds are between 68.8 and 80.3.
Country: Germany , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 77.3. Uncertainty (95%) bounds are between 68.1 and 79.5.
Country: Germany , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 76.8. Uncertainty (95%) bounds are between 67.5 and 79.
Country: Germany , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 76.5. Uncertainty (95%) bounds are between 66.8 and 78.8.
Country: Germany , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 76.5. Uncertainty (95%) bounds are between 65.9 and 78.9.
Country: Germany , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 76.6. Uncertainty (95%) bounds are between 65.1 and 79.1.
Country: Germany , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 76.6. Uncertainty (95%) bounds are between 64.3 and 79.2.
Country: Germany , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 76.7. Uncertainty (95%) bounds are between 63.7 and 79.3.
Country: Germany , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 76.7. Uncertainty (95%) bounds are between 63.3 and 79.3.
Country: Germany , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 76.4. Uncertainty (95%) bounds are between 62.8 and 79.3.
Country: Germany , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 76.2. Uncertainty (95%) bounds are between 62.6 and 79.2.
Country: Germany , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 76. Uncertainty (95%) bounds are between 62.4 and 78.9.
Country: Germany , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 75.6. Uncertainty (95%) bounds are between 62.3 and 78.6.
Country: Germany , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 75.3. Uncertainty (95%) bounds are between 62.4 and 78.2.
Country: Germany , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 74.9. Uncertainty (95%) bounds are between 62.6 and 77.7.
Country: Germany , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 74.6. Uncertainty (95%) bounds are between 63.1 and 77.2.
Country: Germany , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 74.4. Uncertainty (95%) bounds are between 63.6 and 76.8.
Country: Germany , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 74.6. Uncertainty (95%) bounds are between 64.4 and 77.
Country: Germany , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 75.1. Uncertainty (95%) bounds are between 65.4 and 77.4.
Country: Germany , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.1 and 75.8. Uncertainty (95%) bounds are between 66.8 and 77.9.
Country: Germany , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.5 and 76.9. Uncertainty (95%) bounds are between 68.9 and 78.8.
Country: Germany , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 78. Uncertainty (95%) bounds are between 71 and 79.6.
Country: Germany , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.1 and 78.8. Uncertainty (95%) bounds are between 72.3 and 80.2.
Country: Germany , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 78.8. Uncertainty (95%) bounds are between 71.9 and 80.4.
Country: Germany , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 78.4. Uncertainty (95%) bounds are between 70.7 and 80.2.
Country: Germany , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 77.6. Uncertainty (95%) bounds are between 69.3 and 79.5.
Country: Germany , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 76.5. Uncertainty (95%) bounds are between 67.7 and 78.6.
Country: Germany , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 75.2. Uncertainty (95%) bounds are between 66.2 and 77.3.
Country: Germany , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 73.9. Uncertainty (95%) bounds are between 64.8 and 76.1.
Country: Germany , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 73. Uncertainty (95%) bounds are between 63.6 and 75.2.
Country: Germany , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.1 and 73. Uncertainty (95%) bounds are between 62.3 and 75.4.
Country: Germany , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.4 and 73.5. Uncertainty (95%) bounds are between 61.2 and 76.2.
Country: Germany , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 74. Uncertainty (95%) bounds are between 60.2 and 77.1.
Country: Germany , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 74.6. Uncertainty (95%) bounds are between 59.4 and 78.
Country: Greece , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 85.4. Uncertainty (95%) bounds are between 59.8 and 89.4.
Country: Greece , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.8 and 85.2. Uncertainty (95%) bounds are between 60.4 and 89.1.
Country: Greece , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 84.9. Uncertainty (95%) bounds are between 61.2 and 88.8.
Country: Greece , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.6 and 84.5. Uncertainty (95%) bounds are between 61.8 and 88.3.
Country: Greece , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 84.2. Uncertainty (95%) bounds are between 62.5 and 88.
Country: Greece , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 83.9. Uncertainty (95%) bounds are between 63.1 and 87.7.
Country: Greece , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 83.6. Uncertainty (95%) bounds are between 63.8 and 87.2.
Country: Greece , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 83.3. Uncertainty (95%) bounds are between 64.5 and 86.7.
Country: Greece , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 82.9. Uncertainty (95%) bounds are between 65.2 and 86.3.
Country: Greece , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.4 and 82.5. Uncertainty (95%) bounds are between 65.9 and 85.8.
Country: Greece , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 82.1. Uncertainty (95%) bounds are between 66.7 and 85.2.
Country: Greece , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.8 and 81.7. Uncertainty (95%) bounds are between 67.4 and 84.6.
Country: Greece , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.8 and 81.2. Uncertainty (95%) bounds are between 68 and 84.
Country: Greece , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 80.8. Uncertainty (95%) bounds are between 68.4 and 83.5.
Country: Greece , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 80.5. Uncertainty (95%) bounds are between 68.2 and 83.2.
Country: Greece , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 80.1. Uncertainty (95%) bounds are between 68 and 82.9.
Country: Greece , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 79.9. Uncertainty (95%) bounds are between 67.7 and 82.6.
Country: Greece , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 79.6. Uncertainty (95%) bounds are between 67.4 and 82.3.
Country: Greece , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 79.1. Uncertainty (95%) bounds are between 67.1 and 82.
Country: Greece , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 78.7. Uncertainty (95%) bounds are between 66.9 and 81.6.
Country: Greece , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 78.5. Uncertainty (95%) bounds are between 66.7 and 81.3.
Country: Greece , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 78.5. Uncertainty (95%) bounds are between 66.4 and 81.2.
Country: Greece , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 78.5. Uncertainty (95%) bounds are between 66.1 and 81.3.
Country: Greece , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 78.5. Uncertainty (95%) bounds are between 65.9 and 81.4.
Country: Greece , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 78.5. Uncertainty (95%) bounds are between 65.7 and 81.5.
Country: Greece , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 78.6. Uncertainty (95%) bounds are between 65.7 and 81.5.
Country: Greece , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 78.6. Uncertainty (95%) bounds are between 65.7 and 81.5.
Country: Greece , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 78.6. Uncertainty (95%) bounds are between 65.9 and 81.4.
Country: Greece , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 78.5. Uncertainty (95%) bounds are between 66.1 and 81.2.
Country: Greece , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 78.5. Uncertainty (95%) bounds are between 66.5 and 81.1.
Country: Greece , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 78.7. Uncertainty (95%) bounds are between 67 and 81.2.
Country: Greece , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 79.1. Uncertainty (95%) bounds are between 67.3 and 81.5.
Country: Greece , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.2 and 79.6. Uncertainty (95%) bounds are between 67.1 and 82.2.
Country: Greece , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.4 and 80.1. Uncertainty (95%) bounds are between 66.7 and 82.9.
Country: Greece , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.5 and 80.7. Uncertainty (95%) bounds are between 66.1 and 83.6.
Country: Greece , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 81.2. Uncertainty (95%) bounds are between 65.4 and 84.1.
Country: Greece , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.6 and 81.7. Uncertainty (95%) bounds are between 64.9 and 84.9.
Country: Greece , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 82.2. Uncertainty (95%) bounds are between 64.4 and 85.5.
Country: Greece , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.6 and 82.5. Uncertainty (95%) bounds are between 63.8 and 86.1.
Country: Greece , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 83. Uncertainty (95%) bounds are between 63.2 and 86.6.
Country: Greece , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 83.3. Uncertainty (95%) bounds are between 62.8 and 87.2.
Country: Greece , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 83.7. Uncertainty (95%) bounds are between 62.3 and 87.6.
Country: Greece , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.5 and 84. Uncertainty (95%) bounds are between 61.7 and 88.
Country: Greece , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 84.4. Uncertainty (95%) bounds are between 61.3 and 88.3.
Country: Greece , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 84.7. Uncertainty (95%) bounds are between 60.9 and 88.6.
Country: Greece , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 84.9. Uncertainty (95%) bounds are between 60.5 and 89.
Country: Greece , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.7 and 85.1. Uncertainty (95%) bounds are between 60.2 and 89.3.
Country: Greece , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 85.3. Uncertainty (95%) bounds are between 59.9 and 89.5.
Country: Greece , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 85.5. Uncertainty (95%) bounds are between 59.4 and 89.8.
Country: Greece , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.9 and 85.8. Uncertainty (95%) bounds are between 59.1 and 90.
Country: Greece , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.4 and 86. Uncertainty (95%) bounds are between 58.7 and 90.2.
Country: Greece , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 86.2. Uncertainty (95%) bounds are between 58.3 and 90.5.
Country: Greece , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.2 and 86.5. Uncertainty (95%) bounds are between 58.1 and 90.8.
Country: Hungary , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 73.5. Uncertainty (95%) bounds are between 63.5 and 75.8.
Country: Hungary , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 74.8. Uncertainty (95%) bounds are between 65.2 and 76.9.
Country: Hungary , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 75.9. Uncertainty (95%) bounds are between 67 and 77.9.
Country: Hungary , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 76.8. Uncertainty (95%) bounds are between 68.3 and 78.8.
Country: Hungary , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 77.6. Uncertainty (95%) bounds are between 69.3 and 79.6.
Country: Hungary , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 78.5. Uncertainty (95%) bounds are between 70.1 and 80.3.
Country: Hungary , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.4 and 78.9. Uncertainty (95%) bounds are between 70 and 80.9.
Country: Hungary , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 79.2. Uncertainty (95%) bounds are between 69.7 and 81.3.
Country: Hungary , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 79.5. Uncertainty (95%) bounds are between 69.2 and 81.8.
Country: Hungary , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 79.6. Uncertainty (95%) bounds are between 68.8 and 81.9.
Country: Hungary , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 79.7. Uncertainty (95%) bounds are between 68.4 and 82.2.
Country: Hungary , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 79.6. Uncertainty (95%) bounds are between 68.3 and 82.1.
Country: Hungary , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 79.5. Uncertainty (95%) bounds are between 68.2 and 81.9.
Country: Hungary , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 79.2. Uncertainty (95%) bounds are between 68.4 and 81.6.
Country: Hungary , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 78.8. Uncertainty (95%) bounds are between 68.5 and 81.1.
Country: Hungary , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 78.4. Uncertainty (95%) bounds are between 68.8 and 80.6.
Country: Hungary , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 78.1. Uncertainty (95%) bounds are between 69.1 and 80.2.
Country: Hungary , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.5 and 78.1. Uncertainty (95%) bounds are between 69.2 and 80.2.
Country: Hungary , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 78.3. Uncertainty (95%) bounds are between 69.4 and 80.4.
Country: Hungary , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 78.5. Uncertainty (95%) bounds are between 69.5 and 80.6.
Country: Hungary , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 78.8. Uncertainty (95%) bounds are between 69.7 and 81.
Country: Hungary , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 79.3. Uncertainty (95%) bounds are between 69.9 and 81.5.
Country: Hungary , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 79.8. Uncertainty (95%) bounds are between 69.9 and 82.
Country: Hungary , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.5 and 80.3. Uncertainty (95%) bounds are between 69.9 and 82.5.
Country: Hungary , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 80.6. Uncertainty (95%) bounds are between 69.3 and 82.9.
Country: Hungary , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 80.8. Uncertainty (95%) bounds are between 68.5 and 83.3.
Country: Hungary , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 80.9. Uncertainty (95%) bounds are between 67.7 and 83.5.
Country: Hungary , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 80.8. Uncertainty (95%) bounds are between 66.8 and 83.7.
Country: Hungary , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 80.8. Uncertainty (95%) bounds are between 65.9 and 83.7.
Country: Hungary , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 80.6. Uncertainty (95%) bounds are between 65.1 and 83.7.
Country: Hungary , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 80.3. Uncertainty (95%) bounds are between 64.3 and 83.6.
Country: Hungary , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 80.1. Uncertainty (95%) bounds are between 63.6 and 83.4.
Country: Hungary , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 79.8. Uncertainty (95%) bounds are between 62.9 and 83.2.
Country: Hungary , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 79.5. Uncertainty (95%) bounds are between 62.3 and 83.1.
Country: Hungary , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 79.2. Uncertainty (95%) bounds are between 61.8 and 82.8.
Country: Hungary , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.7 and 78.7. Uncertainty (95%) bounds are between 61.3 and 82.7.
Country: Hungary , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 78.4. Uncertainty (95%) bounds are between 60.9 and 82.3.
Country: Hungary , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 78.1. Uncertainty (95%) bounds are between 60.5 and 82.1.
Country: Hungary , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 78. Uncertainty (95%) bounds are between 60.1 and 82.2.
Country: Hungary , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 78. Uncertainty (95%) bounds are between 59.5 and 82.4.
Country: Hungary , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.2 and 78.2. Uncertainty (95%) bounds are between 58.9 and 82.6.
Country: Hungary , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.4 and 78.6. Uncertainty (95%) bounds are between 58.4 and 83.1.
Country: Hungary , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 79.1. Uncertainty (95%) bounds are between 57.9 and 83.7.
Country: Hungary , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 79.6. Uncertainty (95%) bounds are between 57.5 and 84.1.
Country: Hungary , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 80. Uncertainty (95%) bounds are between 57 and 84.6.
Country: Hungary , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 80.3. Uncertainty (95%) bounds are between 56.6 and 85.1.
Country: Hungary , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 80.6. Uncertainty (95%) bounds are between 56.1 and 85.6.
Country: Hungary , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.2 and 81. Uncertainty (95%) bounds are between 55.9 and 85.8.
Country: Hungary , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 81.4. Uncertainty (95%) bounds are between 55.4 and 86.2.
Country: Hungary , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 47 and 81.7. Uncertainty (95%) bounds are between 55.1 and 86.5.
Country: Hungary , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 82.1. Uncertainty (95%) bounds are between 54.8 and 86.9.
Country: Hungary , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.1 and 82.4. Uncertainty (95%) bounds are between 54.5 and 87.3.
Country: Hungary , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.2 and 82.6. Uncertainty (95%) bounds are between 54.2 and 87.6.
Country: Ireland , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.8 and 85.1. Uncertainty (95%) bounds are between 48.8 and 90.1.
Country: Ireland , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 84.9. Uncertainty (95%) bounds are between 49.6 and 89.8.
Country: Ireland , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.3 and 84.7. Uncertainty (95%) bounds are between 50.3 and 89.5.
Country: Ireland , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.5 and 84.4. Uncertainty (95%) bounds are between 51 and 89.3.
Country: Ireland , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.8 and 84.1. Uncertainty (95%) bounds are between 52 and 88.9.
Country: Ireland , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 41 and 83.9. Uncertainty (95%) bounds are between 52.8 and 88.6.
Country: Ireland , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.3 and 83.7. Uncertainty (95%) bounds are between 53.7 and 88.2.
Country: Ireland , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.6 and 83.4. Uncertainty (95%) bounds are between 54.5 and 87.9.
Country: Ireland , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 83.1. Uncertainty (95%) bounds are between 55.3 and 87.4.
Country: Ireland , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.3 and 82.7. Uncertainty (95%) bounds are between 56 and 87.1.
Country: Ireland , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.6 and 82.5. Uncertainty (95%) bounds are between 56.8 and 86.6.
Country: Ireland , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.9 and 82.1. Uncertainty (95%) bounds are between 57.6 and 86.2.
Country: Ireland , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 81.7. Uncertainty (95%) bounds are between 58.5 and 85.7.
Country: Ireland , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 81.4. Uncertainty (95%) bounds are between 59.4 and 85.3.
Country: Ireland , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 81.1. Uncertainty (95%) bounds are between 60.2 and 84.9.
Country: Ireland , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.3 and 80.7. Uncertainty (95%) bounds are between 61.2 and 84.4.
Country: Ireland , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 80.2. Uncertainty (95%) bounds are between 62.1 and 83.8.
Country: Ireland , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 79.8. Uncertainty (95%) bounds are between 62.9 and 83.2.
Country: Ireland , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 79.3. Uncertainty (95%) bounds are between 63.7 and 82.7.
Country: Ireland , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.1 and 79. Uncertainty (95%) bounds are between 64.7 and 82.1.
Country: Ireland , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.2 and 78.7. Uncertainty (95%) bounds are between 65.4 and 81.5.
Country: Ireland , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.7 and 78.7. Uncertainty (95%) bounds are between 66 and 81.5.
Country: Ireland , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.2 and 78.8. Uncertainty (95%) bounds are between 66.5 and 81.5.
Country: Ireland , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.7 and 78.9. Uncertainty (95%) bounds are between 66.9 and 81.4.
Country: Ireland , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.2 and 78.9. Uncertainty (95%) bounds are between 67.5 and 81.3.
Country: Ireland , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.7 and 78.9. Uncertainty (95%) bounds are between 68 and 81.1.
Country: Ireland , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.3 and 78.8. Uncertainty (95%) bounds are between 68.5 and 80.8.
Country: Ireland , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.5 and 78.6. Uncertainty (95%) bounds are between 69 and 80.3.
Country: Ireland , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 78.3. Uncertainty (95%) bounds are between 69.2 and 80.
Country: Ireland , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 77.9. Uncertainty (95%) bounds are between 68.9 and 79.5.
Country: Ireland , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 77.4. Uncertainty (95%) bounds are between 68.3 and 79.1.
Country: Ireland , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.8 and 76.7. Uncertainty (95%) bounds are between 67.9 and 78.1.
Country: Ireland , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 75.7. Uncertainty (95%) bounds are between 67.3 and 77.
Country: Ireland , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 74.7. Uncertainty (95%) bounds are between 66.5 and 76.1.
Country: Ireland , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 73.9. Uncertainty (95%) bounds are between 65.4 and 75.4.
Country: Ireland , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 73.9. Uncertainty (95%) bounds are between 64.4 and 75.5.
Country: Ireland , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 73.9. Uncertainty (95%) bounds are between 63.6 and 75.9.
Country: Ireland , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 74. Uncertainty (95%) bounds are between 63.1 and 76.1.
Country: Ireland , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 74.1. Uncertainty (95%) bounds are between 62.8 and 76.1.
Country: Ireland , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 74. Uncertainty (95%) bounds are between 62.6 and 76.
Country: Ireland , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 74.1. Uncertainty (95%) bounds are between 62.3 and 75.9.
Country: Ireland , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.5 and 74.6. Uncertainty (95%) bounds are between 61.8 and 76.8.
Country: Ireland , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.7 and 75.3. Uncertainty (95%) bounds are between 61.3 and 77.9.
Country: Ireland , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 76. Uncertainty (95%) bounds are between 60.6 and 78.8.
Country: Ireland , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 76.7. Uncertainty (95%) bounds are between 59.9 and 79.8.
Country: Ireland , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 77.4. Uncertainty (95%) bounds are between 59.3 and 80.7.
Country: Ireland , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.8 and 78. Uncertainty (95%) bounds are between 58.8 and 81.4.
Country: Ireland , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 78.5. Uncertainty (95%) bounds are between 58.2 and 82.2.
Country: Ireland , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 79. Uncertainty (95%) bounds are between 57.7 and 82.8.
Country: Ireland , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 79.4. Uncertainty (95%) bounds are between 57.2 and 83.4.
Country: Ireland , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 79.9. Uncertainty (95%) bounds are between 56.8 and 84.
Country: Ireland , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 80.3. Uncertainty (95%) bounds are between 56.5 and 84.4.
Country: Ireland , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 80.7. Uncertainty (95%) bounds are between 56.1 and 84.8.
Country: Israel , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 26.1 and 79.5. Uncertainty (95%) bounds are between 37.6 and 85.2.
Country: Israel , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.7 and 79.2. Uncertainty (95%) bounds are between 39.1 and 84.9.
Country: Israel , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.6 and 79. Uncertainty (95%) bounds are between 40.4 and 84.6.
Country: Israel , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.2 and 78.6. Uncertainty (95%) bounds are between 42 and 84.1.
Country: Israel , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 78.2. Uncertainty (95%) bounds are between 43.3 and 83.8.
Country: Israel , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 77.9. Uncertainty (95%) bounds are between 44.9 and 83.2.
Country: Israel , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 77.5. Uncertainty (95%) bounds are between 46.5 and 82.7.
Country: Israel , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.6 and 77.1. Uncertainty (95%) bounds are between 47.9 and 82.3.
Country: Israel , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.6 and 76.8. Uncertainty (95%) bounds are between 49.5 and 81.6.
Country: Israel , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.9 and 76.3. Uncertainty (95%) bounds are between 51 and 80.9.
Country: Israel , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 75.9. Uncertainty (95%) bounds are between 52.4 and 80.3.
Country: Israel , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.8 and 75.5. Uncertainty (95%) bounds are between 53.9 and 79.5.
Country: Israel , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 74.9. Uncertainty (95%) bounds are between 55.4 and 78.6.
Country: Israel , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 74.3. Uncertainty (95%) bounds are between 57 and 77.8.
Country: Israel , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.1 and 73.7. Uncertainty (95%) bounds are between 58.5 and 77.
Country: Israel , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.5 and 73.1. Uncertainty (95%) bounds are between 60 and 76.
Country: Israel , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.6 and 72.4. Uncertainty (95%) bounds are between 61.4 and 75.
Country: Israel , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 72.1. Uncertainty (95%) bounds are between 62.5 and 74.3.
Country: Israel , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 72.4. Uncertainty (95%) bounds are between 62.9 and 74.8.
Country: Israel , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 73.1. Uncertainty (95%) bounds are between 63.1 and 75.4.
Country: Israel , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 73.8. Uncertainty (95%) bounds are between 63 and 76.3.
Country: Israel , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.8 and 74.6. Uncertainty (95%) bounds are between 62.6 and 77.4.
Country: Israel , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.9 and 75.5. Uncertainty (95%) bounds are between 62 and 78.6.
Country: Israel , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 76.2. Uncertainty (95%) bounds are between 61.5 and 79.6.
Country: Israel , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 77. Uncertainty (95%) bounds are between 61 and 80.5.
Country: Israel , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.1 and 77.7. Uncertainty (95%) bounds are between 60.5 and 81.3.
Country: Israel , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.3 and 78.3. Uncertainty (95%) bounds are between 60 and 82.
Country: Israel , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 78.9. Uncertainty (95%) bounds are between 59.6 and 82.8.
Country: Israel , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.1 and 79.5. Uncertainty (95%) bounds are between 59.3 and 83.5.
Country: Israel , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 80. Uncertainty (95%) bounds are between 58.8 and 84.1.
Country: Israel , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.9 and 80.5. Uncertainty (95%) bounds are between 58.5 and 84.8.
Country: Israel , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 81. Uncertainty (95%) bounds are between 58.2 and 85.2.
Country: Israel , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 81.5. Uncertainty (95%) bounds are between 57.9 and 85.6.
Country: Israel , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 81.8. Uncertainty (95%) bounds are between 57.7 and 86.
Country: Israel , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 82.2. Uncertainty (95%) bounds are between 57.4 and 86.5.
Country: Israel , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 82.5. Uncertainty (95%) bounds are between 57.3 and 86.9.
Country: Israel , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 82.8. Uncertainty (95%) bounds are between 57.1 and 87.4.
Country: Israel , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 83.1. Uncertainty (95%) bounds are between 56.9 and 87.6.
Country: Israel , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.5 and 83.4. Uncertainty (95%) bounds are between 56.8 and 88.
Country: Israel , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.4 and 83.7. Uncertainty (95%) bounds are between 56.6 and 88.3.
Country: Israel , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 83.9. Uncertainty (95%) bounds are between 56.4 and 88.6.
Country: Israel , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.8 and 84.2. Uncertainty (95%) bounds are between 56.3 and 89.
Country: Israel , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 84.5. Uncertainty (95%) bounds are between 56.3 and 89.2.
Country: Israel , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 84.8. Uncertainty (95%) bounds are between 56.2 and 89.5.
Country: Israel , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.8 and 85.1. Uncertainty (95%) bounds are between 56 and 89.8.
Country: Israel , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 85.3. Uncertainty (95%) bounds are between 55.9 and 90.
Country: Israel , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 85.5. Uncertainty (95%) bounds are between 55.8 and 90.2.
Country: Israel , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 85.7. Uncertainty (95%) bounds are between 55.8 and 90.4.
Country: Israel , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 85.9. Uncertainty (95%) bounds are between 55.6 and 90.6.
Country: Israel , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 86.1. Uncertainty (95%) bounds are between 55.6 and 90.8.
Country: Israel , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.3 and 86.3. Uncertainty (95%) bounds are between 55.5 and 91.
Country: Israel , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.2 and 86.5. Uncertainty (95%) bounds are between 55.5 and 91.1.
Country: Israel , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 46 and 86.7. Uncertainty (95%) bounds are between 55.4 and 91.3.
Country: Italy , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 82.7. Uncertainty (95%) bounds are between 44.8 and 88.1.
Country: Italy , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 82.4. Uncertainty (95%) bounds are between 45.6 and 87.7.
Country: Italy , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.2 and 82.1. Uncertainty (95%) bounds are between 46.4 and 87.6.
Country: Italy , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 81.9. Uncertainty (95%) bounds are between 47 and 87.3.
Country: Italy , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 81.6. Uncertainty (95%) bounds are between 47.8 and 86.8.
Country: Italy , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.2 and 81.4. Uncertainty (95%) bounds are between 48.5 and 86.5.
Country: Italy , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 81.1. Uncertainty (95%) bounds are between 49.2 and 86.2.
Country: Italy , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.7 and 80.8. Uncertainty (95%) bounds are between 50.1 and 85.8.
Country: Italy , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 80.5. Uncertainty (95%) bounds are between 50.9 and 85.4.
Country: Italy , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 80.2. Uncertainty (95%) bounds are between 51.6 and 84.9.
Country: Italy , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 79.8. Uncertainty (95%) bounds are between 52.3 and 84.5.
Country: Italy , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 79.5. Uncertainty (95%) bounds are between 53.1 and 84.
Country: Italy , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 79.1. Uncertainty (95%) bounds are between 53.9 and 83.6.
Country: Italy , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 78.6. Uncertainty (95%) bounds are between 54.7 and 83.1.
Country: Italy , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 78.2. Uncertainty (95%) bounds are between 55.5 and 82.5.
Country: Italy , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.3 and 77.7. Uncertainty (95%) bounds are between 56.3 and 81.9.
Country: Italy , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.5 and 77.1. Uncertainty (95%) bounds are between 57.1 and 81.3.
Country: Italy , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 76.6. Uncertainty (95%) bounds are between 57.9 and 80.4.
Country: Italy , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 76.1. Uncertainty (95%) bounds are between 58.9 and 79.7.
Country: Italy , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 75.5. Uncertainty (95%) bounds are between 59.5 and 79.
Country: Italy , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 75. Uncertainty (95%) bounds are between 60 and 78.2.
Country: Italy , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 74.7. Uncertainty (95%) bounds are between 60.1 and 77.8.
Country: Italy , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 74.5. Uncertainty (95%) bounds are between 60 and 77.5.
Country: Italy , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 74.2. Uncertainty (95%) bounds are between 59.7 and 77.3.
Country: Italy , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 74. Uncertainty (95%) bounds are between 59.5 and 77.2.
Country: Italy , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 73.8. Uncertainty (95%) bounds are between 59.2 and 77.1.
Country: Italy , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 73.8. Uncertainty (95%) bounds are between 58.8 and 77.2.
Country: Italy , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 74.1. Uncertainty (95%) bounds are between 58.3 and 77.4.
Country: Italy , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 74.2. Uncertainty (95%) bounds are between 58 and 77.8.
Country: Italy , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 74.4. Uncertainty (95%) bounds are between 57.6 and 78.1.
Country: Italy , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 74.5. Uncertainty (95%) bounds are between 57.5 and 78.2.
Country: Italy , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 74.6. Uncertainty (95%) bounds are between 57.2 and 78.4.
Country: Italy , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 74.7. Uncertainty (95%) bounds are between 57 and 78.5.
Country: Italy , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 74.8. Uncertainty (95%) bounds are between 56.9 and 78.5.
Country: Italy , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.4 and 74.8. Uncertainty (95%) bounds are between 56.9 and 78.5.
Country: Italy , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.4 and 74.8. Uncertainty (95%) bounds are between 56.9 and 78.4.
Country: Italy , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 74.6. Uncertainty (95%) bounds are between 57 and 78.3.
Country: Italy , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 74.4. Uncertainty (95%) bounds are between 57.2 and 78.3.
Country: Italy , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 74.1. Uncertainty (95%) bounds are between 57.4 and 77.9.
Country: Italy , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 73.9. Uncertainty (95%) bounds are between 57.7 and 77.6.
Country: Italy , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 73.5. Uncertainty (95%) bounds are between 58.1 and 77.3.
Country: Italy , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 73.2. Uncertainty (95%) bounds are between 58.5 and 76.8.
Country: Italy , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 73. Uncertainty (95%) bounds are between 58.8 and 76.4.
Country: Italy , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 72.9. Uncertainty (95%) bounds are between 59 and 76.2.
Country: Italy , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 73.2. Uncertainty (95%) bounds are between 58.8 and 76.7.
Country: Italy , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 73.7. Uncertainty (95%) bounds are between 58.2 and 77.4.
Country: Italy , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.1 and 74.3. Uncertainty (95%) bounds are between 57.5 and 78.2.
Country: Italy , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 74.9. Uncertainty (95%) bounds are between 56.9 and 79.
Country: Italy , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 75.5. Uncertainty (95%) bounds are between 56.2 and 79.7.
Country: Italy , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 76.1. Uncertainty (95%) bounds are between 55.7 and 80.5.
Country: Italy , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 76.6. Uncertainty (95%) bounds are between 55.2 and 81.1.
Country: Italy , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 77. Uncertainty (95%) bounds are between 54.7 and 81.7.
Country: Italy , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 77.5. Uncertainty (95%) bounds are between 54.3 and 82.2.
Country: Japan , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.2 and 57.6. Uncertainty (95%) bounds are between 51 and 59.2.
Country: Japan , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.2 and 58.4. Uncertainty (95%) bounds are between 52 and 60.
Country: Japan , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 59.6. Uncertainty (95%) bounds are between 53.3 and 61.3.
Country: Japan , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 60.9. Uncertainty (95%) bounds are between 54.7 and 62.4.
Country: Japan , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 61.9. Uncertainty (95%) bounds are between 55.7 and 63.5.
Country: Japan , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 62.6. Uncertainty (95%) bounds are between 56.6 and 64.2.
Country: Japan , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 63.3. Uncertainty (95%) bounds are between 57.1 and 64.8.
Country: Japan , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 63.6. Uncertainty (95%) bounds are between 57.5 and 65.3.
Country: Japan , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 64. Uncertainty (95%) bounds are between 57.7 and 65.8.
Country: Japan , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 64.4. Uncertainty (95%) bounds are between 57.7 and 66.2.
Country: Japan , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 64.7. Uncertainty (95%) bounds are between 57.3 and 66.6.
Country: Japan , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 64.7. Uncertainty (95%) bounds are between 56.8 and 66.8.
Country: Japan , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 64.5. Uncertainty (95%) bounds are between 56.6 and 66.6.
Country: Japan , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 64. Uncertainty (95%) bounds are between 56.6 and 66.
Country: Japan , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 63.6. Uncertainty (95%) bounds are between 56.9 and 65.4.
Country: Japan , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 63.6. Uncertainty (95%) bounds are between 57.4 and 65.3.
Country: Japan , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 63.6. Uncertainty (95%) bounds are between 57.9 and 65.1.
Country: Japan , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 63.5. Uncertainty (95%) bounds are between 58.1 and 64.8.
Country: Japan , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 63.2. Uncertainty (95%) bounds are between 57.7 and 64.6.
Country: Japan , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 63.5. Uncertainty (95%) bounds are between 57.6 and 64.9.
Country: Japan , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 63.7. Uncertainty (95%) bounds are between 57.9 and 65.
Country: Japan , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 63.9. Uncertainty (95%) bounds are between 57.9 and 65.4.
Country: Japan , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 63.8. Uncertainty (95%) bounds are between 57.8 and 65.4.
Country: Japan , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 63.3. Uncertainty (95%) bounds are between 57 and 64.9.
Country: Japan , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 62.4. Uncertainty (95%) bounds are between 56.2 and 64.
Country: Japan , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 61.5. Uncertainty (95%) bounds are between 55.4 and 63.2.
Country: Japan , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 60.6. Uncertainty (95%) bounds are between 54.9 and 62.2.
Country: Japan , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 59.9. Uncertainty (95%) bounds are between 54.3 and 61.4.
Country: Japan , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 59.4. Uncertainty (95%) bounds are between 53.5 and 61.
Country: Japan , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 59.3. Uncertainty (95%) bounds are between 52.8 and 60.9.
Country: Japan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.6 and 59.2. Uncertainty (95%) bounds are between 52.4 and 61.
Country: Japan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 59.2. Uncertainty (95%) bounds are between 51.9 and 61.2.
Country: Japan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 59.2. Uncertainty (95%) bounds are between 51.7 and 61.2.
Country: Japan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 59. Uncertainty (95%) bounds are between 51.9 and 60.9.
Country: Japan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 58.8. Uncertainty (95%) bounds are between 52.2 and 60.6.
Country: Japan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.5 and 59.2. Uncertainty (95%) bounds are between 52.5 and 61.
Country: Japan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 59.7. Uncertainty (95%) bounds are between 51.6 and 61.7.
Country: Japan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48 and 59.8. Uncertainty (95%) bounds are between 50.5 and 62.3.
Country: Japan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 59.8. Uncertainty (95%) bounds are between 49.5 and 62.5.
Country: Japan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.6 and 59.4. Uncertainty (95%) bounds are between 48.6 and 62.2.
Country: Japan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.9 and 58.7. Uncertainty (95%) bounds are between 47.8 and 61.6.
Country: Japan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 57.7. Uncertainty (95%) bounds are between 47.1 and 60.6.
Country: Japan , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44 and 56.4. Uncertainty (95%) bounds are between 46.6 and 59.
Country: Japan , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 54.8. Uncertainty (95%) bounds are between 46.1 and 57.2.
Country: Japan , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 52.9. Uncertainty (95%) bounds are between 45.3 and 54.9.
Country: Japan , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.2 and 51.2. Uncertainty (95%) bounds are between 43.4 and 53.3.
Country: Japan , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.8 and 51.6. Uncertainty (95%) bounds are between 42.3 and 54.2.
Country: Japan , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.7 and 52.8. Uncertainty (95%) bounds are between 41.8 and 55.8.
Country: Japan , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.1 and 54.2. Uncertainty (95%) bounds are between 41.6 and 57.4.
Country: Japan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.9 and 55.6. Uncertainty (95%) bounds are between 41.6 and 59.1.
Country: Japan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 56.9. Uncertainty (95%) bounds are between 41.8 and 60.7.
Country: Japan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.6 and 58.2. Uncertainty (95%) bounds are between 42.2 and 62.4.
Country: Japan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.8 and 59.4. Uncertainty (95%) bounds are between 42.5 and 63.7.
Country: Kyrgyzstan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.9 and 73.2. Uncertainty (95%) bounds are between 22.3 and 81.5.
Country: Kyrgyzstan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 73.1. Uncertainty (95%) bounds are between 23.3 and 81.1.
Country: Kyrgyzstan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.5 and 72.8. Uncertainty (95%) bounds are between 24.3 and 80.6.
Country: Kyrgyzstan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.5 and 72.4. Uncertainty (95%) bounds are between 25.4 and 80.2.
Country: Kyrgyzstan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.5 and 72.1. Uncertainty (95%) bounds are between 26.2 and 79.9.
Country: Kyrgyzstan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.6 and 71.8. Uncertainty (95%) bounds are between 27.2 and 79.5.
Country: Kyrgyzstan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.8 and 71.5. Uncertainty (95%) bounds are between 28.3 and 79.1.
Country: Kyrgyzstan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 20 and 71.1. Uncertainty (95%) bounds are between 29.3 and 78.7.
Country: Kyrgyzstan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 70.9. Uncertainty (95%) bounds are between 30.4 and 78.
Country: Kyrgyzstan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.4 and 70.6. Uncertainty (95%) bounds are between 31.5 and 77.5.
Country: Kyrgyzstan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.7 and 70.1. Uncertainty (95%) bounds are between 32.6 and 77.2.
Country: Kyrgyzstan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.8 and 69.7. Uncertainty (95%) bounds are between 33.8 and 76.7.
Country: Kyrgyzstan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 26.4 and 69.3. Uncertainty (95%) bounds are between 34.9 and 76.
Country: Kyrgyzstan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.8 and 69. Uncertainty (95%) bounds are between 36.1 and 75.5.
Country: Kyrgyzstan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.3 and 68.6. Uncertainty (95%) bounds are between 37.3 and 74.9.
Country: Kyrgyzstan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.7 and 68.2. Uncertainty (95%) bounds are between 38.4 and 74.3.
Country: Kyrgyzstan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.5 and 67.7. Uncertainty (95%) bounds are between 39.6 and 73.5.
Country: Kyrgyzstan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.2 and 67.2. Uncertainty (95%) bounds are between 40.9 and 72.7.
Country: Kyrgyzstan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 66.6. Uncertainty (95%) bounds are between 42.2 and 71.9.
Country: Kyrgyzstan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 66.1. Uncertainty (95%) bounds are between 43.6 and 71.2.
Country: Kyrgyzstan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 65.6. Uncertainty (95%) bounds are between 44.9 and 70.3.
Country: Kyrgyzstan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 65.1. Uncertainty (95%) bounds are between 46.4 and 69.4.
Country: Kyrgyzstan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 64.6. Uncertainty (95%) bounds are between 47.9 and 68.6.
Country: Kyrgyzstan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 64. Uncertainty (95%) bounds are between 49.3 and 67.5.
Country: Kyrgyzstan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 63.4. Uncertainty (95%) bounds are between 50.8 and 66.4.
Country: Kyrgyzstan , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.5 and 62.5. Uncertainty (95%) bounds are between 52.3 and 65.
Country: Kyrgyzstan , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 61.5. Uncertainty (95%) bounds are between 53.7 and 63.5.
Country: Kyrgyzstan , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 60.5. Uncertainty (95%) bounds are between 54.3 and 62.2.
Country: Kyrgyzstan , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 60.3. Uncertainty (95%) bounds are between 53.1 and 62.1.
Country: Kyrgyzstan , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.7 and 60. Uncertainty (95%) bounds are between 51.2 and 62.2.
Country: Kyrgyzstan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 59.6. Uncertainty (95%) bounds are between 49.3 and 62.
Country: Kyrgyzstan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.5 and 58.7. Uncertainty (95%) bounds are between 47.5 and 61.4.
Country: Kyrgyzstan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 57.5. Uncertainty (95%) bounds are between 45.8 and 60.6.
Country: Kyrgyzstan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.2 and 56.2. Uncertainty (95%) bounds are between 44.3 and 59.4.
Country: Kyrgyzstan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.1 and 54.7. Uncertainty (95%) bounds are between 43 and 57.7.
Country: Kyrgyzstan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 52.9. Uncertainty (95%) bounds are between 41.7 and 55.8.
Country: Kyrgyzstan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.8 and 51.2. Uncertainty (95%) bounds are between 40.4 and 54.
Country: Kyrgyzstan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 49.4. Uncertainty (95%) bounds are between 39 and 52.3.
Country: Kyrgyzstan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.1 and 47.5. Uncertainty (95%) bounds are between 37.6 and 50.2.
Country: Kyrgyzstan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.1 and 45.4. Uncertainty (95%) bounds are between 36.4 and 48.
Country: Kyrgyzstan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.7 and 43.2. Uncertainty (95%) bounds are between 35.6 and 45.5.
Country: Kyrgyzstan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.8 and 41.1. Uncertainty (95%) bounds are between 35.3 and 42.9.
Country: Kyrgyzstan , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.1 and 39.6. Uncertainty (95%) bounds are between 35.2 and 41.1.
Country: Kyrgyzstan , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 40.2. Uncertainty (95%) bounds are between 34.7 and 41.8.
Country: Kyrgyzstan , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.6 and 41.3. Uncertainty (95%) bounds are between 34.4 and 43.4.
Country: Kyrgyzstan , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32 and 42.5. Uncertainty (95%) bounds are between 34.1 and 44.8.
Country: Kyrgyzstan , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.5 and 43.5. Uncertainty (95%) bounds are between 33.9 and 46.2.
Country: Kyrgyzstan , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.4 and 44.5. Uncertainty (95%) bounds are between 33.9 and 47.4.
Country: Kyrgyzstan , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 45.5. Uncertainty (95%) bounds are between 33.8 and 48.7.
Country: Kyrgyzstan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 46.9. Uncertainty (95%) bounds are between 33.6 and 50.6.
Country: Kyrgyzstan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.7 and 48.3. Uncertainty (95%) bounds are between 33.2 and 52.5.
Country: Kyrgyzstan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.1 and 49.7. Uncertainty (95%) bounds are between 33 and 54.4.
Country: Kyrgyzstan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.4 and 51.1. Uncertainty (95%) bounds are between 32.8 and 56.
Country: Latvia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.2 and 83.8. Uncertainty (95%) bounds are between 45.6 and 89.
Country: Latvia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.4 and 83.5. Uncertainty (95%) bounds are between 46.4 and 88.8.
Country: Latvia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.6 and 83.3. Uncertainty (95%) bounds are between 47.2 and 88.4.
Country: Latvia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.9 and 83.2. Uncertainty (95%) bounds are between 48.2 and 88.2.
Country: Latvia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 83. Uncertainty (95%) bounds are between 49 and 87.8.
Country: Latvia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 82.7. Uncertainty (95%) bounds are between 49.8 and 87.5.
Country: Latvia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 82.4. Uncertainty (95%) bounds are between 50.7 and 87.2.
Country: Latvia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 40 and 82. Uncertainty (95%) bounds are between 51.4 and 86.9.
Country: Latvia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.5 and 81.7. Uncertainty (95%) bounds are between 52.3 and 86.4.
Country: Latvia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.7 and 81.5. Uncertainty (95%) bounds are between 53.1 and 86.1.
Country: Latvia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 81.2. Uncertainty (95%) bounds are between 53.9 and 85.7.
Country: Latvia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 80.8. Uncertainty (95%) bounds are between 54.9 and 85.2.
Country: Latvia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 80.4. Uncertainty (95%) bounds are between 55.7 and 84.9.
Country: Latvia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 80.1. Uncertainty (95%) bounds are between 56.7 and 84.4.
Country: Latvia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 79.6. Uncertainty (95%) bounds are between 57.5 and 83.9.
Country: Latvia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 79.3. Uncertainty (95%) bounds are between 58.3 and 83.3.
Country: Latvia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 78.9. Uncertainty (95%) bounds are between 59.4 and 82.7.
Country: Latvia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.2 and 78.3. Uncertainty (95%) bounds are between 60.2 and 82.1.
Country: Latvia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 77.9. Uncertainty (95%) bounds are between 61.1 and 81.5.
Country: Latvia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 77.4. Uncertainty (95%) bounds are between 61.8 and 81.
Country: Latvia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.8 and 77. Uncertainty (95%) bounds are between 62.4 and 80.6.
Country: Latvia , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 76.9. Uncertainty (95%) bounds are between 62.6 and 80.6.
Country: Latvia , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 77.1. Uncertainty (95%) bounds are between 62.7 and 80.6.
Country: Latvia , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 77.2. Uncertainty (95%) bounds are between 62.6 and 80.7.
Country: Latvia , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 77.4. Uncertainty (95%) bounds are between 62.7 and 80.8.
Country: Latvia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 77.7. Uncertainty (95%) bounds are between 62.4 and 81.1.
Country: Latvia , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 78.1. Uncertainty (95%) bounds are between 61.9 and 81.6.
Country: Latvia , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.4 and 78.6. Uncertainty (95%) bounds are between 61.4 and 82.2.
Country: Latvia , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.3 and 79.1. Uncertainty (95%) bounds are between 60.9 and 82.9.
Country: Latvia , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 79.6. Uncertainty (95%) bounds are between 60.3 and 83.5.
Country: Latvia , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.5 and 80.1. Uncertainty (95%) bounds are between 59.8 and 84.
Country: Latvia , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 80.5. Uncertainty (95%) bounds are between 59.5 and 84.5.
Country: Latvia , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.1 and 80.9. Uncertainty (95%) bounds are between 59 and 85.1.
Country: Latvia , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 81.3. Uncertainty (95%) bounds are between 58.5 and 85.5.
Country: Latvia , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 81.7. Uncertainty (95%) bounds are between 58 and 86.1.
Country: Latvia , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 82. Uncertainty (95%) bounds are between 57.7 and 86.5.
Country: Latvia , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.8 and 82.3. Uncertainty (95%) bounds are between 57.3 and 86.9.
Country: Latvia , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 82.7. Uncertainty (95%) bounds are between 57 and 87.2.
Country: Latvia , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 83. Uncertainty (95%) bounds are between 56.7 and 87.6.
Country: Latvia , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 83.3. Uncertainty (95%) bounds are between 56.5 and 87.9.
Country: Latvia , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 83.5. Uncertainty (95%) bounds are between 56.2 and 88.2.
Country: Latvia , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 83.8. Uncertainty (95%) bounds are between 56 and 88.5.
Country: Latvia , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 84.1. Uncertainty (95%) bounds are between 55.8 and 88.7.
Country: Latvia , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.2 and 84.3. Uncertainty (95%) bounds are between 55.5 and 89.
Country: Latvia , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.9 and 84.5. Uncertainty (95%) bounds are between 55.1 and 89.2.
Country: Latvia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 84.7. Uncertainty (95%) bounds are between 54.8 and 89.5.
Country: Latvia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 85. Uncertainty (95%) bounds are between 54.6 and 89.7.
Country: Latvia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.4 and 85.2. Uncertainty (95%) bounds are between 54.3 and 89.9.
Country: Latvia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 85.5. Uncertainty (95%) bounds are between 54.2 and 90.2.
Country: Latvia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.6 and 85.6. Uncertainty (95%) bounds are between 54.1 and 90.4.
Country: Latvia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 43 and 85.8. Uncertainty (95%) bounds are between 53.8 and 90.6.
Country: Latvia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.8 and 86. Uncertainty (95%) bounds are between 53.5 and 90.9.
Country: Latvia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.4 and 86.1. Uncertainty (95%) bounds are between 53.2 and 91.1.
Country: Lithuania , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 80.6. Uncertainty (95%) bounds are between 38.1 and 86.5.
Country: Lithuania , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.4 and 80.4. Uncertainty (95%) bounds are between 39 and 86.2.
Country: Lithuania , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 26.6 and 80.2. Uncertainty (95%) bounds are between 39.9 and 85.8.
Country: Lithuania , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.8 and 79.8. Uncertainty (95%) bounds are between 40.8 and 85.5.
Country: Lithuania , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.2 and 79.6. Uncertainty (95%) bounds are between 41.5 and 85.2.
Country: Lithuania , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 79.4. Uncertainty (95%) bounds are between 42.5 and 84.9.
Country: Lithuania , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 78.9. Uncertainty (95%) bounds are between 43.2 and 84.5.
Country: Lithuania , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.9 and 78.6. Uncertainty (95%) bounds are between 44.3 and 84.1.
Country: Lithuania , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.2 and 78.3. Uncertainty (95%) bounds are between 45.2 and 83.8.
Country: Lithuania , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 78. Uncertainty (95%) bounds are between 46.3 and 83.3.
Country: Lithuania , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 77.5. Uncertainty (95%) bounds are between 47.4 and 82.9.
Country: Lithuania , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 77.1. Uncertainty (95%) bounds are between 48.3 and 82.3.
Country: Lithuania , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.8 and 76.8. Uncertainty (95%) bounds are between 49.3 and 81.7.
Country: Lithuania , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.2 and 76.3. Uncertainty (95%) bounds are between 50.1 and 81.1.
Country: Lithuania , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.8 and 75.9. Uncertainty (95%) bounds are between 51.1 and 80.5.
Country: Lithuania , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.3 and 75.5. Uncertainty (95%) bounds are between 52.1 and 79.8.
Country: Lithuania , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.8 and 74.9. Uncertainty (95%) bounds are between 53.1 and 79.2.
Country: Lithuania , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 74.4. Uncertainty (95%) bounds are between 54.2 and 78.4.
Country: Lithuania , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 73.8. Uncertainty (95%) bounds are between 55.1 and 77.5.
Country: Lithuania , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 73.1. Uncertainty (95%) bounds are between 55.9 and 76.8.
Country: Lithuania , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 72.6. Uncertainty (95%) bounds are between 56.4 and 76.
Country: Lithuania , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 72. Uncertainty (95%) bounds are between 56.3 and 75.4.
Country: Lithuania , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 71.4. Uncertainty (95%) bounds are between 55.9 and 74.9.
Country: Lithuania , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 71. Uncertainty (95%) bounds are between 55.7 and 74.5.
Country: Lithuania , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 70.6. Uncertainty (95%) bounds are between 55.3 and 74.
Country: Lithuania , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 70.6. Uncertainty (95%) bounds are between 55.1 and 74.1.
Country: Lithuania , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 70.9. Uncertainty (95%) bounds are between 55.1 and 74.6.
Country: Lithuania , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 71.4. Uncertainty (95%) bounds are between 55.3 and 75.1.
Country: Lithuania , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.2 and 72. Uncertainty (95%) bounds are between 55.7 and 75.7.
Country: Lithuania , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 72.5. Uncertainty (95%) bounds are between 56.1 and 76.3.
Country: Lithuania , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 73.1. Uncertainty (95%) bounds are between 56.6 and 76.7.
Country: Lithuania , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 73.5. Uncertainty (95%) bounds are between 57.3 and 77.2.
Country: Lithuania , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 73.8. Uncertainty (95%) bounds are between 57.9 and 77.5.
Country: Lithuania , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 74.2. Uncertainty (95%) bounds are between 58.7 and 77.8.
Country: Lithuania , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 74.6. Uncertainty (95%) bounds are between 59.6 and 77.9.
Country: Lithuania , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 74.9. Uncertainty (95%) bounds are between 60.4 and 78.2.
Country: Lithuania , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 75.1. Uncertainty (95%) bounds are between 61.2 and 78.5.
Country: Lithuania , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 75.7. Uncertainty (95%) bounds are between 61.7 and 79.1.
Country: Lithuania , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 76.4. Uncertainty (95%) bounds are between 62.2 and 79.7.
Country: Lithuania , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 77. Uncertainty (95%) bounds are between 62.3 and 80.5.
Country: Lithuania , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.5 and 77.6. Uncertainty (95%) bounds are between 62.1 and 81.1.
Country: Lithuania , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 78.2. Uncertainty (95%) bounds are between 61.7 and 81.8.
Country: Lithuania , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 78.8. Uncertainty (95%) bounds are between 61.2 and 82.4.
Country: Lithuania , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 55 and 79.3. Uncertainty (95%) bounds are between 60.7 and 83.
Country: Lithuania , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 79.9. Uncertainty (95%) bounds are between 60.2 and 83.7.
Country: Lithuania , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.5 and 80.4. Uncertainty (95%) bounds are between 59.7 and 84.2.
Country: Lithuania , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 80.8. Uncertainty (95%) bounds are between 59.3 and 84.8.
Country: Lithuania , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.9 and 81.1. Uncertainty (95%) bounds are between 58.8 and 85.4.
Country: Lithuania , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 81.5. Uncertainty (95%) bounds are between 58.4 and 85.9.
Country: Lithuania , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 81.9. Uncertainty (95%) bounds are between 58 and 86.4.
Country: Lithuania , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 50 and 82.3. Uncertainty (95%) bounds are between 57.7 and 86.8.
Country: Lithuania , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 82.6. Uncertainty (95%) bounds are between 57.3 and 87.1.
Country: Lithuania , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 82.9. Uncertainty (95%) bounds are between 56.9 and 87.5.
Country: Malta , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.3 and 93. Uncertainty (95%) bounds are between 74.1 and 95.2.
Country: Malta , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.7 and 92.9. Uncertainty (95%) bounds are between 74.2 and 95.1.
Country: Malta , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.5 and 92.7. Uncertainty (95%) bounds are between 74 and 95.
Country: Malta , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 92.5. Uncertainty (95%) bounds are between 73.6 and 94.8.
Country: Malta , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 92.3. Uncertainty (95%) bounds are between 73.2 and 94.6.
Country: Malta , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 92. Uncertainty (95%) bounds are between 72.7 and 94.4.
Country: Malta , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 91.7. Uncertainty (95%) bounds are between 72.3 and 94.2.
Country: Malta , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 91.5. Uncertainty (95%) bounds are between 71.9 and 94.
Country: Malta , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 91.1. Uncertainty (95%) bounds are between 71.4 and 93.7.
Country: Malta , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.1 and 90.8. Uncertainty (95%) bounds are between 71 and 93.4.
Country: Malta , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 90.4. Uncertainty (95%) bounds are between 70.7 and 93.2.
Country: Malta , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 90.1. Uncertainty (95%) bounds are between 70.4 and 92.8.
Country: Malta , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 89.7. Uncertainty (95%) bounds are between 70.1 and 92.5.
Country: Malta , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 89.3. Uncertainty (95%) bounds are between 69.7 and 92.1.
Country: Malta , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 88.9. Uncertainty (95%) bounds are between 69.5 and 91.8.
Country: Malta , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 88.4. Uncertainty (95%) bounds are between 69.2 and 91.3.
Country: Malta , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 87.9. Uncertainty (95%) bounds are between 68.9 and 90.9.
Country: Malta , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 87.5. Uncertainty (95%) bounds are between 68.8 and 90.5.
Country: Malta , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 87. Uncertainty (95%) bounds are between 68.6 and 90.
Country: Malta , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 86.6. Uncertainty (95%) bounds are between 68.5 and 89.5.
Country: Malta , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 86.4. Uncertainty (95%) bounds are between 68.4 and 89.3.
Country: Malta , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 86.5. Uncertainty (95%) bounds are between 68.2 and 89.4.
Country: Malta , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 86.8. Uncertainty (95%) bounds are between 67.9 and 89.6.
Country: Malta , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 87.2. Uncertainty (95%) bounds are between 67.7 and 89.9.
Country: Malta , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.2 and 87.5. Uncertainty (95%) bounds are between 67.2 and 90.2.
Country: Malta , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.3 and 87.7. Uncertainty (95%) bounds are between 66.7 and 90.5.
Country: Malta , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.6 and 88. Uncertainty (95%) bounds are between 66.4 and 90.9.
Country: Malta , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 88.1. Uncertainty (95%) bounds are between 66 and 91.1.
Country: Malta , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.8 and 88.4. Uncertainty (95%) bounds are between 65.6 and 91.4.
Country: Malta , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 88.5. Uncertainty (95%) bounds are between 65.2 and 91.6.
Country: Malta , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.4 and 88.7. Uncertainty (95%) bounds are between 64.7 and 91.9.
Country: Malta , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 88.9. Uncertainty (95%) bounds are between 64.3 and 92.1.
Country: Malta , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 89. Uncertainty (95%) bounds are between 63.8 and 92.3.
Country: Malta , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.7 and 89.2. Uncertainty (95%) bounds are between 63.6 and 92.5.
Country: Malta , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.2 and 89.4. Uncertainty (95%) bounds are between 63.3 and 92.7.
Country: Malta , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.5 and 89.6. Uncertainty (95%) bounds are between 62.9 and 92.9.
Country: Malta , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.1 and 89.7. Uncertainty (95%) bounds are between 62.7 and 93.1.
Country: Malta , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 89.9. Uncertainty (95%) bounds are between 62.4 and 93.3.
Country: Malta , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 90.1. Uncertainty (95%) bounds are between 62.2 and 93.5.
Country: Malta , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.6 and 90.2. Uncertainty (95%) bounds are between 61.8 and 93.6.
Country: Malta , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.2 and 90.4. Uncertainty (95%) bounds are between 61.5 and 93.8.
Country: Malta , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.5 and 90.5. Uncertainty (95%) bounds are between 61.2 and 93.9.
Country: Malta , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 90.6. Uncertainty (95%) bounds are between 61 and 94.
Country: Malta , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 90.7. Uncertainty (95%) bounds are between 60.8 and 94.1.
Country: Malta , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 90.8. Uncertainty (95%) bounds are between 60.6 and 94.2.
Country: Malta , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 49 and 91. Uncertainty (95%) bounds are between 60.4 and 94.3.
Country: Malta , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 91.1. Uncertainty (95%) bounds are between 60.3 and 94.4.
Country: Malta , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 91.2. Uncertainty (95%) bounds are between 60.1 and 94.5.
Country: Malta , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 91.4. Uncertainty (95%) bounds are between 59.8 and 94.6.
Country: Malta , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 91.5. Uncertainty (95%) bounds are between 59.5 and 94.7.
Country: Malta , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.6 and 91.6. Uncertainty (95%) bounds are between 59.3 and 94.8.
Country: Malta , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 91.7. Uncertainty (95%) bounds are between 59 and 94.9.
Country: Malta , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 91.8. Uncertainty (95%) bounds are between 58.8 and 95.
Country: Montenegro , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.6 and 62.8. Uncertainty (95%) bounds are between 40.1 and 68.9.
Country: Montenegro , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.2 and 63.3. Uncertainty (95%) bounds are between 40.6 and 69.1.
Country: Montenegro , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.7 and 63.9. Uncertainty (95%) bounds are between 41 and 69.5.
Country: Montenegro , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 64.4. Uncertainty (95%) bounds are between 41.4 and 70.2.
Country: Montenegro , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.2 and 65.1. Uncertainty (95%) bounds are between 41.9 and 70.8.
Country: Montenegro , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 65.7. Uncertainty (95%) bounds are between 42.4 and 71.6.
Country: Montenegro , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.8 and 66.3. Uncertainty (95%) bounds are between 43 and 72.
Country: Montenegro , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 66.9. Uncertainty (95%) bounds are between 43.5 and 72.4.
Country: Montenegro , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.9 and 67.5. Uncertainty (95%) bounds are between 44.2 and 72.7.
Country: Montenegro , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.5 and 67.9. Uncertainty (95%) bounds are between 44.9 and 73.1.
Country: Montenegro , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 68.4. Uncertainty (95%) bounds are between 45.6 and 73.3.
Country: Montenegro , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 68.8. Uncertainty (95%) bounds are between 46.3 and 73.8.
Country: Montenegro , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.9 and 69.2. Uncertainty (95%) bounds are between 47.1 and 74.
Country: Montenegro , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.8 and 69.5. Uncertainty (95%) bounds are between 47.9 and 74.3.
Country: Montenegro , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.6 and 69.8. Uncertainty (95%) bounds are between 48.7 and 74.3.
Country: Montenegro , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.6 and 70. Uncertainty (95%) bounds are between 49.6 and 74.4.
Country: Montenegro , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.5 and 70.2. Uncertainty (95%) bounds are between 50.4 and 74.3.
Country: Montenegro , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.6 and 70.2. Uncertainty (95%) bounds are between 51.4 and 74.1.
Country: Montenegro , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 70.2. Uncertainty (95%) bounds are between 52.3 and 73.9.
Country: Montenegro , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.6 and 70.1. Uncertainty (95%) bounds are between 52.9 and 73.5.
Country: Montenegro , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 69.8. Uncertainty (95%) bounds are between 53.4 and 73.2.
Country: Montenegro , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.8 and 69.6. Uncertainty (95%) bounds are between 53 and 72.9.
Country: Montenegro , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.4 and 69.1. Uncertainty (95%) bounds are between 52.3 and 72.7.
Country: Montenegro , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 68.6. Uncertainty (95%) bounds are between 51.7 and 72.3.
Country: Montenegro , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 67.9. Uncertainty (95%) bounds are between 50.9 and 71.8.
Country: Montenegro , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.4 and 67. Uncertainty (95%) bounds are between 50.1 and 71.1.
Country: Montenegro , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.8 and 66.1. Uncertainty (95%) bounds are between 49.3 and 70.2.
Country: Montenegro , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 65.1. Uncertainty (95%) bounds are between 48.6 and 69.
Country: Montenegro , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 64. Uncertainty (95%) bounds are between 47.9 and 68.
Country: Montenegro , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.8 and 62.6. Uncertainty (95%) bounds are between 47.1 and 66.8.
Country: Montenegro , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 61.2. Uncertainty (95%) bounds are between 45.9 and 65.5.
Country: Montenegro , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.5 and 59.5. Uncertainty (95%) bounds are between 44.3 and 63.9.
Country: Montenegro , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.7 and 57.7. Uncertainty (95%) bounds are between 42.3 and 62.
Country: Montenegro , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.9 and 55.7. Uncertainty (95%) bounds are between 40.4 and 60.1.
Country: Montenegro , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35 and 53.7. Uncertainty (95%) bounds are between 38.6 and 58.
Country: Montenegro , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 51.6. Uncertainty (95%) bounds are between 36.7 and 55.9.
Country: Montenegro , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.5 and 49.7. Uncertainty (95%) bounds are between 34.8 and 54.2.
Country: Montenegro , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.7 and 47.9. Uncertainty (95%) bounds are between 33 and 52.5.
Country: Montenegro , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.9 and 46.2. Uncertainty (95%) bounds are between 31.3 and 50.8.
Country: Montenegro , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.3 and 44.4. Uncertainty (95%) bounds are between 29.7 and 49.1.
Country: Montenegro , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 42.6. Uncertainty (95%) bounds are between 28.3 and 47.2.
Country: Montenegro , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24 and 40.8. Uncertainty (95%) bounds are between 27 and 45.2.
Country: Montenegro , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.8 and 39.1. Uncertainty (95%) bounds are between 25.8 and 43.2.
Country: Montenegro , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.9 and 37.4. Uncertainty (95%) bounds are between 24.7 and 41.5.
Country: Montenegro , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21 and 36.3. Uncertainty (95%) bounds are between 23.7 and 40.5.
Country: Montenegro , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20 and 35.3. Uncertainty (95%) bounds are between 22.7 and 39.5.
Country: Montenegro , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.2 and 34.5. Uncertainty (95%) bounds are between 21.9 and 38.6.
Country: Montenegro , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.6 and 33.8. Uncertainty (95%) bounds are between 21.2 and 38.
Country: Montenegro , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18 and 33.3. Uncertainty (95%) bounds are between 20.6 and 37.6.
Country: Montenegro , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.3 and 33.8. Uncertainty (95%) bounds are between 20.1 and 38.3.
Country: Montenegro , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.7 and 34.5. Uncertainty (95%) bounds are between 19.6 and 39.3.
Country: Montenegro , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.1 and 35.3. Uncertainty (95%) bounds are between 19.3 and 40.4.
Country: Montenegro , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.5 and 36.2. Uncertainty (95%) bounds are between 18.9 and 41.7.
Country: Netherlands , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 68.1. Uncertainty (95%) bounds are between 56 and 70.9.
Country: Netherlands , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 69.6. Uncertainty (95%) bounds are between 57.8 and 72.5.
Country: Netherlands , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 71.2. Uncertainty (95%) bounds are between 59.7 and 74.
Country: Netherlands , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 72.8. Uncertainty (95%) bounds are between 61.7 and 75.3.
Country: Netherlands , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 74. Uncertainty (95%) bounds are between 63.7 and 76.4.
Country: Netherlands , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 75.1. Uncertainty (95%) bounds are between 65.5 and 77.2.
Country: Netherlands , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 75.7. Uncertainty (95%) bounds are between 66.8 and 77.8.
Country: Netherlands , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 76.2. Uncertainty (95%) bounds are between 67.7 and 78.2.
Country: Netherlands , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 76.8. Uncertainty (95%) bounds are between 68.1 and 78.9.
Country: Netherlands , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 77.3. Uncertainty (95%) bounds are between 68.3 and 79.4.
Country: Netherlands , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 77.7. Uncertainty (95%) bounds are between 68.5 and 79.7.
Country: Netherlands , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 77.9. Uncertainty (95%) bounds are between 68.7 and 80.
Country: Netherlands , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 78.1. Uncertainty (95%) bounds are between 69 and 80.
Country: Netherlands , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 78.2. Uncertainty (95%) bounds are between 68.9 and 80.2.
Country: Netherlands , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 78.2. Uncertainty (95%) bounds are between 68.9 and 80.3.
Country: Netherlands , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 78.1. Uncertainty (95%) bounds are between 69 and 80.1.
Country: Netherlands , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 77.9. Uncertainty (95%) bounds are between 69.3 and 79.6.
Country: Netherlands , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 77.6. Uncertainty (95%) bounds are between 69.6 and 79.1.
Country: Netherlands , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 77.3. Uncertainty (95%) bounds are between 69.9 and 78.7.
Country: Netherlands , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 77.4. Uncertainty (95%) bounds are between 69.8 and 78.9.
Country: Netherlands , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 77.6. Uncertainty (95%) bounds are between 69.6 and 79.2.
Country: Netherlands , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 77.9. Uncertainty (95%) bounds are between 69.5 and 79.7.
Country: Netherlands , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 78.2. Uncertainty (95%) bounds are between 69.4 and 80.1.
Country: Netherlands , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 78.5. Uncertainty (95%) bounds are between 69.4 and 80.4.
Country: Netherlands , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 78.5. Uncertainty (95%) bounds are between 69.2 and 80.4.
Country: Netherlands , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 78.5. Uncertainty (95%) bounds are between 69 and 80.5.
Country: Netherlands , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 78.2. Uncertainty (95%) bounds are between 68.9 and 80.3.
Country: Netherlands , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 78. Uncertainty (95%) bounds are between 68.9 and 79.8.
Country: Netherlands , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 77.7. Uncertainty (95%) bounds are between 68.9 and 79.4.
Country: Netherlands , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 77.6. Uncertainty (95%) bounds are between 68.6 and 79.4.
Country: Netherlands , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 77.6. Uncertainty (95%) bounds are between 68.5 and 79.5.
Country: Netherlands , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 77.6. Uncertainty (95%) bounds are between 68.4 and 79.4.
Country: Netherlands , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 77.4. Uncertainty (95%) bounds are between 68.4 and 79.2.
Country: Netherlands , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 77.3. Uncertainty (95%) bounds are between 68.5 and 78.9.
Country: Netherlands , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 77.3. Uncertainty (95%) bounds are between 68.3 and 79.1.
Country: Netherlands , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 77.4. Uncertainty (95%) bounds are between 68.1 and 79.1.
Country: Netherlands , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 77.3. Uncertainty (95%) bounds are between 68 and 79.1.
Country: Netherlands , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 77.1. Uncertainty (95%) bounds are between 67.9 and 78.9.
Country: Netherlands , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 76.8. Uncertainty (95%) bounds are between 67.9 and 78.6.
Country: Netherlands , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 76.8. Uncertainty (95%) bounds are between 67.6 and 78.6.
Country: Netherlands , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 76.7. Uncertainty (95%) bounds are between 67.2 and 78.7.
Country: Netherlands , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 76.6. Uncertainty (95%) bounds are between 66.8 and 78.5.
Country: Netherlands , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 76.4. Uncertainty (95%) bounds are between 66.6 and 78.4.
Country: Netherlands , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 76.3. Uncertainty (95%) bounds are between 66.3 and 78.4.
Country: Netherlands , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 76.8. Uncertainty (95%) bounds are between 65.7 and 79.1.
Country: Netherlands , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 77.4. Uncertainty (95%) bounds are between 65 and 79.9.
Country: Netherlands , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 78. Uncertainty (95%) bounds are between 64.2 and 80.9.
Country: Netherlands , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.5 and 78.7. Uncertainty (95%) bounds are between 63.6 and 81.6.
Country: Netherlands , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.5 and 79.2. Uncertainty (95%) bounds are between 62.9 and 82.3.
Country: Netherlands , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 79.8. Uncertainty (95%) bounds are between 62.3 and 83.2.
Country: Netherlands , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.8 and 80.3. Uncertainty (95%) bounds are between 61.7 and 83.9.
Country: Netherlands , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 55 and 80.8. Uncertainty (95%) bounds are between 61.3 and 84.5.
Country: Netherlands , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.2 and 81.2. Uncertainty (95%) bounds are between 60.9 and 85.
Country: New Zealand , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 77.9. Uncertainty (95%) bounds are between 56.8 and 81.9.
Country: New Zealand , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 77.4. Uncertainty (95%) bounds are between 57.7 and 81.3.
Country: New Zealand , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.4 and 77. Uncertainty (95%) bounds are between 58.7 and 80.6.
Country: New Zealand , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 76.4. Uncertainty (95%) bounds are between 59.6 and 79.8.
Country: New Zealand , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 75.9. Uncertainty (95%) bounds are between 60.6 and 79.
Country: New Zealand , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 75.5. Uncertainty (95%) bounds are between 61.5 and 78.4.
Country: New Zealand , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 75.2. Uncertainty (95%) bounds are between 62.1 and 78.
Country: New Zealand , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 75.4. Uncertainty (95%) bounds are between 62.3 and 78.2.
Country: New Zealand , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 75.8. Uncertainty (95%) bounds are between 62.4 and 78.7.
Country: New Zealand , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 76.2. Uncertainty (95%) bounds are between 62.4 and 79.1.
Country: New Zealand , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 76.5. Uncertainty (95%) bounds are between 62.4 and 79.5.
Country: New Zealand , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 76.9. Uncertainty (95%) bounds are between 62.4 and 79.9.
Country: New Zealand , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 77.1. Uncertainty (95%) bounds are between 62.5 and 80.2.
Country: New Zealand , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 77.3. Uncertainty (95%) bounds are between 62.7 and 80.4.
Country: New Zealand , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 77.5. Uncertainty (95%) bounds are between 62.9 and 80.5.
Country: New Zealand , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 77.5. Uncertainty (95%) bounds are between 63.3 and 80.6.
Country: New Zealand , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 77.6. Uncertainty (95%) bounds are between 63.7 and 80.5.
Country: New Zealand , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 77.5. Uncertainty (95%) bounds are between 64.2 and 80.4.
Country: New Zealand , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 77.5. Uncertainty (95%) bounds are between 64.7 and 80.2.
Country: New Zealand , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 77.4. Uncertainty (95%) bounds are between 65.3 and 80.1.
Country: New Zealand , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 77.4. Uncertainty (95%) bounds are between 65.9 and 80.
Country: New Zealand , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 77.6. Uncertainty (95%) bounds are between 66.3 and 80.1.
Country: New Zealand , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 77.9. Uncertainty (95%) bounds are between 66.6 and 80.4.
Country: New Zealand , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 78.2. Uncertainty (95%) bounds are between 66.9 and 80.7.
Country: New Zealand , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 78.6. Uncertainty (95%) bounds are between 67.4 and 81.1.
Country: New Zealand , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 78.9. Uncertainty (95%) bounds are between 67.7 and 81.6.
Country: New Zealand , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 79.6. Uncertainty (95%) bounds are between 67.8 and 82.2.
Country: New Zealand , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 80.2. Uncertainty (95%) bounds are between 67.9 and 82.8.
Country: New Zealand , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 80.9. Uncertainty (95%) bounds are between 68 and 83.5.
Country: New Zealand , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 81.4. Uncertainty (95%) bounds are between 68.1 and 84.1.
Country: New Zealand , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 81.9. Uncertainty (95%) bounds are between 68.2 and 84.7.
Country: New Zealand , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 82.3. Uncertainty (95%) bounds are between 68.4 and 85.1.
Country: New Zealand , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 82.8. Uncertainty (95%) bounds are between 68.7 and 85.5.
Country: New Zealand , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 83.1. Uncertainty (95%) bounds are between 69 and 85.9.
Country: New Zealand , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 83.4. Uncertainty (95%) bounds are between 69.3 and 86.2.
Country: New Zealand , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 83.7. Uncertainty (95%) bounds are between 69.8 and 86.4.
Country: New Zealand , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 83.9. Uncertainty (95%) bounds are between 70.2 and 86.5.
Country: New Zealand , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 84.1. Uncertainty (95%) bounds are between 70.8 and 86.7.
Country: New Zealand , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 84.3. Uncertainty (95%) bounds are between 71.4 and 86.8.
Country: New Zealand , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 84.4. Uncertainty (95%) bounds are between 72.1 and 86.8.
Country: New Zealand , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.8 and 84.5. Uncertainty (95%) bounds are between 72.7 and 86.8.
Country: New Zealand , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 84.6. Uncertainty (95%) bounds are between 73.4 and 86.8.
Country: New Zealand , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.6 and 84.6. Uncertainty (95%) bounds are between 74.1 and 86.7.
Country: New Zealand , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.5 and 84.6. Uncertainty (95%) bounds are between 74.7 and 86.7.
Country: New Zealand , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72 and 84.8. Uncertainty (95%) bounds are between 75.1 and 86.8.
Country: New Zealand , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72 and 85. Uncertainty (95%) bounds are between 75.2 and 87.1.
Country: New Zealand , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.4 and 85.3. Uncertainty (95%) bounds are between 75 and 87.6.
Country: New Zealand , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.5 and 85.8. Uncertainty (95%) bounds are between 74.5 and 88.
Country: New Zealand , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.6 and 86.2. Uncertainty (95%) bounds are between 74 and 88.5.
Country: New Zealand , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.5 and 86.6. Uncertainty (95%) bounds are between 73.3 and 89.
Country: New Zealand , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.7 and 86.9. Uncertainty (95%) bounds are between 72.8 and 89.4.
Country: New Zealand , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.9 and 87.2. Uncertainty (95%) bounds are between 72.3 and 89.8.
Country: New Zealand , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.9 and 87.5. Uncertainty (95%) bounds are between 71.8 and 90.1.
Country: North Macedonia , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.8 and 63.2. Uncertainty (95%) bounds are between 36.2 and 69.6.
Country: North Macedonia , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.4 and 63.5. Uncertainty (95%) bounds are between 36.9 and 69.9.
Country: North Macedonia , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.1 and 64. Uncertainty (95%) bounds are between 37.6 and 70.2.
Country: North Macedonia , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.8 and 64.5. Uncertainty (95%) bounds are between 38.4 and 70.9.
Country: North Macedonia , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.5 and 65.1. Uncertainty (95%) bounds are between 39 and 71.4.
Country: North Macedonia , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.1 and 65.7. Uncertainty (95%) bounds are between 39.7 and 71.9.
Country: North Macedonia , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.9 and 66.4. Uncertainty (95%) bounds are between 40.6 and 72.3.
Country: North Macedonia , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.6 and 67. Uncertainty (95%) bounds are between 41.4 and 72.8.
Country: North Macedonia , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.5 and 67.5. Uncertainty (95%) bounds are between 42.1 and 73.2.
Country: North Macedonia , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 68. Uncertainty (95%) bounds are between 43 and 73.7.
Country: North Macedonia , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 68.6. Uncertainty (95%) bounds are between 43.9 and 74.
Country: North Macedonia , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.1 and 69.1. Uncertainty (95%) bounds are between 44.7 and 74.3.
Country: North Macedonia , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.1 and 69.5. Uncertainty (95%) bounds are between 45.6 and 74.5.
Country: North Macedonia , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.2 and 69.9. Uncertainty (95%) bounds are between 46.5 and 74.7.
Country: North Macedonia , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.2 and 70.2. Uncertainty (95%) bounds are between 47.7 and 74.9.
Country: North Macedonia , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.2 and 70.5. Uncertainty (95%) bounds are between 48.8 and 74.8.
Country: North Macedonia , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.3 and 70.7. Uncertainty (95%) bounds are between 49.8 and 74.8.
Country: North Macedonia , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 70.8. Uncertainty (95%) bounds are between 50.8 and 74.8.
Country: North Macedonia , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.3 and 70.8. Uncertainty (95%) bounds are between 51.7 and 74.8.
Country: North Macedonia , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 70.9. Uncertainty (95%) bounds are between 52.5 and 74.5.
Country: North Macedonia , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 70.8. Uncertainty (95%) bounds are between 53 and 74.4.
Country: North Macedonia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.6 and 70.8. Uncertainty (95%) bounds are between 52.7 and 74.3.
Country: North Macedonia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 70.7. Uncertainty (95%) bounds are between 52.2 and 74.5.
Country: North Macedonia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.3 and 70.5. Uncertainty (95%) bounds are between 51.5 and 74.6.
Country: North Macedonia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 70.4. Uncertainty (95%) bounds are between 50.6 and 74.7.
Country: North Macedonia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 70.1. Uncertainty (95%) bounds are between 49.7 and 74.4.
Country: North Macedonia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43 and 69.8. Uncertainty (95%) bounds are between 48.9 and 74.2.
Country: North Macedonia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 69.2. Uncertainty (95%) bounds are between 48.1 and 73.9.
Country: North Macedonia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.1 and 68.8. Uncertainty (95%) bounds are between 47.3 and 73.6.
Country: North Macedonia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.3 and 68.3. Uncertainty (95%) bounds are between 46.6 and 73.1.
Country: North Macedonia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 67.8. Uncertainty (95%) bounds are between 46 and 72.5.
Country: North Macedonia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 67.2. Uncertainty (95%) bounds are between 45.3 and 72.1.
Country: North Macedonia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 66.6. Uncertainty (95%) bounds are between 44.8 and 71.4.
Country: North Macedonia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.4 and 65.9. Uncertainty (95%) bounds are between 44.2 and 70.8.
Country: North Macedonia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38 and 65.2. Uncertainty (95%) bounds are between 43.6 and 70.2.
Country: North Macedonia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.7 and 64.4. Uncertainty (95%) bounds are between 43.2 and 69.4.
Country: North Macedonia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 63.7. Uncertainty (95%) bounds are between 42.8 and 68.6.
Country: North Macedonia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 62.9. Uncertainty (95%) bounds are between 42.4 and 67.8.
Country: North Macedonia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 62. Uncertainty (95%) bounds are between 42.1 and 66.9.
Country: North Macedonia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 61.2. Uncertainty (95%) bounds are between 41.8 and 66.1.
Country: North Macedonia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 60.5. Uncertainty (95%) bounds are between 41.7 and 65.2.
Country: North Macedonia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 60.1. Uncertainty (95%) bounds are between 41.6 and 64.8.
Country: North Macedonia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 60.1. Uncertainty (95%) bounds are between 41.6 and 64.9.
Country: North Macedonia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 60.3. Uncertainty (95%) bounds are between 41.7 and 65.2.
Country: North Macedonia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 60.7. Uncertainty (95%) bounds are between 42 and 65.7.
Country: North Macedonia , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.6 and 61.1. Uncertainty (95%) bounds are between 42.3 and 65.9.
Country: North Macedonia , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.1 and 61.4. Uncertainty (95%) bounds are between 42.7 and 66.2.
Country: North Macedonia , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.4 and 61.8. Uncertainty (95%) bounds are between 43 and 66.7.
Country: North Macedonia , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.8 and 62.2. Uncertainty (95%) bounds are between 43.4 and 67.
Country: North Macedonia , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 62.7. Uncertainty (95%) bounds are between 43.4 and 67.6.
Country: North Macedonia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 63.5. Uncertainty (95%) bounds are between 43.3 and 68.2.
Country: North Macedonia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.3 and 64.1. Uncertainty (95%) bounds are between 42.9 and 69.2.
Country: North Macedonia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 64.9. Uncertainty (95%) bounds are between 42.5 and 70.2.
Country: Norway , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 42 and 78.3. Uncertainty (95%) bounds are between 52.2 and 82.7.
Country: Norway , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.4 and 77.8. Uncertainty (95%) bounds are between 53.2 and 82.
Country: Norway , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 77.3. Uncertainty (95%) bounds are between 54.2 and 81.3.
Country: Norway , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.1 and 76.8. Uncertainty (95%) bounds are between 55.2 and 80.5.
Country: Norway , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 76.3. Uncertainty (95%) bounds are between 56.1 and 79.9.
Country: Norway , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.6 and 75.8. Uncertainty (95%) bounds are between 57.1 and 79.1.
Country: Norway , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 75.4. Uncertainty (95%) bounds are between 58 and 78.6.
Country: Norway , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 75.2. Uncertainty (95%) bounds are between 58.9 and 78.2.
Country: Norway , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 75.4. Uncertainty (95%) bounds are between 59.4 and 78.1.
Country: Norway , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 75.7. Uncertainty (95%) bounds are between 60 and 78.6.
Country: Norway , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 76.2. Uncertainty (95%) bounds are between 60.4 and 79.1.
Country: Norway , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 76.7. Uncertainty (95%) bounds are between 60.8 and 79.6.
Country: Norway , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 77.1. Uncertainty (95%) bounds are between 61.4 and 80.
Country: Norway , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 77.5. Uncertainty (95%) bounds are between 62 and 80.3.
Country: Norway , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 77.8. Uncertainty (95%) bounds are between 62.6 and 80.7.
Country: Norway , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 78. Uncertainty (95%) bounds are between 63.3 and 80.8.
Country: Norway , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 78.2. Uncertainty (95%) bounds are between 64.2 and 80.8.
Country: Norway , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 78.3. Uncertainty (95%) bounds are between 65.1 and 80.8.
Country: Norway , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 78.4. Uncertainty (95%) bounds are between 66 and 80.9.
Country: Norway , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 78.8. Uncertainty (95%) bounds are between 67.1 and 81.2.
Country: Norway , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 79.4. Uncertainty (95%) bounds are between 68 and 81.7.
Country: Norway , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 80.3. Uncertainty (95%) bounds are between 68.8 and 82.5.
Country: Norway , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 81.3. Uncertainty (95%) bounds are between 69.6 and 83.4.
Country: Norway , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 82.3. Uncertainty (95%) bounds are between 70.5 and 84.3.
Country: Norway , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 83.2. Uncertainty (95%) bounds are between 71.4 and 85.1.
Country: Norway , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67 and 83.9. Uncertainty (95%) bounds are between 72.5 and 85.6.
Country: Norway , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.7 and 84.6. Uncertainty (95%) bounds are between 73.4 and 86.1.
Country: Norway , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 85.2. Uncertainty (95%) bounds are between 74.4 and 86.6.
Country: Norway , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.2 and 85.8. Uncertainty (95%) bounds are between 75.1 and 87.
Country: Norway , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 86.4. Uncertainty (95%) bounds are between 75.6 and 87.6.
Country: Norway , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 86.9. Uncertainty (95%) bounds are between 76 and 88.2.
Country: Norway , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.2 and 87.4. Uncertainty (95%) bounds are between 76.4 and 88.7.
Country: Norway , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.7 and 87.7. Uncertainty (95%) bounds are between 76.8 and 89.
Country: Norway , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 87.9. Uncertainty (95%) bounds are between 77.3 and 89.2.
Country: Norway , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.7 and 88.1. Uncertainty (95%) bounds are between 77.7 and 89.3.
Country: Norway , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.2 and 88.3. Uncertainty (95%) bounds are between 78.1 and 89.4.
Country: Norway , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 72 and 88.6. Uncertainty (95%) bounds are between 78.1 and 89.8.
Country: Norway , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.6 and 89. Uncertainty (95%) bounds are between 77.9 and 90.3.
Country: Norway , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.3 and 89.3. Uncertainty (95%) bounds are between 77.7 and 90.9.
Country: Norway , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.7 and 89.7. Uncertainty (95%) bounds are between 77.3 and 91.4.
Country: Norway , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.2 and 90. Uncertainty (95%) bounds are between 77 and 91.8.
Country: Norway , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.7 and 90.2. Uncertainty (95%) bounds are between 76.5 and 92.1.
Country: Norway , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.2 and 90.5. Uncertainty (95%) bounds are between 76.2 and 92.5.
Country: Norway , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.6 and 90.7. Uncertainty (95%) bounds are between 75.9 and 92.7.
Country: Norway , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.1 and 91. Uncertainty (95%) bounds are between 75.5 and 93.
Country: Norway , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.4 and 91.2. Uncertainty (95%) bounds are between 75.1 and 93.3.
Country: Norway , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 67 and 91.3. Uncertainty (95%) bounds are between 74.7 and 93.5.
Country: Norway , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.4 and 91.5. Uncertainty (95%) bounds are between 74.4 and 93.7.
Country: Norway , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.8 and 91.7. Uncertainty (95%) bounds are between 74 and 93.9.
Country: Norway , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.1 and 91.9. Uncertainty (95%) bounds are between 73.7 and 94.1.
Country: Norway , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.6 and 92. Uncertainty (95%) bounds are between 73.5 and 94.3.
Country: Norway , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.1 and 92.2. Uncertainty (95%) bounds are between 73 and 94.4.
Country: Norway , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 92.3. Uncertainty (95%) bounds are between 72.8 and 94.6.
Country: Poland , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 70.8. Uncertainty (95%) bounds are between 50.9 and 75.4.
Country: Poland , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 70.7. Uncertainty (95%) bounds are between 52.2 and 75.1.
Country: Poland , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 70.9. Uncertainty (95%) bounds are between 53.5 and 74.9.
Country: Poland , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.6 and 71.8. Uncertainty (95%) bounds are between 55.1 and 75.8.
Country: Poland , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 73. Uncertainty (95%) bounds are between 56.8 and 76.9.
Country: Poland , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 74.2. Uncertainty (95%) bounds are between 58.4 and 77.8.
Country: Poland , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 75.2. Uncertainty (95%) bounds are between 60 and 78.7.
Country: Poland , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 76.2. Uncertainty (95%) bounds are between 61.3 and 79.5.
Country: Poland , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 76.8. Uncertainty (95%) bounds are between 61.9 and 80.
Country: Poland , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 77.3. Uncertainty (95%) bounds are between 62.3 and 80.3.
Country: Poland , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 77.6. Uncertainty (95%) bounds are between 62.5 and 80.8.
Country: Poland , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 77.8. Uncertainty (95%) bounds are between 62.6 and 80.9.
Country: Poland , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 78. Uncertainty (95%) bounds are between 62.7 and 81.2.
Country: Poland , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 78.1. Uncertainty (95%) bounds are between 63 and 81.3.
Country: Poland , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 78.2. Uncertainty (95%) bounds are between 63.3 and 81.3.
Country: Poland , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 78.1. Uncertainty (95%) bounds are between 63.7 and 81.2.
Country: Poland , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 78. Uncertainty (95%) bounds are between 64 and 81.1.
Country: Poland , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 77.8. Uncertainty (95%) bounds are between 64.5 and 80.9.
Country: Poland , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 77.7. Uncertainty (95%) bounds are between 64.9 and 80.7.
Country: Poland , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 77.5. Uncertainty (95%) bounds are between 65.4 and 80.4.
Country: Poland , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 77.4. Uncertainty (95%) bounds are between 65.7 and 80.3.
Country: Poland , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 77.6. Uncertainty (95%) bounds are between 65.7 and 80.4.
Country: Poland , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 77.8. Uncertainty (95%) bounds are between 65.4 and 80.8.
Country: Poland , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 78.1. Uncertainty (95%) bounds are between 64.9 and 81.1.
Country: Poland , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 78.3. Uncertainty (95%) bounds are between 64.3 and 81.4.
Country: Poland , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 78.5. Uncertainty (95%) bounds are between 63.7 and 81.6.
Country: Poland , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 78.6. Uncertainty (95%) bounds are between 63.3 and 81.8.
Country: Poland , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 78.6. Uncertainty (95%) bounds are between 62.9 and 82.
Country: Poland , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 78.7. Uncertainty (95%) bounds are between 62.5 and 82.
Country: Poland , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 78.6. Uncertainty (95%) bounds are between 62.2 and 82.
Country: Poland , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 78.6. Uncertainty (95%) bounds are between 62 and 82.
Country: Poland , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 78.4. Uncertainty (95%) bounds are between 61.8 and 82.
Country: Poland , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 78.3. Uncertainty (95%) bounds are between 61.6 and 81.9.
Country: Poland , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 78.2. Uncertainty (95%) bounds are between 61.6 and 81.7.
Country: Poland , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 78. Uncertainty (95%) bounds are between 61.6 and 81.6.
Country: Poland , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 77.7. Uncertainty (95%) bounds are between 61.6 and 81.2.
Country: Poland , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 77.5. Uncertainty (95%) bounds are between 61.8 and 80.9.
Country: Poland , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 77.2. Uncertainty (95%) bounds are between 62 and 80.6.
Country: Poland , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 76.9. Uncertainty (95%) bounds are between 62.2 and 80.3.
Country: Poland , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 76.6. Uncertainty (95%) bounds are between 62.8 and 80.
Country: Poland , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 76.5. Uncertainty (95%) bounds are between 63.4 and 79.7.
Country: Poland , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 76.6. Uncertainty (95%) bounds are between 64.4 and 79.7.
Country: Poland , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.9 and 76.9. Uncertainty (95%) bounds are between 65.7 and 79.9.
Country: Poland , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 77.3. Uncertainty (95%) bounds are between 67 and 80.2.
Country: Poland , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 77.8. Uncertainty (95%) bounds are between 67.9 and 80.7.
Country: Poland , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 65 and 78.4. Uncertainty (95%) bounds are between 67.8 and 81.3.
Country: Poland , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.2 and 79.2. Uncertainty (95%) bounds are between 67.4 and 82.
Country: Poland , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 63 and 79.8. Uncertainty (95%) bounds are between 66.9 and 82.8.
Country: Poland , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 80.4. Uncertainty (95%) bounds are between 66.3 and 83.6.
Country: Poland , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 81. Uncertainty (95%) bounds are between 65.6 and 84.4.
Country: Poland , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 81.5. Uncertainty (95%) bounds are between 64.9 and 85.
Country: Poland , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.5 and 82. Uncertainty (95%) bounds are between 64.2 and 85.5.
Country: Poland , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.7 and 82.4. Uncertainty (95%) bounds are between 63.7 and 86.
Country: Portugal , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 84.4. Uncertainty (95%) bounds are between 60 and 88.3.
Country: Portugal , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 84. Uncertainty (95%) bounds are between 60.6 and 87.9.
Country: Portugal , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.5 and 83.7. Uncertainty (95%) bounds are between 61.3 and 87.6.
Country: Portugal , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 83.4. Uncertainty (95%) bounds are between 62.1 and 87.2.
Country: Portugal , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.8 and 83.1. Uncertainty (95%) bounds are between 62.8 and 86.7.
Country: Portugal , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 82.8. Uncertainty (95%) bounds are between 63.7 and 86.3.
Country: Portugal , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 82.4. Uncertainty (95%) bounds are between 64.4 and 85.8.
Country: Portugal , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 82.1. Uncertainty (95%) bounds are between 65.1 and 85.3.
Country: Portugal , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.4 and 81.7. Uncertainty (95%) bounds are between 65.8 and 84.7.
Country: Portugal , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 81.3. Uncertainty (95%) bounds are between 66.2 and 84.3.
Country: Portugal , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 81.1. Uncertainty (95%) bounds are between 66.5 and 84.
Country: Portugal , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 80.9. Uncertainty (95%) bounds are between 66.5 and 83.9.
Country: Portugal , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 80.8. Uncertainty (95%) bounds are between 66.5 and 83.9.
Country: Portugal , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 80.7. Uncertainty (95%) bounds are between 66.5 and 83.8.
Country: Portugal , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 80.6. Uncertainty (95%) bounds are between 66.5 and 83.7.
Country: Portugal , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 80.4. Uncertainty (95%) bounds are between 66.4 and 83.5.
Country: Portugal , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 80.3. Uncertainty (95%) bounds are between 66.5 and 83.4.
Country: Portugal , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 80.2. Uncertainty (95%) bounds are between 66.7 and 83.2.
Country: Portugal , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 80. Uncertainty (95%) bounds are between 66.9 and 83.
Country: Portugal , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 80. Uncertainty (95%) bounds are between 67 and 82.9.
Country: Portugal , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 80. Uncertainty (95%) bounds are between 67.2 and 82.9.
Country: Portugal , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 80.3. Uncertainty (95%) bounds are between 67.3 and 83.2.
Country: Portugal , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.9 and 80.8. Uncertainty (95%) bounds are between 67.3 and 83.6.
Country: Portugal , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.8 and 81.2. Uncertainty (95%) bounds are between 67.3 and 84.
Country: Portugal , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 81.7. Uncertainty (95%) bounds are between 67.4 and 84.4.
Country: Portugal , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 82.1. Uncertainty (95%) bounds are between 67.6 and 84.8.
Country: Portugal , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 82.5. Uncertainty (95%) bounds are between 67.9 and 85.1.
Country: Portugal , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 83. Uncertainty (95%) bounds are between 68 and 85.4.
Country: Portugal , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 83.4. Uncertainty (95%) bounds are between 68.2 and 85.7.
Country: Portugal , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 83.7. Uncertainty (95%) bounds are between 68.5 and 86.
Country: Portugal , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 84. Uncertainty (95%) bounds are between 68.9 and 86.2.
Country: Portugal , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 84.2. Uncertainty (95%) bounds are between 69.3 and 86.3.
Country: Portugal , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 84.4. Uncertainty (95%) bounds are between 69.7 and 86.4.
Country: Portugal , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 84.5. Uncertainty (95%) bounds are between 70.1 and 86.4.
Country: Portugal , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 84.4. Uncertainty (95%) bounds are between 70.5 and 86.2.
Country: Portugal , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 84.2. Uncertainty (95%) bounds are between 70.8 and 86.
Country: Portugal , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 83.8. Uncertainty (95%) bounds are between 70.7 and 85.6.
Country: Portugal , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 83.4. Uncertainty (95%) bounds are between 70.5 and 85.3.
Country: Portugal , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 82.8. Uncertainty (95%) bounds are between 70.3 and 84.7.
Country: Portugal , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 82.1. Uncertainty (95%) bounds are between 70 and 84.1.
Country: Portugal , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 81.3. Uncertainty (95%) bounds are between 69.7 and 83.4.
Country: Portugal , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 80.4. Uncertainty (95%) bounds are between 69.5 and 82.5.
Country: Portugal , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 79.5. Uncertainty (95%) bounds are between 69.3 and 81.6.
Country: Portugal , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 78.6. Uncertainty (95%) bounds are between 69.2 and 80.6.
Country: Portugal , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 78. Uncertainty (95%) bounds are between 69 and 80.
Country: Portugal , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.6 and 78.2. Uncertainty (95%) bounds are between 68.3 and 80.3.
Country: Portugal , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 78.6. Uncertainty (95%) bounds are between 67.4 and 81.
Country: Portugal , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.4 and 79.2. Uncertainty (95%) bounds are between 66.7 and 81.8.
Country: Portugal , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.1 and 79.7. Uncertainty (95%) bounds are between 65.8 and 82.6.
Country: Portugal , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.9 and 80.2. Uncertainty (95%) bounds are between 65.1 and 83.3.
Country: Portugal , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.7 and 80.8. Uncertainty (95%) bounds are between 64.4 and 84.
Country: Portugal , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.9 and 81.2. Uncertainty (95%) bounds are between 63.8 and 84.7.
Country: Portugal , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 81.7. Uncertainty (95%) bounds are between 63.3 and 85.2.
Country: Republic of Kazakhstan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 11 and 71. Uncertainty (95%) bounds are between 20.1 and 79.9.
Country: Republic of Kazakhstan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.9 and 70.8. Uncertainty (95%) bounds are between 21.2 and 79.6.
Country: Republic of Kazakhstan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 13 and 70.5. Uncertainty (95%) bounds are between 22.2 and 79.4.
Country: Republic of Kazakhstan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 14 and 70.3. Uncertainty (95%) bounds are between 23.1 and 78.9.
Country: Republic of Kazakhstan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.2 and 70. Uncertainty (95%) bounds are between 24.1 and 78.6.
Country: Republic of Kazakhstan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.2 and 69.6. Uncertainty (95%) bounds are between 25.3 and 78.
Country: Republic of Kazakhstan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.4 and 69.2. Uncertainty (95%) bounds are between 26.5 and 77.6.
Country: Republic of Kazakhstan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.6 and 68.9. Uncertainty (95%) bounds are between 27.5 and 77.1.
Country: Republic of Kazakhstan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.9 and 68.7. Uncertainty (95%) bounds are between 28.7 and 76.6.
Country: Republic of Kazakhstan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.4 and 68.4. Uncertainty (95%) bounds are between 29.9 and 76.2.
Country: Republic of Kazakhstan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 68.1. Uncertainty (95%) bounds are between 31.4 and 75.4.
Country: Republic of Kazakhstan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.2 and 67.7. Uncertainty (95%) bounds are between 32.6 and 74.7.
Country: Republic of Kazakhstan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.8 and 67.2. Uncertainty (95%) bounds are between 34 and 74.1.
Country: Republic of Kazakhstan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.3 and 66.8. Uncertainty (95%) bounds are between 35.3 and 73.5.
Country: Republic of Kazakhstan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 29 and 66.5. Uncertainty (95%) bounds are between 36.6 and 72.7.
Country: Republic of Kazakhstan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 66. Uncertainty (95%) bounds are between 38.2 and 71.8.
Country: Republic of Kazakhstan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.9 and 65.5. Uncertainty (95%) bounds are between 39.6 and 71.1.
Country: Republic of Kazakhstan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.8 and 65. Uncertainty (95%) bounds are between 41 and 70.3.
Country: Republic of Kazakhstan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 64.3. Uncertainty (95%) bounds are between 42.5 and 69.4.
Country: Republic of Kazakhstan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 39 and 63.7. Uncertainty (95%) bounds are between 44.2 and 68.3.
Country: Republic of Kazakhstan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 63.1. Uncertainty (95%) bounds are between 45.9 and 67.5.
Country: Republic of Kazakhstan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.6 and 62.6. Uncertainty (95%) bounds are between 47.6 and 66.5.
Country: Republic of Kazakhstan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 46 and 62.1. Uncertainty (95%) bounds are between 49.5 and 65.4.
Country: Republic of Kazakhstan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 61.6. Uncertainty (95%) bounds are between 51.5 and 64.3.
Country: Republic of Kazakhstan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 61.2. Uncertainty (95%) bounds are between 53.5 and 63.2.
Country: Republic of Kazakhstan , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 61.3. Uncertainty (95%) bounds are between 55.5 and 62.9.
Country: Republic of Kazakhstan , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 62.7. Uncertainty (95%) bounds are between 56.7 and 64.2.
Country: Republic of Kazakhstan , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 64.3. Uncertainty (95%) bounds are between 58.1 and 65.8.
Country: Republic of Kazakhstan , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 65.3. Uncertainty (95%) bounds are between 59.6 and 66.8.
Country: Republic of Kazakhstan , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 65.8. Uncertainty (95%) bounds are between 60.5 and 67.1.
Country: Republic of Kazakhstan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 66.1. Uncertainty (95%) bounds are between 59.5 and 67.8.
Country: Republic of Kazakhstan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 66. Uncertainty (95%) bounds are between 57.8 and 68.
Country: Republic of Kazakhstan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.5 and 65.5. Uncertainty (95%) bounds are between 56.1 and 67.8.
Country: Republic of Kazakhstan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 64.6. Uncertainty (95%) bounds are between 54.4 and 67.2.
Country: Republic of Kazakhstan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 63.4. Uncertainty (95%) bounds are between 52.8 and 66.2.
Country: Republic of Kazakhstan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 62.2. Uncertainty (95%) bounds are between 51.4 and 65.
Country: Republic of Kazakhstan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.4 and 61.1. Uncertainty (95%) bounds are between 50.3 and 64.
Country: Republic of Kazakhstan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.6 and 60.5. Uncertainty (95%) bounds are between 49.5 and 63.4.
Country: Republic of Kazakhstan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 59.9. Uncertainty (95%) bounds are between 48.9 and 62.8.
Country: Republic of Kazakhstan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 59.5. Uncertainty (95%) bounds are between 48.4 and 62.3.
Country: Republic of Kazakhstan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.4 and 59.1. Uncertainty (95%) bounds are between 48.3 and 61.8.
Country: Republic of Kazakhstan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.3 and 58.9. Uncertainty (95%) bounds are between 48.1 and 61.6.
Country: Republic of Kazakhstan , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.2 and 58.8. Uncertainty (95%) bounds are between 48 and 61.4.
Country: Republic of Kazakhstan , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.3 and 58.6. Uncertainty (95%) bounds are between 48.2 and 61.3.
Country: Republic of Kazakhstan , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.7 and 58.3. Uncertainty (95%) bounds are between 48.4 and 60.9.
Country: Republic of Kazakhstan , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 57.8. Uncertainty (95%) bounds are between 48.6 and 60.3.
Country: Republic of Kazakhstan , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 57.3. Uncertainty (95%) bounds are between 48.5 and 59.6.
Country: Republic of Kazakhstan , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 56.8. Uncertainty (95%) bounds are between 48.5 and 58.8.
Country: Republic of Kazakhstan , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 56.5. Uncertainty (95%) bounds are between 48.3 and 58.6.
Country: Republic of Kazakhstan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.8 and 57.3. Uncertainty (95%) bounds are between 47.5 and 59.8.
Country: Republic of Kazakhstan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.5 and 58.6. Uncertainty (95%) bounds are between 46.8 and 61.5.
Country: Republic of Kazakhstan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.4 and 59.9. Uncertainty (95%) bounds are between 46.1 and 63.3.
Country: Republic of Kazakhstan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 61.2. Uncertainty (95%) bounds are between 45.6 and 65.
Country: Republic of Moldova , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.5 and 83.7. Uncertainty (95%) bounds are between 46.6 and 88.6.
Country: Republic of Moldova , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.4 and 83.5. Uncertainty (95%) bounds are between 47.6 and 88.4.
Country: Republic of Moldova , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.7 and 83.2. Uncertainty (95%) bounds are between 48.3 and 88.1.
Country: Republic of Moldova , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 83. Uncertainty (95%) bounds are between 49 and 87.8.
Country: Republic of Moldova , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.1 and 82.7. Uncertainty (95%) bounds are between 49.7 and 87.5.
Country: Republic of Moldova , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 82.4. Uncertainty (95%) bounds are between 50.4 and 87.1.
Country: Republic of Moldova , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.2 and 82.2. Uncertainty (95%) bounds are between 51.1 and 86.8.
Country: Republic of Moldova , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.5 and 81.9. Uncertainty (95%) bounds are between 51.9 and 86.5.
Country: Republic of Moldova , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.9 and 81.5. Uncertainty (95%) bounds are between 52.7 and 86.1.
Country: Republic of Moldova , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.1 and 81.2. Uncertainty (95%) bounds are between 53.5 and 85.7.
Country: Republic of Moldova , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 81. Uncertainty (95%) bounds are between 54.3 and 85.4.
Country: Republic of Moldova , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 80.6. Uncertainty (95%) bounds are between 55.2 and 85.
Country: Republic of Moldova , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 80.2. Uncertainty (95%) bounds are between 56.1 and 84.4.
Country: Republic of Moldova , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 79.8. Uncertainty (95%) bounds are between 57 and 83.9.
Country: Republic of Moldova , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 79.4. Uncertainty (95%) bounds are between 57.9 and 83.3.
Country: Republic of Moldova , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 79. Uncertainty (95%) bounds are between 58.7 and 82.9.
Country: Republic of Moldova , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.5 and 78.5. Uncertainty (95%) bounds are between 59.6 and 82.2.
Country: Republic of Moldova , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.8 and 78. Uncertainty (95%) bounds are between 60.5 and 81.5.
Country: Republic of Moldova , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 77.5. Uncertainty (95%) bounds are between 61.4 and 80.9.
Country: Republic of Moldova , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.3 and 76.9. Uncertainty (95%) bounds are between 62.1 and 80.2.
Country: Republic of Moldova , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 76.4. Uncertainty (95%) bounds are between 62.7 and 79.7.
Country: Republic of Moldova , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.7 and 76.3. Uncertainty (95%) bounds are between 63 and 79.4.
Country: Republic of Moldova , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.2 and 76.2. Uncertainty (95%) bounds are between 63.1 and 79.2.
Country: Republic of Moldova , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.5 and 75.9. Uncertainty (95%) bounds are between 63.4 and 78.9.
Country: Republic of Moldova , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 75.7. Uncertainty (95%) bounds are between 63.5 and 78.4.
Country: Republic of Moldova , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.2 and 75.4. Uncertainty (95%) bounds are between 63.7 and 78.1.
Country: Republic of Moldova , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.6 and 75. Uncertainty (95%) bounds are between 63.9 and 77.4.
Country: Republic of Moldova , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 74.4. Uncertainty (95%) bounds are between 64 and 76.7.
Country: Republic of Moldova , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 73.7. Uncertainty (95%) bounds are between 63.7 and 76.
Country: Republic of Moldova , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 72.9. Uncertainty (95%) bounds are between 63.2 and 75.1.
Country: Republic of Moldova , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 72.2. Uncertainty (95%) bounds are between 62.9 and 74.2.
Country: Republic of Moldova , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.2 and 71.7. Uncertainty (95%) bounds are between 62.8 and 73.8.
Country: Republic of Moldova , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 71.3. Uncertainty (95%) bounds are between 62.8 and 73.4.
Country: Republic of Moldova , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 70.8. Uncertainty (95%) bounds are between 63 and 72.7.
Country: Republic of Moldova , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 70.1. Uncertainty (95%) bounds are between 63.3 and 71.8.
Country: Republic of Moldova , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 69.4. Uncertainty (95%) bounds are between 63.5 and 71.
Country: Republic of Moldova , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 69.4. Uncertainty (95%) bounds are between 62.4 and 71.1.
Country: Republic of Moldova , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 69.4. Uncertainty (95%) bounds are between 61.1 and 71.5.
Country: Republic of Moldova , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 69.3. Uncertainty (95%) bounds are between 59.9 and 71.7.
Country: Republic of Moldova , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 69.1. Uncertainty (95%) bounds are between 58.8 and 71.6.
Country: Republic of Moldova , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 68.7. Uncertainty (95%) bounds are between 57.9 and 71.3.
Country: Republic of Moldova , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 68.2. Uncertainty (95%) bounds are between 57.1 and 71.
Country: Republic of Moldova , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 67.7. Uncertainty (95%) bounds are between 56.4 and 70.5.
Country: Republic of Moldova , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.1 and 67.5. Uncertainty (95%) bounds are between 55.4 and 70.4.
Country: Republic of Moldova , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 67.3. Uncertainty (95%) bounds are between 54.5 and 70.4.
Country: Republic of Moldova , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 67.1. Uncertainty (95%) bounds are between 53.8 and 70.3.
Country: Republic of Moldova , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.3 and 66.8. Uncertainty (95%) bounds are between 53 and 70.1.
Country: Republic of Moldova , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 66.4. Uncertainty (95%) bounds are between 52.4 and 69.9.
Country: Republic of Moldova , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48 and 65.9. Uncertainty (95%) bounds are between 52 and 69.5.
Country: Republic of Moldova , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 65.5. Uncertainty (95%) bounds are between 51.6 and 69.2.
Country: Republic of Moldova , Year: 2020
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.3 and 65.5. Uncertainty (95%) bounds are between 51.3 and 69.
Country: Republic of Moldova , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.3 and 65.9. Uncertainty (95%) bounds are between 50.7 and 69.7.
Country: Republic of Moldova , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 66.6. Uncertainty (95%) bounds are between 50.1 and 70.5.
Country: Romania , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.9 and 72.2. Uncertainty (95%) bounds are between 37.5 and 79.2.
Country: Romania , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.3 and 71.9. Uncertainty (95%) bounds are between 38.6 and 78.5.
Country: Romania , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 71.5. Uncertainty (95%) bounds are between 39.4 and 77.9.
Country: Romania , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.1 and 71. Uncertainty (95%) bounds are between 40.6 and 77.3.
Country: Romania , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.5 and 70.7. Uncertainty (95%) bounds are between 41.7 and 76.8.
Country: Romania , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.2 and 70.4. Uncertainty (95%) bounds are between 42.8 and 76.2.
Country: Romania , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 70. Uncertainty (95%) bounds are between 43.9 and 75.6.
Country: Romania , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 69.7. Uncertainty (95%) bounds are between 45.2 and 75.1.
Country: Romania , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.7 and 69.6. Uncertainty (95%) bounds are between 46.1 and 74.5.
Country: Romania , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.8 and 69.7. Uncertainty (95%) bounds are between 46.9 and 74.3.
Country: Romania , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.6 and 70. Uncertainty (95%) bounds are between 47.8 and 74.7.
Country: Romania , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.6 and 70.2. Uncertainty (95%) bounds are between 48.7 and 74.9.
Country: Romania , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 70.5. Uncertainty (95%) bounds are between 49.5 and 75.
Country: Romania , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.5 and 70.7. Uncertainty (95%) bounds are between 50.3 and 75.
Country: Romania , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 70.9. Uncertainty (95%) bounds are between 51.2 and 75.1.
Country: Romania , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 71.1. Uncertainty (95%) bounds are between 52.3 and 75.2.
Country: Romania , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 71.4. Uncertainty (95%) bounds are between 53.3 and 75.
Country: Romania , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 71.5. Uncertainty (95%) bounds are between 54.4 and 75.
Country: Romania , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 71.4. Uncertainty (95%) bounds are between 55.5 and 74.8.
Country: Romania , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 71.3. Uncertainty (95%) bounds are between 56.3 and 74.5.
Country: Romania , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 71.1. Uncertainty (95%) bounds are between 57.1 and 74.2.
Country: Romania , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 71. Uncertainty (95%) bounds are between 57.3 and 74.
Country: Romania , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 70.9. Uncertainty (95%) bounds are between 57.4 and 73.9.
Country: Romania , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 70.8. Uncertainty (95%) bounds are between 57.5 and 73.9.
Country: Romania , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 71.2. Uncertainty (95%) bounds are between 57.7 and 74.2.
Country: Romania , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 71.5. Uncertainty (95%) bounds are between 57.9 and 74.6.
Country: Romania , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 71.9. Uncertainty (95%) bounds are between 58.3 and 75.
Country: Romania , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 72.1. Uncertainty (95%) bounds are between 58.9 and 75.3.
Country: Romania , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 72.5. Uncertainty (95%) bounds are between 59.4 and 75.6.
Country: Romania , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 72.8. Uncertainty (95%) bounds are between 60 and 75.8.
Country: Romania , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 73.1. Uncertainty (95%) bounds are between 60.5 and 76.2.
Country: Romania , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 73.5. Uncertainty (95%) bounds are between 61 and 76.6.
Country: Romania , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 74. Uncertainty (95%) bounds are between 61.6 and 76.9.
Country: Romania , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 74.4. Uncertainty (95%) bounds are between 62.2 and 77.2.
Country: Romania , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 74.8. Uncertainty (95%) bounds are between 62.7 and 77.6.
Country: Romania , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 75.4. Uncertainty (95%) bounds are between 62.7 and 78.3.
Country: Romania , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 76.1. Uncertainty (95%) bounds are between 62.4 and 79.2.
Country: Romania , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.3 and 76.7. Uncertainty (95%) bounds are between 62 and 80.
Country: Romania , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.4 and 77.3. Uncertainty (95%) bounds are between 61.4 and 80.7.
Country: Romania , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 77.9. Uncertainty (95%) bounds are between 60.8 and 81.6.
Country: Romania , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 78.4. Uncertainty (95%) bounds are between 60.2 and 82.3.
Country: Romania , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 79. Uncertainty (95%) bounds are between 59.7 and 83.
Country: Romania , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 79.6. Uncertainty (95%) bounds are between 59.2 and 83.6.
Country: Romania , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 80. Uncertainty (95%) bounds are between 58.8 and 84.3.
Country: Romania , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.4 and 80.5. Uncertainty (95%) bounds are between 58.3 and 84.7.
Country: Romania , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.7 and 80.9. Uncertainty (95%) bounds are between 57.8 and 85.1.
Country: Romania , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 81.3. Uncertainty (95%) bounds are between 57.5 and 85.7.
Country: Romania , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.5 and 81.6. Uncertainty (95%) bounds are between 57.1 and 86.1.
Country: Romania , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 81.9. Uncertainty (95%) bounds are between 56.7 and 86.6.
Country: Romania , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 82.2. Uncertainty (95%) bounds are between 56.4 and 87.
Country: Romania , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.8 and 82.5. Uncertainty (95%) bounds are between 56 and 87.4.
Country: Romania , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 82.8. Uncertainty (95%) bounds are between 55.9 and 87.7.
Country: Romania , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 83.1. Uncertainty (95%) bounds are between 55.5 and 88.1.
Country: Russian Federation , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.3 and 79.5. Uncertainty (95%) bounds are between 39.3 and 85.6.
Country: Russian Federation , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.2 and 79.3. Uncertainty (95%) bounds are between 40.3 and 85.2.
Country: Russian Federation , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.5 and 79. Uncertainty (95%) bounds are between 41.3 and 84.9.
Country: Russian Federation , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 78.7. Uncertainty (95%) bounds are between 42 and 84.6.
Country: Russian Federation , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.1 and 78.4. Uncertainty (95%) bounds are between 42.9 and 84.2.
Country: Russian Federation , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.3 and 78.1. Uncertainty (95%) bounds are between 43.8 and 83.8.
Country: Russian Federation , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.5 and 77.8. Uncertainty (95%) bounds are between 44.7 and 83.2.
Country: Russian Federation , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 77.3. Uncertainty (95%) bounds are between 45.7 and 82.8.
Country: Russian Federation , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.6 and 77. Uncertainty (95%) bounds are between 46.5 and 82.4.
Country: Russian Federation , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 76.6. Uncertainty (95%) bounds are between 47.6 and 81.9.
Country: Russian Federation , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.3 and 76.3. Uncertainty (95%) bounds are between 48.8 and 81.4.
Country: Russian Federation , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.7 and 75.8. Uncertainty (95%) bounds are between 49.8 and 80.8.
Country: Russian Federation , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.3 and 75.3. Uncertainty (95%) bounds are between 50.7 and 80.2.
Country: Russian Federation , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 74.8. Uncertainty (95%) bounds are between 51.8 and 79.5.
Country: Russian Federation , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 74.3. Uncertainty (95%) bounds are between 52.8 and 78.9.
Country: Russian Federation , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.2 and 73.7. Uncertainty (95%) bounds are between 53.8 and 78.
Country: Russian Federation , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.8 and 73.1. Uncertainty (95%) bounds are between 54.9 and 77.
Country: Russian Federation , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.2 and 72.4. Uncertainty (95%) bounds are between 56.1 and 75.9.
Country: Russian Federation , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 71.6. Uncertainty (95%) bounds are between 57.2 and 74.7.
Country: Russian Federation , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.5 and 70.8. Uncertainty (95%) bounds are between 58.3 and 73.5.
Country: Russian Federation , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.2 and 69.8. Uncertainty (95%) bounds are between 59.3 and 72.2.
Country: Russian Federation , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 68.7. Uncertainty (95%) bounds are between 59.7 and 70.9.
Country: Russian Federation , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 67.9. Uncertainty (95%) bounds are between 60.2 and 69.7.
Country: Russian Federation , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 67.5. Uncertainty (95%) bounds are between 60.7 and 69.3.
Country: Russian Federation , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 67.4. Uncertainty (95%) bounds are between 61.2 and 69.1.
Country: Russian Federation , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 67.3. Uncertainty (95%) bounds are between 61.2 and 68.9.
Country: Russian Federation , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 67.7. Uncertainty (95%) bounds are between 61.1 and 69.4.
Country: Russian Federation , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 68.5. Uncertainty (95%) bounds are between 60.6 and 70.4.
Country: Russian Federation , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 69.4. Uncertainty (95%) bounds are between 60.3 and 71.6.
Country: Russian Federation , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 70.1. Uncertainty (95%) bounds are between 60.2 and 72.5.
Country: Russian Federation , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 70.7. Uncertainty (95%) bounds are between 60.2 and 73.2.
Country: Russian Federation , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 71.1. Uncertainty (95%) bounds are between 60.5 and 73.7.
Country: Russian Federation , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 71.3. Uncertainty (95%) bounds are between 61 and 73.9.
Country: Russian Federation , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 71.4. Uncertainty (95%) bounds are between 61.5 and 73.9.
Country: Russian Federation , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 71.4. Uncertainty (95%) bounds are between 62 and 73.7.
Country: Russian Federation , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 71.3. Uncertainty (95%) bounds are between 62.1 and 73.6.
Country: Russian Federation , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 71.1. Uncertainty (95%) bounds are between 62.2 and 73.3.
Country: Russian Federation , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 70.8. Uncertainty (95%) bounds are between 62.3 and 73.
Country: Russian Federation , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 70.7. Uncertainty (95%) bounds are between 62.2 and 72.7.
Country: Russian Federation , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 70.5. Uncertainty (95%) bounds are between 62.3 and 72.5.
Country: Russian Federation , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 70.4. Uncertainty (95%) bounds are between 62.4 and 72.5.
Country: Russian Federation , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 70.8. Uncertainty (95%) bounds are between 62.2 and 73.1.
Country: Russian Federation , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 71.6. Uncertainty (95%) bounds are between 61.5 and 74.
Country: Russian Federation , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 72.4. Uncertainty (95%) bounds are between 60.6 and 75.2.
Country: Russian Federation , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.8 and 73.3. Uncertainty (95%) bounds are between 59.8 and 76.4.
Country: Russian Federation , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 74.1. Uncertainty (95%) bounds are between 59.1 and 77.5.
Country: Russian Federation , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 74.9. Uncertainty (95%) bounds are between 58.4 and 78.4.
Country: Russian Federation , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 75.5. Uncertainty (95%) bounds are between 57.7 and 79.3.
Country: Russian Federation , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.7 and 76.1. Uncertainty (95%) bounds are between 57.1 and 80.1.
Country: Russian Federation , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 76.7. Uncertainty (95%) bounds are between 56.6 and 81.
Country: Russian Federation , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 77.2. Uncertainty (95%) bounds are between 56 and 81.7.
Country: Russian Federation , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.9 and 77.7. Uncertainty (95%) bounds are between 55.6 and 82.4.
Country: Russian Federation , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 78.2. Uncertainty (95%) bounds are between 55.1 and 82.9.
Country: Serbia , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 63.4. Uncertainty (95%) bounds are between 40.1 and 69.1.
Country: Serbia , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.4 and 63.7. Uncertainty (95%) bounds are between 40.9 and 69.5.
Country: Serbia , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.9 and 64.4. Uncertainty (95%) bounds are between 41.5 and 70.
Country: Serbia , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.3 and 65.2. Uncertainty (95%) bounds are between 42.2 and 70.7.
Country: Serbia , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.8 and 65.9. Uncertainty (95%) bounds are between 42.9 and 71.3.
Country: Serbia , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.5 and 66.7. Uncertainty (95%) bounds are between 43.5 and 72.1.
Country: Serbia , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 67.4. Uncertainty (95%) bounds are between 44.2 and 72.8.
Country: Serbia , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 68. Uncertainty (95%) bounds are between 44.9 and 73.4.
Country: Serbia , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 68.8. Uncertainty (95%) bounds are between 45.8 and 73.9.
Country: Serbia , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 69.4. Uncertainty (95%) bounds are between 46.6 and 74.2.
Country: Serbia , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.5 and 70. Uncertainty (95%) bounds are between 47.4 and 74.7.
Country: Serbia , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.4 and 70.5. Uncertainty (95%) bounds are between 48.3 and 75.1.
Country: Serbia , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 71. Uncertainty (95%) bounds are between 49.3 and 75.4.
Country: Serbia , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 71.4. Uncertainty (95%) bounds are between 50.4 and 75.8.
Country: Serbia , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.7 and 71.7. Uncertainty (95%) bounds are between 51.5 and 76.
Country: Serbia , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 72. Uncertainty (95%) bounds are between 52.5 and 76.1.
Country: Serbia , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 72.3. Uncertainty (95%) bounds are between 53.6 and 76.1.
Country: Serbia , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 72.5. Uncertainty (95%) bounds are between 54.8 and 76.2.
Country: Serbia , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 72.6. Uncertainty (95%) bounds are between 55.9 and 76.2.
Country: Serbia , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 72.6. Uncertainty (95%) bounds are between 56.8 and 76.2.
Country: Serbia , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 72.7. Uncertainty (95%) bounds are between 57.6 and 76.
Country: Serbia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 72.9. Uncertainty (95%) bounds are between 57.8 and 76.1.
Country: Serbia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 73. Uncertainty (95%) bounds are between 57.7 and 76.4.
Country: Serbia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 73.2. Uncertainty (95%) bounds are between 57.6 and 76.6.
Country: Serbia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 73.1. Uncertainty (95%) bounds are between 57.5 and 76.6.
Country: Serbia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 73. Uncertainty (95%) bounds are between 57.3 and 76.5.
Country: Serbia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 72.8. Uncertainty (95%) bounds are between 57.2 and 76.4.
Country: Serbia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 72.4. Uncertainty (95%) bounds are between 57.1 and 76.
Country: Serbia , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 72.1. Uncertainty (95%) bounds are between 57.1 and 75.7.
Country: Serbia , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 71.6. Uncertainty (95%) bounds are between 56.9 and 75.2.
Country: Serbia , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 70.9. Uncertainty (95%) bounds are between 56.6 and 74.6.
Country: Serbia , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 70.1. Uncertainty (95%) bounds are between 55.7 and 73.7.
Country: Serbia , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 69.2. Uncertainty (95%) bounds are between 54.6 and 72.7.
Country: Serbia , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.6 and 68.1. Uncertainty (95%) bounds are between 53.4 and 71.7.
Country: Serbia , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 67. Uncertainty (95%) bounds are between 52.4 and 70.7.
Country: Serbia , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 66. Uncertainty (95%) bounds are between 51.6 and 69.7.
Country: Serbia , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.3 and 65.5. Uncertainty (95%) bounds are between 51.1 and 69.1.
Country: Serbia , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.1 and 65.1. Uncertainty (95%) bounds are between 50.9 and 68.6.
Country: Serbia , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.1 and 64.9. Uncertainty (95%) bounds are between 50.9 and 68.3.
Country: Serbia , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.3 and 64.6. Uncertainty (95%) bounds are between 51 and 67.9.
Country: Serbia , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 64.3. Uncertainty (95%) bounds are between 51 and 67.6.
Country: Serbia , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 63.9. Uncertainty (95%) bounds are between 50.8 and 67.3.
Country: Serbia , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.1 and 63.6. Uncertainty (95%) bounds are between 50.5 and 66.8.
Country: Serbia , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 63.3. Uncertainty (95%) bounds are between 50.2 and 66.6.
Country: Serbia , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 63. Uncertainty (95%) bounds are between 50.1 and 66.4.
Country: Serbia , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 63.3. Uncertainty (95%) bounds are between 50 and 66.6.
Country: Serbia , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.3 and 63.7. Uncertainty (95%) bounds are between 49.9 and 67.2.
Country: Serbia , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 64. Uncertainty (95%) bounds are between 49.8 and 67.6.
Country: Serbia , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 64.5. Uncertainty (95%) bounds are between 49.9 and 68.
Country: Serbia , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 65. Uncertainty (95%) bounds are between 49.9 and 68.7.
Country: Serbia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.2 and 65.7. Uncertainty (95%) bounds are between 49.4 and 69.7.
Country: Serbia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.3 and 66.5. Uncertainty (95%) bounds are between 49.1 and 70.8.
Country: Serbia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 67.2. Uncertainty (95%) bounds are between 48.5 and 71.8.
Country: Slovakia , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 84.2. Uncertainty (95%) bounds are between 48.3 and 88.9.
Country: Slovakia , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.8 and 84. Uncertainty (95%) bounds are between 49.1 and 88.6.
Country: Slovakia , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.2 and 83.7. Uncertainty (95%) bounds are between 49.9 and 88.4.
Country: Slovakia , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 83.4. Uncertainty (95%) bounds are between 50.8 and 88.
Country: Slovakia , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.4 and 83.1. Uncertainty (95%) bounds are between 51.7 and 87.7.
Country: Slovakia , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 82.8. Uncertainty (95%) bounds are between 52.5 and 87.3.
Country: Slovakia , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.2 and 82.6. Uncertainty (95%) bounds are between 53.3 and 87.1.
Country: Slovakia , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.4 and 82.3. Uncertainty (95%) bounds are between 54.2 and 86.6.
Country: Slovakia , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 44.7 and 81.9. Uncertainty (95%) bounds are between 55 and 86.3.
Country: Slovakia , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.2 and 81.6. Uncertainty (95%) bounds are between 55.7 and 85.9.
Country: Slovakia , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.8 and 81.3. Uncertainty (95%) bounds are between 56.6 and 85.6.
Country: Slovakia , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 80.9. Uncertainty (95%) bounds are between 57.4 and 85.
Country: Slovakia , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 80.6. Uncertainty (95%) bounds are between 58.3 and 84.4.
Country: Slovakia , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 80.2. Uncertainty (95%) bounds are between 59.4 and 83.9.
Country: Slovakia , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 54 and 79.7. Uncertainty (95%) bounds are between 60.4 and 83.4.
Country: Slovakia , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.3 and 79.2. Uncertainty (95%) bounds are between 61.3 and 82.8.
Country: Slovakia , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 78.7. Uncertainty (95%) bounds are between 62.3 and 82.1.
Country: Slovakia , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 78.2. Uncertainty (95%) bounds are between 63.4 and 81.4.
Country: Slovakia , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.2 and 77.7. Uncertainty (95%) bounds are between 64.5 and 80.7.
Country: Slovakia , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.7 and 77.3. Uncertainty (95%) bounds are between 65.5 and 79.9.
Country: Slovakia , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.2 and 77.1. Uncertainty (95%) bounds are between 66.5 and 79.5.
Country: Slovakia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 77.3. Uncertainty (95%) bounds are between 67.2 and 79.7.
Country: Slovakia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 78.2. Uncertainty (95%) bounds are between 67.8 and 80.5.
Country: Slovakia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 79.2. Uncertainty (95%) bounds are between 68.3 and 81.6.
Country: Slovakia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 80.3. Uncertainty (95%) bounds are between 68.8 and 82.7.
Country: Slovakia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 81.3. Uncertainty (95%) bounds are between 69.3 and 83.7.
Country: Slovakia , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 82.1. Uncertainty (95%) bounds are between 69.7 and 84.6.
Country: Slovakia , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 82.9. Uncertainty (95%) bounds are between 70 and 85.4.
Country: Slovakia , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.1 and 83.5. Uncertainty (95%) bounds are between 69.9 and 86.1.
Country: Slovakia , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.4 and 84. Uncertainty (95%) bounds are between 69.5 and 86.7.
Country: Slovakia , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.8 and 84.5. Uncertainty (95%) bounds are between 69.1 and 87.3.
Country: Slovakia , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.9 and 84.9. Uncertainty (95%) bounds are between 68.5 and 87.8.
Country: Slovakia , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 62 and 85.3. Uncertainty (95%) bounds are between 68 and 88.2.
Country: Slovakia , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.3 and 85.7. Uncertainty (95%) bounds are between 67.7 and 88.7.
Country: Slovakia , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 86. Uncertainty (95%) bounds are between 67.3 and 89.1.
Country: Slovakia , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.9 and 86.3. Uncertainty (95%) bounds are between 67 and 89.4.
Country: Slovakia , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 86.6. Uncertainty (95%) bounds are between 66.4 and 89.8.
Country: Slovakia , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 86.8. Uncertainty (95%) bounds are between 66 and 90.1.
Country: Slovakia , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.7 and 87.1. Uncertainty (95%) bounds are between 65.6 and 90.4.
Country: Slovakia , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 87.4. Uncertainty (95%) bounds are between 65.2 and 90.6.
Country: Slovakia , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 87.6. Uncertainty (95%) bounds are between 64.9 and 91.
Country: Slovakia , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 87.8. Uncertainty (95%) bounds are between 64.5 and 91.2.
Country: Slovakia , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 88. Uncertainty (95%) bounds are between 64.1 and 91.5.
Country: Slovakia , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 88.2. Uncertainty (95%) bounds are between 63.9 and 91.7.
Country: Slovakia , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 54 and 88.4. Uncertainty (95%) bounds are between 63.5 and 91.9.
Country: Slovakia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 88.6. Uncertainty (95%) bounds are between 63.2 and 92.1.
Country: Slovakia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 88.9. Uncertainty (95%) bounds are between 62.9 and 92.4.
Country: Slovakia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 89.1. Uncertainty (95%) bounds are between 62.4 and 92.6.
Country: Slovakia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 89.2. Uncertainty (95%) bounds are between 62.2 and 92.8.
Country: Slovakia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.7 and 89.4. Uncertainty (95%) bounds are between 62 and 93.
Country: Slovakia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 89.5. Uncertainty (95%) bounds are between 61.7 and 93.2.
Country: Slovakia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 89.7. Uncertainty (95%) bounds are between 61.4 and 93.3.
Country: Slovakia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.4 and 89.8. Uncertainty (95%) bounds are between 61 and 93.5.
Country: Slovenia , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 77.1. Uncertainty (95%) bounds are between 58.6 and 81.1.
Country: Slovenia , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 77.2. Uncertainty (95%) bounds are between 59.1 and 81.2.
Country: Slovenia , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 77.5. Uncertainty (95%) bounds are between 59.4 and 81.6.
Country: Slovenia , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 77.8. Uncertainty (95%) bounds are between 59.6 and 81.9.
Country: Slovenia , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 78.2. Uncertainty (95%) bounds are between 59.8 and 82.2.
Country: Slovenia , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 78.6. Uncertainty (95%) bounds are between 60.1 and 82.5.
Country: Slovenia , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 78.9. Uncertainty (95%) bounds are between 60.3 and 82.8.
Country: Slovenia , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 79.2. Uncertainty (95%) bounds are between 60.5 and 83.1.
Country: Slovenia , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 79.5. Uncertainty (95%) bounds are between 60.8 and 83.3.
Country: Slovenia , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 79.8. Uncertainty (95%) bounds are between 61.2 and 83.5.
Country: Slovenia , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.7 and 79.9. Uncertainty (95%) bounds are between 61.7 and 83.7.
Country: Slovenia , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 80.1. Uncertainty (95%) bounds are between 62.1 and 83.8.
Country: Slovenia , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 80.3. Uncertainty (95%) bounds are between 62.5 and 83.9.
Country: Slovenia , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 80.4. Uncertainty (95%) bounds are between 63.1 and 84.
Country: Slovenia , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 80.4. Uncertainty (95%) bounds are between 63.7 and 84.
Country: Slovenia , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 80.5. Uncertainty (95%) bounds are between 64.4 and 83.9.
Country: Slovenia , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.1 and 80.6. Uncertainty (95%) bounds are between 65.1 and 83.7.
Country: Slovenia , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 80.5. Uncertainty (95%) bounds are between 65.8 and 83.6.
Country: Slovenia , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 80.5. Uncertainty (95%) bounds are between 66.6 and 83.5.
Country: Slovenia , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 80.5. Uncertainty (95%) bounds are between 67.5 and 83.5.
Country: Slovenia , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.5 and 80.8. Uncertainty (95%) bounds are between 68.3 and 83.6.
Country: Slovenia , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 81.4. Uncertainty (95%) bounds are between 69 and 84.
Country: Slovenia , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 82. Uncertainty (95%) bounds are between 69.7 and 84.7.
Country: Slovenia , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.5 and 82.7. Uncertainty (95%) bounds are between 70.3 and 85.3.
Country: Slovenia , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67 and 83.3. Uncertainty (95%) bounds are between 70.9 and 86.
Country: Slovenia , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 83.9. Uncertainty (95%) bounds are between 71.2 and 86.5.
Country: Slovenia , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.8 and 84.5. Uncertainty (95%) bounds are between 71.1 and 87.
Country: Slovenia , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.1 and 84.9. Uncertainty (95%) bounds are between 70.7 and 87.6.
Country: Slovenia , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.2 and 85.4. Uncertainty (95%) bounds are between 70.3 and 88.2.
Country: Slovenia , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.4 and 85.7. Uncertainty (95%) bounds are between 69.8 and 88.6.
Country: Slovenia , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 86.1. Uncertainty (95%) bounds are between 69.3 and 88.9.
Country: Slovenia , Year: 2001
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.8 and 86.4. Uncertainty (95%) bounds are between 68.8 and 89.3.
Country: Slovenia , Year: 2002
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 86.7. Uncertainty (95%) bounds are between 68.2 and 89.8.
Country: Slovenia , Year: 2003
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 87. Uncertainty (95%) bounds are between 67.8 and 90.1.
Country: Slovenia , Year: 2004
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.1 and 87.2. Uncertainty (95%) bounds are between 67.3 and 90.3.
Country: Slovenia , Year: 2005
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 87.5. Uncertainty (95%) bounds are between 66.9 and 90.7.
Country: Slovenia , Year: 2006
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.7 and 87.7. Uncertainty (95%) bounds are between 66.5 and 90.9.
Country: Slovenia , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 87.9. Uncertainty (95%) bounds are between 66.2 and 91.3.
Country: Slovenia , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.6 and 88.1. Uncertainty (95%) bounds are between 65.7 and 91.6.
Country: Slovenia , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 88.4. Uncertainty (95%) bounds are between 65.3 and 91.8.
Country: Slovenia , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.4 and 88.5. Uncertainty (95%) bounds are between 64.9 and 92.
Country: Slovenia , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 88.7. Uncertainty (95%) bounds are between 64.5 and 92.2.
Country: Slovenia , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.1 and 88.9. Uncertainty (95%) bounds are between 64.1 and 92.4.
Country: Slovenia , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 89.1. Uncertainty (95%) bounds are between 63.7 and 92.6.
Country: Slovenia , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.1 and 89.2. Uncertainty (95%) bounds are between 63.5 and 92.8.
Country: Slovenia , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 89.4. Uncertainty (95%) bounds are between 63.3 and 92.9.
Country: Slovenia , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 89.5. Uncertainty (95%) bounds are between 63.1 and 93.1.
Country: Slovenia , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 89.7. Uncertainty (95%) bounds are between 62.7 and 93.3.
Country: Slovenia , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 89.9. Uncertainty (95%) bounds are between 62.4 and 93.4.
Country: Slovenia , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 52 and 90.1. Uncertainty (95%) bounds are between 62.1 and 93.5.
Country: Slovenia , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 90.2. Uncertainty (95%) bounds are between 61.8 and 93.7.
Country: Slovenia , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 90.4. Uncertainty (95%) bounds are between 61.5 and 93.8.
Country: Slovenia , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.6 and 90.5. Uncertainty (95%) bounds are between 61.3 and 93.9.
Country: Spain , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.4 and 62.9. Uncertainty (95%) bounds are between 34.3 and 69.8.
Country: Spain , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.5 and 62.4. Uncertainty (95%) bounds are between 35.2 and 69.1.
Country: Spain , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.8 and 61.9. Uncertainty (95%) bounds are between 36.2 and 68.4.
Country: Spain , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.4 and 61.5. Uncertainty (95%) bounds are between 37.3 and 67.7.
Country: Spain , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 32.8 and 61.1. Uncertainty (95%) bounds are between 38.4 and 67.
Country: Spain , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.4 and 60.8. Uncertainty (95%) bounds are between 39.5 and 66.2.
Country: Spain , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 60.6. Uncertainty (95%) bounds are between 40.8 and 65.6.
Country: Spain , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.6 and 60.5. Uncertainty (95%) bounds are between 42.2 and 65.4.
Country: Spain , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 61.1. Uncertainty (95%) bounds are between 43.7 and 65.6.
Country: Spain , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.2 and 62. Uncertainty (95%) bounds are between 45.4 and 66.2.
Country: Spain , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 62.9. Uncertainty (95%) bounds are between 47.2 and 67.
Country: Spain , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.4 and 63.8. Uncertainty (95%) bounds are between 49.1 and 67.5.
Country: Spain , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.8 and 64.7. Uncertainty (95%) bounds are between 51.2 and 68.1.
Country: Spain , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 65.4. Uncertainty (95%) bounds are between 53.4 and 68.6.
Country: Spain , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 66.1. Uncertainty (95%) bounds are between 55.5 and 69.
Country: Spain , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 67.1. Uncertainty (95%) bounds are between 57.6 and 69.6.
Country: Spain , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 68.4. Uncertainty (95%) bounds are between 59 and 70.9.
Country: Spain , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 70. Uncertainty (95%) bounds are between 60.3 and 72.4.
Country: Spain , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 71.4. Uncertainty (95%) bounds are between 61.5 and 73.8.
Country: Spain , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 72.7. Uncertainty (95%) bounds are between 62.8 and 75.
Country: Spain , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 73.8. Uncertainty (95%) bounds are between 64.1 and 76.1.
Country: Spain , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 74.9. Uncertainty (95%) bounds are between 65.1 and 77.2.
Country: Spain , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 75.9. Uncertainty (95%) bounds are between 66.2 and 78.1.
Country: Spain , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 76.6. Uncertainty (95%) bounds are between 67.2 and 78.9.
Country: Spain , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 77.1. Uncertainty (95%) bounds are between 68.1 and 79.3.
Country: Spain , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 77.4. Uncertainty (95%) bounds are between 68.8 and 79.3.
Country: Spain , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 77.1. Uncertainty (95%) bounds are between 69.1 and 79.
Country: Spain , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 76.6. Uncertainty (95%) bounds are between 69.2 and 78.3.
Country: Spain , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.4 and 75.9. Uncertainty (95%) bounds are between 69.3 and 77.5.
Country: Spain , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 75.1. Uncertainty (95%) bounds are between 69.2 and 76.6.
Country: Spain , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 74.8. Uncertainty (95%) bounds are between 68.3 and 76.5.
Country: Spain , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 74.6. Uncertainty (95%) bounds are between 67.3 and 76.4.
Country: Spain , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 74.2. Uncertainty (95%) bounds are between 66.4 and 76.1.
Country: Spain , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 73.6. Uncertainty (95%) bounds are between 65.7 and 75.5.
Country: Spain , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 72.8. Uncertainty (95%) bounds are between 65.4 and 74.6.
Country: Spain , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 72. Uncertainty (95%) bounds are between 65.3 and 73.6.
Country: Spain , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 71.3. Uncertainty (95%) bounds are between 65.6 and 72.7.
Country: Spain , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 71.5. Uncertainty (95%) bounds are between 65.9 and 72.8.
Country: Spain , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 71.7. Uncertainty (95%) bounds are between 66.2 and 73.1.
Country: Spain , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 71.9. Uncertainty (95%) bounds are between 65.8 and 73.4.
Country: Spain , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 72. Uncertainty (95%) bounds are between 65 and 73.7.
Country: Spain , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 71.8. Uncertainty (95%) bounds are between 64.1 and 73.7.
Country: Spain , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 71.3. Uncertainty (95%) bounds are between 63.3 and 73.3.
Country: Spain , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 70.6. Uncertainty (95%) bounds are between 62.6 and 72.6.
Country: Spain , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 69.9. Uncertainty (95%) bounds are between 62 and 71.7.
Country: Spain , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 69.2. Uncertainty (95%) bounds are between 61.3 and 71.1.
Country: Spain , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 68.3. Uncertainty (95%) bounds are between 60.8 and 70.2.
Country: Spain , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 67.6. Uncertainty (95%) bounds are between 60.3 and 69.4.
Country: Spain , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 67.1. Uncertainty (95%) bounds are between 60.1 and 68.8.
Country: Spain , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 67.5. Uncertainty (95%) bounds are between 59.2 and 69.6.
Country: Spain , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 68.4. Uncertainty (95%) bounds are between 58.1 and 70.9.
Country: Spain , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 69.4. Uncertainty (95%) bounds are between 57.1 and 72.3.
Country: Spain , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 70.3. Uncertainty (95%) bounds are between 56.2 and 73.6.
Country: Sweden , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 84.3. Uncertainty (95%) bounds are between 59.1 and 88.2.
Country: Sweden , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 84. Uncertainty (95%) bounds are between 59.8 and 87.9.
Country: Sweden , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.5 and 83.7. Uncertainty (95%) bounds are between 60.5 and 87.4.
Country: Sweden , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 83.4. Uncertainty (95%) bounds are between 61.4 and 87.1.
Country: Sweden , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.2 and 83. Uncertainty (95%) bounds are between 62.2 and 86.6.
Country: Sweden , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 82.7. Uncertainty (95%) bounds are between 62.9 and 86.1.
Country: Sweden , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 82.3. Uncertainty (95%) bounds are between 63.7 and 85.5.
Country: Sweden , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 81.9. Uncertainty (95%) bounds are between 64.5 and 85.
Country: Sweden , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.5 and 81.4. Uncertainty (95%) bounds are between 65.2 and 84.4.
Country: Sweden , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.6 and 81. Uncertainty (95%) bounds are between 65.9 and 83.9.
Country: Sweden , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 80.6. Uncertainty (95%) bounds are between 66.5 and 83.3.
Country: Sweden , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 80.2. Uncertainty (95%) bounds are between 67 and 82.8.
Country: Sweden , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 79.9. Uncertainty (95%) bounds are between 67 and 82.4.
Country: Sweden , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 79.7. Uncertainty (95%) bounds are between 66.8 and 82.3.
Country: Sweden , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 79.4. Uncertainty (95%) bounds are between 66.5 and 82.1.
Country: Sweden , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 79.2. Uncertainty (95%) bounds are between 66.3 and 81.7.
Country: Sweden , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 78.9. Uncertainty (95%) bounds are between 66.1 and 81.5.
Country: Sweden , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 78.4. Uncertainty (95%) bounds are between 66 and 81.
Country: Sweden , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 77.9. Uncertainty (95%) bounds are between 65.9 and 80.4.
Country: Sweden , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 77.4. Uncertainty (95%) bounds are between 65.9 and 79.9.
Country: Sweden , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 77. Uncertainty (95%) bounds are between 66 and 79.4.
Country: Sweden , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 76.8. Uncertainty (95%) bounds are between 66 and 79.1.
Country: Sweden , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 76.6. Uncertainty (95%) bounds are between 66 and 78.9.
Country: Sweden , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 76.2. Uncertainty (95%) bounds are between 66 and 78.5.
Country: Sweden , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 75.9. Uncertainty (95%) bounds are between 66 and 78.
Country: Sweden , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 75.4. Uncertainty (95%) bounds are between 66.2 and 77.3.
Country: Sweden , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 75.2. Uncertainty (95%) bounds are between 66.2 and 77.
Country: Sweden , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 75.5. Uncertainty (95%) bounds are between 65.9 and 77.4.
Country: Sweden , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 76. Uncertainty (95%) bounds are between 65.2 and 78.1.
Country: Sweden , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 76.4. Uncertainty (95%) bounds are between 64.7 and 78.9.
Country: Sweden , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 76.8. Uncertainty (95%) bounds are between 64.2 and 79.5.
Country: Sweden , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 77.1. Uncertainty (95%) bounds are between 63.8 and 80.
Country: Sweden , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 77.4. Uncertainty (95%) bounds are between 63.5 and 80.2.
Country: Sweden , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 77.6. Uncertainty (95%) bounds are between 63.3 and 80.5.
Country: Sweden , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 77.7. Uncertainty (95%) bounds are between 63.1 and 80.7.
Country: Sweden , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 77.7. Uncertainty (95%) bounds are between 63.1 and 80.7.
Country: Sweden , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 77.6. Uncertainty (95%) bounds are between 63.1 and 80.6.
Country: Sweden , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 77.6. Uncertainty (95%) bounds are between 63.3 and 80.6.
Country: Sweden , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 77.4. Uncertainty (95%) bounds are between 63.4 and 80.3.
Country: Sweden , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 77.2. Uncertainty (95%) bounds are between 63.7 and 80.1.
Country: Sweden , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 76.9. Uncertainty (95%) bounds are between 63.9 and 79.7.
Country: Sweden , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 76.6. Uncertainty (95%) bounds are between 64.3 and 79.3.
Country: Sweden , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 76.3. Uncertainty (95%) bounds are between 64.6 and 78.8.
Country: Sweden , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 76. Uncertainty (95%) bounds are between 64.7 and 78.6.
Country: Sweden , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 76. Uncertainty (95%) bounds are between 64.5 and 78.7.
Country: Sweden , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 76. Uncertainty (95%) bounds are between 64.3 and 78.7.
Country: Sweden , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.5 and 75.9. Uncertainty (95%) bounds are between 64.1 and 78.6.
Country: Sweden , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 75.9. Uncertainty (95%) bounds are between 64.1 and 78.5.
Country: Sweden , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.6 and 76.2. Uncertainty (95%) bounds are between 63.6 and 79.
Country: Sweden , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.8 and 76.8. Uncertainty (95%) bounds are between 63 and 79.7.
Country: Sweden , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.5 and 77.3. Uncertainty (95%) bounds are between 62.2 and 80.5.
Country: Sweden , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.3 and 77.9. Uncertainty (95%) bounds are between 61.5 and 81.2.
Country: Sweden , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 78.4. Uncertainty (95%) bounds are between 60.8 and 82.1.
Country: Switzerland , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 82.7. Uncertainty (95%) bounds are between 54.4 and 87.
Country: Switzerland , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 82.4. Uncertainty (95%) bounds are between 55.3 and 86.6.
Country: Switzerland , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 82. Uncertainty (95%) bounds are between 56.2 and 86.2.
Country: Switzerland , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 81.6. Uncertainty (95%) bounds are between 56.9 and 85.8.
Country: Switzerland , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 81.3. Uncertainty (95%) bounds are between 57.8 and 85.4.
Country: Switzerland , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 80.9. Uncertainty (95%) bounds are between 58.8 and 84.8.
Country: Switzerland , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 80.5. Uncertainty (95%) bounds are between 59.6 and 84.3.
Country: Switzerland , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 80.1. Uncertainty (95%) bounds are between 60.4 and 83.7.
Country: Switzerland , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 79.7. Uncertainty (95%) bounds are between 61.3 and 83.2.
Country: Switzerland , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 79.3. Uncertainty (95%) bounds are between 62.1 and 82.7.
Country: Switzerland , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 79. Uncertainty (95%) bounds are between 62.9 and 82.3.
Country: Switzerland , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 79. Uncertainty (95%) bounds are between 63.4 and 82.3.
Country: Switzerland , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 79. Uncertainty (95%) bounds are between 63.7 and 82.1.
Country: Switzerland , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 79.1. Uncertainty (95%) bounds are between 64 and 82.1.
Country: Switzerland , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 79.1. Uncertainty (95%) bounds are between 64.6 and 82.1.
Country: Switzerland , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 79.1. Uncertainty (95%) bounds are between 65 and 82.1.
Country: Switzerland , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 79.1. Uncertainty (95%) bounds are between 65.5 and 82.
Country: Switzerland , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 79.1. Uncertainty (95%) bounds are between 66 and 82.
Country: Switzerland , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.9 and 79. Uncertainty (95%) bounds are between 66.6 and 81.8.
Country: Switzerland , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 79. Uncertainty (95%) bounds are between 67.2 and 81.7.
Country: Switzerland , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 79. Uncertainty (95%) bounds are between 67.9 and 81.7.
Country: Switzerland , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 79.4. Uncertainty (95%) bounds are between 68.4 and 81.9.
Country: Switzerland , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 79.8. Uncertainty (95%) bounds are between 68.9 and 82.3.
Country: Switzerland , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 80.3. Uncertainty (95%) bounds are between 69.3 and 82.6.
Country: Switzerland , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 80.6. Uncertainty (95%) bounds are between 69.7 and 83.
Country: Switzerland , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 81. Uncertainty (95%) bounds are between 69.9 and 83.3.
Country: Switzerland , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 81.3. Uncertainty (95%) bounds are between 69.6 and 83.6.
Country: Switzerland , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 81.4. Uncertainty (95%) bounds are between 69.4 and 83.9.
Country: Switzerland , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 81.5. Uncertainty (95%) bounds are between 69 and 84.
Country: Switzerland , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 81.6. Uncertainty (95%) bounds are between 68.7 and 84.2.
Country: Switzerland , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 81.6. Uncertainty (95%) bounds are between 68.4 and 84.1.
Country: Switzerland , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 81.6. Uncertainty (95%) bounds are between 68.2 and 84.1.
Country: Switzerland , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 81.5. Uncertainty (95%) bounds are between 68 and 84.
Country: Switzerland , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 81.3. Uncertainty (95%) bounds are between 68 and 83.9.
Country: Switzerland , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 81.1. Uncertainty (95%) bounds are between 68 and 83.7.
Country: Switzerland , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.1 and 80.8. Uncertainty (95%) bounds are between 68.1 and 83.4.
Country: Switzerland , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.4 and 80.5. Uncertainty (95%) bounds are between 68.1 and 83.
Country: Switzerland , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 80.1. Uncertainty (95%) bounds are between 68.4 and 82.5.
Country: Switzerland , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 79.6. Uncertainty (95%) bounds are between 68.8 and 82.
Country: Switzerland , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 78.9. Uncertainty (95%) bounds are between 69.2 and 81.1.
Country: Switzerland , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.3 and 78.2. Uncertainty (95%) bounds are between 69.8 and 80.2.
Country: Switzerland , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 77.5. Uncertainty (95%) bounds are between 70.4 and 79.2.
Country: Switzerland , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 76.8. Uncertainty (95%) bounds are between 70.7 and 78.3.
Country: Switzerland , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.6 and 76.6. Uncertainty (95%) bounds are between 70.4 and 78.2.
Country: Switzerland , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.2 and 76.5. Uncertainty (95%) bounds are between 70.1 and 78.1.
Country: Switzerland , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 76.3. Uncertainty (95%) bounds are between 69.9 and 77.9.
Country: Switzerland , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 76.1. Uncertainty (95%) bounds are between 69.7 and 77.6.
Country: Switzerland , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.7 and 75.9. Uncertainty (95%) bounds are between 69.5 and 77.5.
Country: Switzerland , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.4 and 76.4. Uncertainty (95%) bounds are between 68.7 and 78.2.
Country: Switzerland , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 65 and 77.2. Uncertainty (95%) bounds are between 67.8 and 79.3.
Country: Switzerland , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 77.9. Uncertainty (95%) bounds are between 66.9 and 80.3.
Country: Switzerland , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.2 and 78.6. Uncertainty (95%) bounds are between 66.1 and 81.3.
Country: Switzerland , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 61 and 79.3. Uncertainty (95%) bounds are between 65.3 and 82.2.
Country: Tajikistan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 46.4. Uncertainty (95%) bounds are between 7.4 and 61.6.
Country: Tajikistan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 46.4. Uncertainty (95%) bounds are between 7.8 and 61.1.
Country: Tajikistan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.5 and 46.3. Uncertainty (95%) bounds are between 8.2 and 61.3.
Country: Tajikistan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.9 and 46.3. Uncertainty (95%) bounds are between 8.7 and 61.1.
Country: Tajikistan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.3 and 46.3. Uncertainty (95%) bounds are between 9.2 and 60.9.
Country: Tajikistan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.6 and 46.3. Uncertainty (95%) bounds are between 9.8 and 60.5.
Country: Tajikistan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 46.3. Uncertainty (95%) bounds are between 10.3 and 60.
Country: Tajikistan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 46.3. Uncertainty (95%) bounds are between 10.8 and 59.7.
Country: Tajikistan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 7 and 46.4. Uncertainty (95%) bounds are between 11.5 and 59.2.
Country: Tajikistan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 46.5. Uncertainty (95%) bounds are between 12.2 and 58.9.
Country: Tajikistan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 46.4. Uncertainty (95%) bounds are between 12.8 and 58.7.
Country: Tajikistan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 46.3. Uncertainty (95%) bounds are between 13.5 and 58.1.
Country: Tajikistan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.5 and 46.1. Uncertainty (95%) bounds are between 14.2 and 57.7.
Country: Tajikistan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.2 and 46. Uncertainty (95%) bounds are between 14.9 and 57.1.
Country: Tajikistan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 45.9. Uncertainty (95%) bounds are between 15.7 and 56.6.
Country: Tajikistan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.7 and 45.9. Uncertainty (95%) bounds are between 16.5 and 56.
Country: Tajikistan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.6 and 45.9. Uncertainty (95%) bounds are between 17.3 and 55.6.
Country: Tajikistan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 45.8. Uncertainty (95%) bounds are between 18.3 and 55.
Country: Tajikistan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.4 and 45.7. Uncertainty (95%) bounds are between 19.1 and 54.4.
Country: Tajikistan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.3 and 45.7. Uncertainty (95%) bounds are between 20.1 and 53.7.
Country: Tajikistan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.4 and 45.5. Uncertainty (95%) bounds are between 21 and 53.2.
Country: Tajikistan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.2 and 45.3. Uncertainty (95%) bounds are between 21.7 and 52.7.
Country: Tajikistan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 45. Uncertainty (95%) bounds are between 22.5 and 52.
Country: Tajikistan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 19 and 44.6. Uncertainty (95%) bounds are between 23.3 and 51.2.
Country: Tajikistan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.9 and 44.2. Uncertainty (95%) bounds are between 24 and 50.3.
Country: Tajikistan , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 20.8 and 43.7. Uncertainty (95%) bounds are between 24.7 and 49.6.
Country: Tajikistan , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 21.9 and 43.3. Uncertainty (95%) bounds are between 25.5 and 48.6.
Country: Tajikistan , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.7 and 42.7. Uncertainty (95%) bounds are between 26.3 and 47.4.
Country: Tajikistan , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 42.2. Uncertainty (95%) bounds are between 27.1 and 46.4.
Country: Tajikistan , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 41.5. Uncertainty (95%) bounds are between 28 and 45.4.
Country: Tajikistan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.9 and 41. Uncertainty (95%) bounds are between 28.7 and 44.6.
Country: Tajikistan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 40.8. Uncertainty (95%) bounds are between 29.2 and 44.2.
Country: Tajikistan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.9 and 40.7. Uncertainty (95%) bounds are between 29.5 and 43.9.
Country: Tajikistan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.3 and 40.4. Uncertainty (95%) bounds are between 29.8 and 43.4.
Country: Tajikistan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.5 and 40. Uncertainty (95%) bounds are between 30 and 42.7.
Country: Tajikistan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.8 and 39.3. Uncertainty (95%) bounds are between 30.1 and 41.9.
Country: Tajikistan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.6 and 38.6. Uncertainty (95%) bounds are between 29.8 and 41.1.
Country: Tajikistan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.2 and 37.7. Uncertainty (95%) bounds are between 29.3 and 40.2.
Country: Tajikistan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 36.6. Uncertainty (95%) bounds are between 28.5 and 39.
Country: Tajikistan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.1 and 35.3. Uncertainty (95%) bounds are between 27.9 and 37.6.
Country: Tajikistan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.7 and 33.8. Uncertainty (95%) bounds are between 27.3 and 35.7.
Country: Tajikistan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.8 and 32.2. Uncertainty (95%) bounds are between 27.1 and 33.8.
Country: Tajikistan , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26 and 31. Uncertainty (95%) bounds are between 27 and 32.3.
Country: Tajikistan , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.3 and 31.2. Uncertainty (95%) bounds are between 26.5 and 32.5.
Country: Tajikistan , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.9 and 31.5. Uncertainty (95%) bounds are between 26.2 and 33.1.
Country: Tajikistan , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 31.7. Uncertainty (95%) bounds are between 26.4 and 33.3.
Country: Tajikistan , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.7 and 31.7. Uncertainty (95%) bounds are between 26.9 and 33.
Country: Tajikistan , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 31.7. Uncertainty (95%) bounds are between 27.6 and 33.1.
Country: Tajikistan , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.8 and 33.1. Uncertainty (95%) bounds are between 27.2 and 34.9.
Country: Tajikistan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 34.9. Uncertainty (95%) bounds are between 26.7 and 37.2.
Country: Tajikistan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.9 and 36.6. Uncertainty (95%) bounds are between 26.3 and 39.7.
Country: Tajikistan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.1 and 38.3. Uncertainty (95%) bounds are between 26 and 42.
Country: Tajikistan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.3 and 40. Uncertainty (95%) bounds are between 25.7 and 44.2.
Country: Türkiye , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.5 and 36.9. Uncertainty (95%) bounds are between 27 and 39.7.
Country: Türkiye , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.3 and 38.2. Uncertainty (95%) bounds are between 27.8 and 41.2.
Country: Türkiye , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.2 and 39.5. Uncertainty (95%) bounds are between 28.7 and 42.6.
Country: Türkiye , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.2 and 40.8. Uncertainty (95%) bounds are between 29.8 and 44.
Country: Türkiye , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.3 and 42.7. Uncertainty (95%) bounds are between 31.1 and 46.1.
Country: Türkiye , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.5 and 44.7. Uncertainty (95%) bounds are between 32.6 and 48.3.
Country: Türkiye , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 46.7. Uncertainty (95%) bounds are between 34.1 and 50.2.
Country: Türkiye , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.7 and 48.6. Uncertainty (95%) bounds are between 35.9 and 52.1.
Country: Türkiye , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.5 and 50.4. Uncertainty (95%) bounds are between 37.6 and 53.9.
Country: Türkiye , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 52.2. Uncertainty (95%) bounds are between 39.2 and 55.6.
Country: Türkiye , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 53.8. Uncertainty (95%) bounds are between 40.7 and 57.3.
Country: Türkiye , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39 and 55.4. Uncertainty (95%) bounds are between 42.4 and 58.8.
Country: Türkiye , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.9 and 56.9. Uncertainty (95%) bounds are between 44.1 and 60.2.
Country: Türkiye , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.8 and 58.3. Uncertainty (95%) bounds are between 45.9 and 61.5.
Country: Türkiye , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 60. Uncertainty (95%) bounds are between 47.7 and 63.
Country: Türkiye , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.4 and 61.5. Uncertainty (95%) bounds are between 49.5 and 64.5.
Country: Türkiye , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 62.8. Uncertainty (95%) bounds are between 51.4 and 65.6.
Country: Türkiye , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 63.8. Uncertainty (95%) bounds are between 53.3 and 66.5.
Country: Türkiye , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 64.6. Uncertainty (95%) bounds are between 54.9 and 67.3.
Country: Türkiye , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 65.2. Uncertainty (95%) bounds are between 55.7 and 67.7.
Country: Türkiye , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 65.4. Uncertainty (95%) bounds are between 56.4 and 67.7.
Country: Türkiye , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 65.6. Uncertainty (95%) bounds are between 57.2 and 67.9.
Country: Türkiye , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 65.6. Uncertainty (95%) bounds are between 58.2 and 67.6.
Country: Türkiye , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 65.7. Uncertainty (95%) bounds are between 59 and 67.5.
Country: Türkiye , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 66.3. Uncertainty (95%) bounds are between 59.1 and 68.1.
Country: Türkiye , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 66.8. Uncertainty (95%) bounds are between 59.2 and 68.8.
Country: Türkiye , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 67.2. Uncertainty (95%) bounds are between 59.7 and 69.1.
Country: Türkiye , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 67.4. Uncertainty (95%) bounds are between 60.4 and 69.2.
Country: Türkiye , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 67.8. Uncertainty (95%) bounds are between 61.4 and 69.5.
Country: Türkiye , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 69. Uncertainty (95%) bounds are between 62.1 and 70.9.
Country: Türkiye , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 70.4. Uncertainty (95%) bounds are between 62.9 and 72.4.
Country: Türkiye , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 71.7. Uncertainty (95%) bounds are between 63.9 and 73.7.
Country: Türkiye , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 72.7. Uncertainty (95%) bounds are between 65.1 and 74.7.
Country: Türkiye , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 73.5. Uncertainty (95%) bounds are between 66.5 and 75.2.
Country: Türkiye , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 74.2. Uncertainty (95%) bounds are between 67.7 and 75.8.
Country: Türkiye , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 74.8. Uncertainty (95%) bounds are between 68.1 and 76.5.
Country: Türkiye , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 75.3. Uncertainty (95%) bounds are between 68.5 and 76.9.
Country: Türkiye , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 75.5. Uncertainty (95%) bounds are between 68.9 and 77.1.
Country: Türkiye , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 75.6. Uncertainty (95%) bounds are between 69.4 and 77.2.
Country: Türkiye , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.4 and 76. Uncertainty (95%) bounds are between 69.3 and 77.7.
Country: Türkiye , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 76.3. Uncertainty (95%) bounds are between 69.2 and 78.
Country: Türkiye , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.3 and 76.3. Uncertainty (95%) bounds are between 69.3 and 78.1.
Country: Türkiye , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 76.2. Uncertainty (95%) bounds are between 69.4 and 77.9.
Country: Türkiye , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 76. Uncertainty (95%) bounds are between 69.5 and 77.6.
Country: Türkiye , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 75.9. Uncertainty (95%) bounds are between 69.1 and 77.5.
Country: Türkiye , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 75.8. Uncertainty (95%) bounds are between 68.5 and 77.5.
Country: Türkiye , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 75.5. Uncertainty (95%) bounds are between 68 and 77.2.
Country: Türkiye , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 75.1. Uncertainty (95%) bounds are between 67.6 and 76.9.
Country: Türkiye , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 74.7. Uncertainty (95%) bounds are between 67.4 and 76.6.
Country: Türkiye , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.6 and 74.9. Uncertainty (95%) bounds are between 66.8 and 77.
Country: Türkiye , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.3 and 75.6. Uncertainty (95%) bounds are between 66 and 77.8.
Country: Türkiye , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.1 and 76.3. Uncertainty (95%) bounds are between 65.2 and 78.9.
Country: Türkiye , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 77.1. Uncertainty (95%) bounds are between 64.6 and 79.9.
Country: Turkmenistan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 65.5. Uncertainty (95%) bounds are between 13.4 and 77.1.
Country: Turkmenistan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 65.4. Uncertainty (95%) bounds are between 14.2 and 76.8.
Country: Turkmenistan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.8 and 65.5. Uncertainty (95%) bounds are between 15 and 76.1.
Country: Turkmenistan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 65.3. Uncertainty (95%) bounds are between 15.8 and 75.6.
Country: Turkmenistan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 65.1. Uncertainty (95%) bounds are between 16.6 and 75.3.
Country: Turkmenistan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.9 and 64.9. Uncertainty (95%) bounds are between 17.5 and 74.9.
Country: Turkmenistan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.8 and 64.9. Uncertainty (95%) bounds are between 18.4 and 74.4.
Country: Turkmenistan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 11.7 and 64.4. Uncertainty (95%) bounds are between 19.3 and 74.3.
Country: Turkmenistan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.7 and 64.3. Uncertainty (95%) bounds are between 20.3 and 73.7.
Country: Turkmenistan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.8 and 63.9. Uncertainty (95%) bounds are between 21.4 and 73.3.
Country: Turkmenistan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.8 and 63.7. Uncertainty (95%) bounds are between 22.5 and 72.8.
Country: Turkmenistan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 15.9 and 63.5. Uncertainty (95%) bounds are between 23.6 and 72.2.
Country: Turkmenistan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.1 and 63.1. Uncertainty (95%) bounds are between 24.8 and 71.7.
Country: Turkmenistan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.2 and 62.8. Uncertainty (95%) bounds are between 26.1 and 71.1.
Country: Turkmenistan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.5 and 62.6. Uncertainty (95%) bounds are between 27.3 and 70.4.
Country: Turkmenistan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 21 and 62.2. Uncertainty (95%) bounds are between 28.4 and 69.6.
Country: Turkmenistan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.5 and 61.8. Uncertainty (95%) bounds are between 29.6 and 69.1.
Country: Turkmenistan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 23.9 and 61.5. Uncertainty (95%) bounds are between 30.9 and 68.6.
Country: Turkmenistan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 25.5 and 61.1. Uncertainty (95%) bounds are between 32.2 and 67.8.
Country: Turkmenistan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.2 and 60.8. Uncertainty (95%) bounds are between 33.5 and 67.2.
Country: Turkmenistan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.9 and 60.4. Uncertainty (95%) bounds are between 34.8 and 66.5.
Country: Turkmenistan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 60.1. Uncertainty (95%) bounds are between 36.1 and 65.8.
Country: Turkmenistan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 59.8. Uncertainty (95%) bounds are between 37.5 and 65.4.
Country: Turkmenistan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 33.6 and 59.4. Uncertainty (95%) bounds are between 38.9 and 64.6.
Country: Turkmenistan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 59. Uncertainty (95%) bounds are between 40.3 and 63.7.
Country: Turkmenistan , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 58.5. Uncertainty (95%) bounds are between 41.8 and 62.7.
Country: Turkmenistan , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.4 and 57.9. Uncertainty (95%) bounds are between 43.3 and 61.8.
Country: Turkmenistan , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.6 and 57.3. Uncertainty (95%) bounds are between 44.9 and 60.5.
Country: Turkmenistan , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.9 and 56.6. Uncertainty (95%) bounds are between 46.5 and 59.1.
Country: Turkmenistan , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 46 and 55.6. Uncertainty (95%) bounds are between 48.1 and 57.6.
Country: Turkmenistan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 54.9. Uncertainty (95%) bounds are between 49.3 and 56.5.
Country: Turkmenistan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 55.3. Uncertainty (95%) bounds are between 48.6 and 57.2.
Country: Turkmenistan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.4 and 55.9. Uncertainty (95%) bounds are between 47.6 and 58.
Country: Turkmenistan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 56.2. Uncertainty (95%) bounds are between 46.6 and 58.6.
Country: Turkmenistan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.1 and 56.3. Uncertainty (95%) bounds are between 45.8 and 59.1.
Country: Turkmenistan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.3 and 56.2. Uncertainty (95%) bounds are between 45.3 and 59.2.
Country: Turkmenistan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.8 and 56.1. Uncertainty (95%) bounds are between 44.8 and 59.
Country: Turkmenistan , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 56.5. Uncertainty (95%) bounds are between 44.4 and 59.6.
Country: Turkmenistan , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.9 and 56.9. Uncertainty (95%) bounds are between 44.2 and 60.1.
Country: Turkmenistan , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.5 and 57.2. Uncertainty (95%) bounds are between 44 and 60.7.
Country: Turkmenistan , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 57.5. Uncertainty (95%) bounds are between 43.8 and 61.1.
Country: Turkmenistan , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.3 and 57.6. Uncertainty (95%) bounds are between 43.9 and 61.1.
Country: Turkmenistan , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.5 and 57.6. Uncertainty (95%) bounds are between 44 and 61.
Country: Turkmenistan , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.9 and 57.4. Uncertainty (95%) bounds are between 44.3 and 60.8.
Country: Turkmenistan , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 57.2. Uncertainty (95%) bounds are between 44.6 and 60.5.
Country: Turkmenistan , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 57. Uncertainty (95%) bounds are between 45 and 60.2.
Country: Turkmenistan , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 57.1. Uncertainty (95%) bounds are between 45.1 and 60.4.
Country: Turkmenistan , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 57.5. Uncertainty (95%) bounds are between 45.1 and 60.7.
Country: Turkmenistan , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.8 and 57.8. Uncertainty (95%) bounds are between 45.1 and 61.2.
Country: Turkmenistan , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.7 and 58.3. Uncertainty (95%) bounds are between 45.1 and 61.7.
Country: Turkmenistan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 59.2. Uncertainty (95%) bounds are between 44.8 and 62.8.
Country: Turkmenistan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.3 and 60.3. Uncertainty (95%) bounds are between 44.4 and 64.3.
Country: Turkmenistan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 61.4. Uncertainty (95%) bounds are between 44 and 65.6.
Country: Ukraine , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 84.3. Uncertainty (95%) bounds are between 46.3 and 89.
Country: Ukraine , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.1 and 84. Uncertainty (95%) bounds are between 47.2 and 88.8.
Country: Ukraine , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 83.8. Uncertainty (95%) bounds are between 48 and 88.5.
Country: Ukraine , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.5 and 83.5. Uncertainty (95%) bounds are between 49 and 88.2.
Country: Ukraine , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 83.2. Uncertainty (95%) bounds are between 49.8 and 88.1.
Country: Ukraine , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 82.9. Uncertainty (95%) bounds are between 50.6 and 87.7.
Country: Ukraine , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 40 and 82.7. Uncertainty (95%) bounds are between 51.4 and 87.3.
Country: Ukraine , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 82.3. Uncertainty (95%) bounds are between 52.1 and 86.9.
Country: Ukraine , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.7 and 82. Uncertainty (95%) bounds are between 53 and 86.6.
Country: Ukraine , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.8 and 81.7. Uncertainty (95%) bounds are between 53.9 and 86.2.
Country: Ukraine , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 45.1 and 81.4. Uncertainty (95%) bounds are between 54.6 and 86.
Country: Ukraine , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.4 and 81. Uncertainty (95%) bounds are between 55.4 and 85.5.
Country: Ukraine , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.7 and 80.6. Uncertainty (95%) bounds are between 56.3 and 85.
Country: Ukraine , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 49 and 80.3. Uncertainty (95%) bounds are between 57.1 and 84.4.
Country: Ukraine , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 79.8. Uncertainty (95%) bounds are between 57.9 and 83.8.
Country: Ukraine , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.9 and 79.4. Uncertainty (95%) bounds are between 58.9 and 83.3.
Country: Ukraine , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.4 and 79. Uncertainty (95%) bounds are between 59.9 and 82.7.
Country: Ukraine , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 78.5. Uncertainty (95%) bounds are between 60.8 and 82.
Country: Ukraine , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 56.4 and 78. Uncertainty (95%) bounds are between 61.7 and 81.4.
Country: Ukraine , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.9 and 77.5. Uncertainty (95%) bounds are between 62.6 and 80.7.
Country: Ukraine , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 59 and 77.1. Uncertainty (95%) bounds are between 63.4 and 80.2.
Country: Ukraine , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.5 and 76.9. Uncertainty (95%) bounds are between 63.8 and 80.1.
Country: Ukraine , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 60 and 77. Uncertainty (95%) bounds are between 64.1 and 79.9.
Country: Ukraine , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.4 and 77. Uncertainty (95%) bounds are between 64.3 and 79.8.
Country: Ukraine , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 77. Uncertainty (95%) bounds are between 64.6 and 79.7.
Country: Ukraine , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.4 and 76.9. Uncertainty (95%) bounds are between 64.9 and 79.6.
Country: Ukraine , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.1 and 76.6. Uncertainty (95%) bounds are between 65.4 and 79.3.
Country: Ukraine , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.9 and 76.3. Uncertainty (95%) bounds are between 65.9 and 78.8.
Country: Ukraine , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.9 and 76. Uncertainty (95%) bounds are between 66.6 and 78.2.
Country: Ukraine , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 75.7. Uncertainty (95%) bounds are between 67.2 and 77.7.
Country: Ukraine , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 75.6. Uncertainty (95%) bounds are between 67.7 and 77.5.
Country: Ukraine , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 75.3. Uncertainty (95%) bounds are between 67.3 and 77.3.
Country: Ukraine , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 74.9. Uncertainty (95%) bounds are between 66.6 and 76.8.
Country: Ukraine , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 74.2. Uncertainty (95%) bounds are between 66 and 76.2.
Country: Ukraine , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 73.2. Uncertainty (95%) bounds are between 65.4 and 75.2.
Country: Ukraine , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 72.1. Uncertainty (95%) bounds are between 65.1 and 74.
Country: Ukraine , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 70.9. Uncertainty (95%) bounds are between 64.7 and 72.6.
Country: Ukraine , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.8 and 70. Uncertainty (95%) bounds are between 64.3 and 71.6.
Country: Ukraine , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 70.2. Uncertainty (95%) bounds are between 63.4 and 72.
Country: Ukraine , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.5 and 70.7. Uncertainty (95%) bounds are between 62.7 and 72.7.
Country: Ukraine , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 71.3. Uncertainty (95%) bounds are between 62.2 and 73.5.
Country: Ukraine , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 71.8. Uncertainty (95%) bounds are between 61.8 and 74.4.
Country: Ukraine , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 72.4. Uncertainty (95%) bounds are between 61.5 and 75.
Country: Ukraine , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 73.2. Uncertainty (95%) bounds are between 60.8 and 76.
Country: Ukraine , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 74. Uncertainty (95%) bounds are between 60.1 and 77.1.
Country: Ukraine , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.8 and 74.7. Uncertainty (95%) bounds are between 59.3 and 78.
Country: Ukraine , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 75.3. Uncertainty (95%) bounds are between 58.6 and 78.9.
Country: Ukraine , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 76. Uncertainty (95%) bounds are between 58.1 and 79.9.
Country: Ukraine , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.8 and 76.6. Uncertainty (95%) bounds are between 57.5 and 80.7.
Country: Ukraine , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 77.2. Uncertainty (95%) bounds are between 56.9 and 81.3.
Country: Ukraine , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 77.7. Uncertainty (95%) bounds are between 56.4 and 82.
Country: Ukraine , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 78.2. Uncertainty (95%) bounds are between 56 and 82.6.
Country: Ukraine , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 78.6. Uncertainty (95%) bounds are between 55.6 and 83.2.
Country: United Kingdom , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.6 and 88.6. Uncertainty (95%) bounds are between 64.4 and 92.
Country: United Kingdom , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 88.4. Uncertainty (95%) bounds are between 65 and 91.8.
Country: United Kingdom , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 88.3. Uncertainty (95%) bounds are between 65.6 and 91.6.
Country: United Kingdom , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 88. Uncertainty (95%) bounds are between 66 and 91.3.
Country: United Kingdom , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 87.8. Uncertainty (95%) bounds are between 66.8 and 91.
Country: United Kingdom , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.5 and 87.6. Uncertainty (95%) bounds are between 67.5 and 90.7.
Country: United Kingdom , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.6 and 87.3. Uncertainty (95%) bounds are between 68.1 and 90.3.
Country: United Kingdom , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 87. Uncertainty (95%) bounds are between 68.6 and 89.9.
Country: United Kingdom , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.5 and 86.7. Uncertainty (95%) bounds are between 69.3 and 89.5.
Country: United Kingdom , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 86.4. Uncertainty (95%) bounds are between 69.8 and 89.2.
Country: United Kingdom , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.6 and 86.1. Uncertainty (95%) bounds are between 70.4 and 88.9.
Country: United Kingdom , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.8 and 85.7. Uncertainty (95%) bounds are between 71 and 88.4.
Country: United Kingdom , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.9 and 85.3. Uncertainty (95%) bounds are between 71.6 and 87.9.
Country: United Kingdom , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 68 and 84.9. Uncertainty (95%) bounds are between 72.3 and 87.3.
Country: United Kingdom , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 69 and 84.4. Uncertainty (95%) bounds are between 72.9 and 86.8.
Country: United Kingdom , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 69.9 and 83.9. Uncertainty (95%) bounds are between 73.3 and 86.1.
Country: United Kingdom , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.4 and 83.3. Uncertainty (95%) bounds are between 73.6 and 85.3.
Country: United Kingdom , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.3 and 82.6. Uncertainty (95%) bounds are between 73.2 and 84.7.
Country: United Kingdom , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70 and 81.9. Uncertainty (95%) bounds are between 72.6 and 84.
Country: United Kingdom , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 81.4. Uncertainty (95%) bounds are between 72.4 and 83.4.
Country: United Kingdom , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 81.2. Uncertainty (95%) bounds are between 72.4 and 83.3.
Country: United Kingdom , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.1 and 81.6. Uncertainty (95%) bounds are between 72.8 and 83.6.
Country: United Kingdom , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.9 and 82.3. Uncertainty (95%) bounds are between 73.6 and 84.2.
Country: United Kingdom , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.7 and 82.9. Uncertainty (95%) bounds are between 74.3 and 84.7.
Country: United Kingdom , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.2 and 83.3. Uncertainty (95%) bounds are between 74.8 and 85.1.
Country: United Kingdom , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.5 and 83.5. Uncertainty (95%) bounds are between 75.2 and 85.3.
Country: United Kingdom , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73 and 83.7. Uncertainty (95%) bounds are between 75.6 and 85.5.
Country: United Kingdom , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.6 and 83.9. Uncertainty (95%) bounds are between 76.1 and 85.5.
Country: United Kingdom , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.1 and 84. Uncertainty (95%) bounds are between 76.5 and 85.7.
Country: United Kingdom , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74 and 84. Uncertainty (95%) bounds are between 76.4 and 85.6.
Country: United Kingdom , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.5 and 84.4. Uncertainty (95%) bounds are between 76.9 and 86.
Country: United Kingdom , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.1 and 84.9. Uncertainty (95%) bounds are between 77.6 and 86.5.
Country: United Kingdom , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.7 and 85.2. Uncertainty (95%) bounds are between 78.1 and 86.7.
Country: United Kingdom , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76 and 85.4. Uncertainty (95%) bounds are between 78.3 and 87.
Country: United Kingdom , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.9 and 85.3. Uncertainty (95%) bounds are between 78.1 and 86.9.
Country: United Kingdom , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75.5 and 85.2. Uncertainty (95%) bounds are between 77.8 and 86.7.
Country: United Kingdom , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 75 and 85. Uncertainty (95%) bounds are between 77.4 and 86.6.
Country: United Kingdom , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.6 and 84.8. Uncertainty (95%) bounds are between 77 and 86.4.
Country: United Kingdom , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74 and 84.5. Uncertainty (95%) bounds are between 76.6 and 86.2.
Country: United Kingdom , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.6 and 83.8. Uncertainty (95%) bounds are between 75.3 and 85.7.
Country: United Kingdom , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.9 and 82.9. Uncertainty (95%) bounds are between 73.9 and 85.
Country: United Kingdom , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.5 and 82.2. Uncertainty (95%) bounds are between 72.5 and 84.3.
Country: United Kingdom , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68 and 81.9. Uncertainty (95%) bounds are between 71.3 and 84.2.
Country: United Kingdom , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.7 and 82. Uncertainty (95%) bounds are between 70.3 and 84.5.
Country: United Kingdom , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.3 and 82.2. Uncertainty (95%) bounds are between 69.4 and 85.
Country: United Kingdom , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.1 and 82.6. Uncertainty (95%) bounds are between 68.6 and 85.4.
Country: United Kingdom , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.9 and 83. Uncertainty (95%) bounds are between 67.9 and 85.9.
Country: United Kingdom , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 61.9 and 83.4. Uncertainty (95%) bounds are between 67.2 and 86.4.
Country: United Kingdom , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 83.7. Uncertainty (95%) bounds are between 66.7 and 86.9.
Country: United Kingdom , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.9 and 84.1. Uncertainty (95%) bounds are between 66.2 and 87.4.
Country: United Kingdom , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 59 and 84.4. Uncertainty (95%) bounds are between 65.6 and 87.7.
Country: United Kingdom , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.4 and 84.8. Uncertainty (95%) bounds are between 65.2 and 88.1.
Country: United Kingdom , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.7 and 85.1. Uncertainty (95%) bounds are between 64.7 and 88.5.
Country: United States of America , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 71.9. Uncertainty (95%) bounds are between 63.2 and 73.9.
Country: United States of America , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 73. Uncertainty (95%) bounds are between 64.5 and 75.
Country: United States of America , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 74.2. Uncertainty (95%) bounds are between 65.9 and 76.2.
Country: United States of America , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65 and 75.3. Uncertainty (95%) bounds are between 67.4 and 77.1.
Country: United States of America , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.3 and 76.2. Uncertainty (95%) bounds are between 68.6 and 78.1.
Country: United States of America , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 76.7. Uncertainty (95%) bounds are between 69.2 and 78.5.
Country: United States of America , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 76.3. Uncertainty (95%) bounds are between 68.5 and 78.1.
Country: United States of America , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 76.3. Uncertainty (95%) bounds are between 67.6 and 78.2.
Country: United States of America , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 76.3. Uncertainty (95%) bounds are between 67 and 78.5.
Country: United States of America , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 76.3. Uncertainty (95%) bounds are between 66.5 and 78.5.
Country: United States of America , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 76.2. Uncertainty (95%) bounds are between 66.4 and 78.4.
Country: United States of America , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 76.1. Uncertainty (95%) bounds are between 66.4 and 78.3.
Country: United States of America , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 75.9. Uncertainty (95%) bounds are between 66.4 and 78.2.
Country: United States of America , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 76.1. Uncertainty (95%) bounds are between 66.5 and 78.4.
Country: United States of America , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 76.4. Uncertainty (95%) bounds are between 66.6 and 78.7.
Country: United States of America , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 76.6. Uncertainty (95%) bounds are between 66.9 and 78.8.
Country: United States of America , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.5 and 76.7. Uncertainty (95%) bounds are between 67.3 and 78.8.
Country: United States of America , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 76.6. Uncertainty (95%) bounds are between 67.8 and 78.6.
Country: United States of America , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 76.4. Uncertainty (95%) bounds are between 68.2 and 78.3.
Country: United States of America , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 76.1. Uncertainty (95%) bounds are between 68.2 and 77.9.
Country: United States of America , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 76. Uncertainty (95%) bounds are between 68.2 and 77.9.
Country: United States of America , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 76.5. Uncertainty (95%) bounds are between 68.3 and 78.6.
Country: United States of America , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 77.3. Uncertainty (95%) bounds are between 68.7 and 79.4.
Country: United States of America , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 78. Uncertainty (95%) bounds are between 69.2 and 80.1.
Country: United States of America , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 78.5. Uncertainty (95%) bounds are between 69.8 and 80.5.
Country: United States of America , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.7 and 78.9. Uncertainty (95%) bounds are between 70.3 and 80.8.
Country: United States of America , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 79.2. Uncertainty (95%) bounds are between 70.2 and 81.2.
Country: United States of America , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 79.4. Uncertainty (95%) bounds are between 70 and 81.5.
Country: United States of America , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 79.4. Uncertainty (95%) bounds are between 69.7 and 81.6.
Country: United States of America , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 79.2. Uncertainty (95%) bounds are between 69.6 and 81.4.
Country: United States of America , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 79. Uncertainty (95%) bounds are between 69.7 and 81.
Country: United States of America , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.3 and 78.7. Uncertainty (95%) bounds are between 69.8 and 80.6.
Country: United States of America , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 78.6. Uncertainty (95%) bounds are between 70.2 and 80.5.
Country: United States of America , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.1 and 78.9. Uncertainty (95%) bounds are between 70.6 and 80.8.
Country: United States of America , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 79.4. Uncertainty (95%) bounds are between 71 and 81.2.
Country: United States of America , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.2 and 79.8. Uncertainty (95%) bounds are between 71.6 and 81.6.
Country: United States of America , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 80. Uncertainty (95%) bounds are between 72.1 and 81.7.
Country: United States of America , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 80.1. Uncertainty (95%) bounds are between 72.2 and 81.8.
Country: United States of America , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.6 and 80. Uncertainty (95%) bounds are between 72 and 81.8.
Country: United States of America , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.1 and 79.8. Uncertainty (95%) bounds are between 71.6 and 81.6.
Country: United States of America , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 79.4. Uncertainty (95%) bounds are between 71.2 and 81.3.
Country: United States of America , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.5 and 79. Uncertainty (95%) bounds are between 70.8 and 80.8.
Country: United States of America , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 78.6. Uncertainty (95%) bounds are between 70.6 and 80.4.
Country: United States of America , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 78.2. Uncertainty (95%) bounds are between 70.6 and 80.
Country: United States of America , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69 and 78.2. Uncertainty (95%) bounds are between 71.1 and 79.9.
Country: United States of America , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.9 and 78.4. Uncertainty (95%) bounds are between 71.8 and 80.1.
Country: United States of America , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.7 and 78.5. Uncertainty (95%) bounds are between 72.4 and 80.1.
Country: United States of America , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 78.6. Uncertainty (95%) bounds are between 72.7 and 80.1.
Country: United States of America , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.6 and 79.1. Uncertainty (95%) bounds are between 72.5 and 80.7.
Country: United States of America , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 79.8. Uncertainty (95%) bounds are between 71.8 and 81.6.
Country: United States of America , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.1 and 80.5. Uncertainty (95%) bounds are between 71.1 and 82.6.
Country: United States of America , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.9 and 81.2. Uncertainty (95%) bounds are between 70.3 and 83.5.
Country: United States of America , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.7 and 81.8. Uncertainty (95%) bounds are between 69.6 and 84.3.
Country: Uruguay , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 57.8 and 90.2. Uncertainty (95%) bounds are between 69.2 and 92.9.
Country: Uruguay , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.3 and 90. Uncertainty (95%) bounds are between 69.9 and 92.7.
Country: Uruguay , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 89.8. Uncertainty (95%) bounds are between 70.7 and 92.5.
Country: Uruguay , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 62.3 and 89.7. Uncertainty (95%) bounds are between 71.2 and 92.2.
Country: Uruguay , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.5 and 89.4. Uncertainty (95%) bounds are between 71.9 and 91.9.
Country: Uruguay , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 65 and 89.2. Uncertainty (95%) bounds are between 72.6 and 91.6.
Country: Uruguay , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.5 and 88.9. Uncertainty (95%) bounds are between 73.3 and 91.3.
Country: Uruguay , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.8 and 88.6. Uncertainty (95%) bounds are between 74 and 91.
Country: Uruguay , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 69 and 88.3. Uncertainty (95%) bounds are between 74.6 and 90.6.
Country: Uruguay , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 70.4 and 87.9. Uncertainty (95%) bounds are between 75.3 and 90.2.
Country: Uruguay , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 71.6 and 87.6. Uncertainty (95%) bounds are between 76 and 89.7.
Country: Uruguay , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 72.9 and 87.2. Uncertainty (95%) bounds are between 76.7 and 89.2.
Country: Uruguay , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 74.1 and 86.7. Uncertainty (95%) bounds are between 77.4 and 88.6.
Country: Uruguay , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 75.4 and 86.2. Uncertainty (95%) bounds are between 78.1 and 87.9.
Country: Uruguay , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 76.5 and 85.6. Uncertainty (95%) bounds are between 78.8 and 87.1.
Country: Uruguay , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 77.7 and 85. Uncertainty (95%) bounds are between 79.4 and 86.4.
Country: Uruguay , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 78.1 and 84.6. Uncertainty (95%) bounds are between 79.6 and 85.7.
Country: Uruguay , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 77.3 and 84.4. Uncertainty (95%) bounds are between 79 and 85.6.
Country: Uruguay , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 76 and 84.4. Uncertainty (95%) bounds are between 77.9 and 85.8.
Country: Uruguay , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.5 and 84.3. Uncertainty (95%) bounds are between 76.9 and 86.
Country: Uruguay , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.2 and 84.3. Uncertainty (95%) bounds are between 75.8 and 86.1.
Country: Uruguay , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72 and 84.4. Uncertainty (95%) bounds are between 75 and 86.2.
Country: Uruguay , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.9 and 84.4. Uncertainty (95%) bounds are between 74.3 and 86.4.
Country: Uruguay , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.2 and 84.4. Uncertainty (95%) bounds are between 73.7 and 86.5.
Country: Uruguay , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 84.3. Uncertainty (95%) bounds are between 73.2 and 86.6.
Country: Uruguay , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69 and 84.2. Uncertainty (95%) bounds are between 72.8 and 86.6.
Country: Uruguay , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.6 and 84.1. Uncertainty (95%) bounds are between 72.5 and 86.5.
Country: Uruguay , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 83.9. Uncertainty (95%) bounds are between 72.3 and 86.4.
Country: Uruguay , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 83.7. Uncertainty (95%) bounds are between 72.1 and 86.1.
Country: Uruguay , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 83.4. Uncertainty (95%) bounds are between 72 and 85.8.
Country: Uruguay , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 83.1. Uncertainty (95%) bounds are between 72.1 and 85.4.
Country: Uruguay , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 82.8. Uncertainty (95%) bounds are between 72.2 and 85.
Country: Uruguay , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.2 and 82.4. Uncertainty (95%) bounds are between 72.3 and 84.5.
Country: Uruguay , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.6 and 82. Uncertainty (95%) bounds are between 72.5 and 84.1.
Country: Uruguay , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.8 and 81.7. Uncertainty (95%) bounds are between 72.6 and 83.8.
Country: Uruguay , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 81.9. Uncertainty (95%) bounds are between 72.4 and 84.
Country: Uruguay , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.9 and 82.3. Uncertainty (95%) bounds are between 72.1 and 84.4.
Country: Uruguay , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.5 and 82.6. Uncertainty (95%) bounds are between 71.8 and 84.8.
Country: Uruguay , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.2 and 82.8. Uncertainty (95%) bounds are between 71.7 and 85.2.
Country: Uruguay , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 83. Uncertainty (95%) bounds are between 71.5 and 85.4.
Country: Uruguay , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 83.2. Uncertainty (95%) bounds are between 71.5 and 85.6.
Country: Uruguay , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 83.4. Uncertainty (95%) bounds are between 71.6 and 85.7.
Country: Uruguay , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 83.5. Uncertainty (95%) bounds are between 71.7 and 85.8.
Country: Uruguay , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68 and 83.5. Uncertainty (95%) bounds are between 71.8 and 85.9.
Country: Uruguay , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 83.6. Uncertainty (95%) bounds are between 72 and 85.9.
Country: Uruguay , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 83.7. Uncertainty (95%) bounds are between 72.2 and 86.
Country: Uruguay , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 68.1 and 83.9. Uncertainty (95%) bounds are between 72.1 and 86.3.
Country: Uruguay , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 67.4 and 84.3. Uncertainty (95%) bounds are between 71.7 and 86.8.
Country: Uruguay , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 66.6 and 84.6. Uncertainty (95%) bounds are between 71.3 and 87.2.
Country: Uruguay , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.9 and 85. Uncertainty (95%) bounds are between 70.8 and 87.7.
Country: Uruguay , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 65.2 and 85.4. Uncertainty (95%) bounds are between 70.4 and 88.2.
Country: Uruguay , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 64.4 and 85.7. Uncertainty (95%) bounds are between 69.9 and 88.6.
Country: Uruguay , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 63.5 and 86.2. Uncertainty (95%) bounds are between 69.4 and 89.2.
Country: Uzbekistan , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 66. Uncertainty (95%) bounds are between 13.6 and 77.3.
Country: Uzbekistan , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 65.9. Uncertainty (95%) bounds are between 14.5 and 76.7.
Country: Uzbekistan , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.3 and 65.8. Uncertainty (95%) bounds are between 15.4 and 76.8.
Country: Uzbekistan , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 65.6. Uncertainty (95%) bounds are between 16.3 and 76.3.
Country: Uzbekistan , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 65.4. Uncertainty (95%) bounds are between 17.4 and 76.
Country: Uzbekistan , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.9 and 65.2. Uncertainty (95%) bounds are between 18.5 and 75.5.
Country: Uzbekistan , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 65.1. Uncertainty (95%) bounds are between 19.6 and 74.9.
Country: Uzbekistan , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.1 and 64.7. Uncertainty (95%) bounds are between 20.8 and 74.4.
Country: Uzbekistan , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.5 and 64.5. Uncertainty (95%) bounds are between 22 and 73.9.
Country: Uzbekistan , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 14.9 and 64.3. Uncertainty (95%) bounds are between 23.3 and 73.6.
Country: Uzbekistan , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.1 and 64.2. Uncertainty (95%) bounds are between 24.8 and 73.1.
Country: Uzbekistan , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 17.5 and 63.9. Uncertainty (95%) bounds are between 26.2 and 72.6.
Country: Uzbekistan , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 19.2 and 63.7. Uncertainty (95%) bounds are between 27.7 and 72.
Country: Uzbekistan , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 21 and 63.4. Uncertainty (95%) bounds are between 29.2 and 71.3.
Country: Uzbekistan , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 63. Uncertainty (95%) bounds are between 30.7 and 70.7.
Country: Uzbekistan , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.7 and 62.7. Uncertainty (95%) bounds are between 32.2 and 69.8.
Country: Uzbekistan , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 26.7 and 62.4. Uncertainty (95%) bounds are between 33.9 and 68.9.
Country: Uzbekistan , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 28.7 and 62. Uncertainty (95%) bounds are between 35.6 and 68.1.
Country: Uzbekistan , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 61.6. Uncertainty (95%) bounds are between 37.3 and 67.3.
Country: Uzbekistan , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 61.2. Uncertainty (95%) bounds are between 39.1 and 66.5.
Country: Uzbekistan , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 35.5 and 60.8. Uncertainty (95%) bounds are between 41 and 65.6.
Country: Uzbekistan , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 60.3. Uncertainty (95%) bounds are between 42.8 and 64.8.
Country: Uzbekistan , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.6 and 60. Uncertainty (95%) bounds are between 44.9 and 63.9.
Country: Uzbekistan , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 43.5 and 59.6. Uncertainty (95%) bounds are between 47 and 62.9.
Country: Uzbekistan , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 59.3. Uncertainty (95%) bounds are between 49.2 and 61.9.
Country: Uzbekistan , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 59. Uncertainty (95%) bounds are between 51.6 and 60.9.
Country: Uzbekistan , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.4 and 59.3. Uncertainty (95%) bounds are between 53.9 and 60.9.
Country: Uzbekistan , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 61.3. Uncertainty (95%) bounds are between 55.3 and 62.9.
Country: Uzbekistan , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 63.5. Uncertainty (95%) bounds are between 56.7 and 65.3.
Country: Uzbekistan , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 65.5. Uncertainty (95%) bounds are between 58.5 and 67.4.
Country: Uzbekistan , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 67. Uncertainty (95%) bounds are between 60.4 and 68.8.
Country: Uzbekistan , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.2 and 68.2. Uncertainty (95%) bounds are between 62 and 69.8.
Country: Uzbekistan , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 69.1. Uncertainty (95%) bounds are between 63.1 and 70.6.
Country: Uzbekistan , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 70.1. Uncertainty (95%) bounds are between 63.1 and 71.8.
Country: Uzbekistan , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 70.9. Uncertainty (95%) bounds are between 62.8 and 72.9.
Country: Uzbekistan , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 71.6. Uncertainty (95%) bounds are between 62.4 and 73.8.
Country: Uzbekistan , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 72.2. Uncertainty (95%) bounds are between 62 and 74.7.
Country: Uzbekistan , Year: 2007
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 73.1. Uncertainty (95%) bounds are between 61.4 and 75.9.
Country: Uzbekistan , Year: 2008
Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 74. Uncertainty (95%) bounds are between 60.8 and 77.1.
Country: Uzbekistan , Year: 2009
Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 74.8. Uncertainty (95%) bounds are between 60.1 and 78.3.
Country: Uzbekistan , Year: 2010
Estimation Method: Projection. Uncertainty (80%) bounds are between 55 and 75.7. Uncertainty (95%) bounds are between 59.6 and 79.3.
Country: Uzbekistan , Year: 2011
Estimation Method: Projection. Uncertainty (80%) bounds are between 54.1 and 76.4. Uncertainty (95%) bounds are between 59.2 and 80.3.
Country: Uzbekistan , Year: 2012
Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 77.1. Uncertainty (95%) bounds are between 58.6 and 81.1.
Country: Uzbekistan , Year: 2013
Estimation Method: Projection. Uncertainty (80%) bounds are between 52.6 and 77.7. Uncertainty (95%) bounds are between 58.3 and 81.8.
Country: Uzbekistan , Year: 2014
Estimation Method: Projection. Uncertainty (80%) bounds are between 52 and 78.3. Uncertainty (95%) bounds are between 57.8 and 82.4.
Country: Uzbekistan , Year: 2015
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 78.8. Uncertainty (95%) bounds are between 57.5 and 83.1.
Country: Uzbekistan , Year: 2016
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 79.4. Uncertainty (95%) bounds are between 57.2 and 83.7.
Country: Uzbekistan , Year: 2017
Estimation Method: Projection. Uncertainty (80%) bounds are between 50.2 and 79.8. Uncertainty (95%) bounds are between 57 and 84.2.
Country: Uzbekistan , Year: 2018
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.8 and 80.2. Uncertainty (95%) bounds are between 56.6 and 84.8.
Country: Uzbekistan , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 80.5. Uncertainty (95%) bounds are between 56.5 and 85.3.
Country: Uzbekistan , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.9 and 80.9. Uncertainty (95%) bounds are between 56.2 and 85.8.
Country: Uzbekistan , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.5 and 81.3. Uncertainty (95%) bounds are between 56 and 86.2.
Country: Uzbekistan , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 81.7. Uncertainty (95%) bounds are between 55.8 and 86.5.
Country: Republic of Korea , Year: 1970
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 26.3. Uncertainty (95%) bounds are between 19.1 and 28.4.
Country: Republic of Korea , Year: 1971
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.3 and 28.2. Uncertainty (95%) bounds are between 21 and 30.4.
Country: Republic of Korea , Year: 1972
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.5 and 31.1. Uncertainty (95%) bounds are between 23.4 and 33.4.
Country: Republic of Korea , Year: 1973
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.2 and 34.4. Uncertainty (95%) bounds are between 26.2 and 36.9.
Country: Republic of Korea , Year: 1974
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.2 and 37.9. Uncertainty (95%) bounds are between 29.3 and 40.4.
Country: Republic of Korea , Year: 1975
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.3 and 41.5. Uncertainty (95%) bounds are between 32.5 and 43.9.
Country: Republic of Korea , Year: 1976
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.5 and 44.9. Uncertainty (95%) bounds are between 35.8 and 47.4.
Country: Republic of Korea , Year: 1977
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.3 and 48.3. Uncertainty (95%) bounds are between 38.8 and 50.9.
Country: Republic of Korea , Year: 1978
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 51.4. Uncertainty (95%) bounds are between 41.9 and 54.
Country: Republic of Korea , Year: 1979
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.4 and 54.3. Uncertainty (95%) bounds are between 44.8 and 56.7.
Country: Republic of Korea , Year: 1980
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 56.9. Uncertainty (95%) bounds are between 47.2 and 59.4.
Country: Republic of Korea , Year: 1981
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 59.3. Uncertainty (95%) bounds are between 49.6 and 61.8.
Country: Republic of Korea , Year: 1982
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.6 and 61.7. Uncertainty (95%) bounds are between 52.3 and 64.1.
Country: Republic of Korea , Year: 1983
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 64.9. Uncertainty (95%) bounds are between 55.3 and 67.1.
Country: Republic of Korea , Year: 1984
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.7 and 67.9. Uncertainty (95%) bounds are between 58.5 and 70.2.
Country: Republic of Korea , Year: 1985
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 70.6. Uncertainty (95%) bounds are between 61.7 and 72.7.
Country: Republic of Korea , Year: 1986
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 73.1. Uncertainty (95%) bounds are between 64.3 and 75.1.
Country: Republic of Korea , Year: 1987
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 75.1. Uncertainty (95%) bounds are between 66.7 and 77.1.
Country: Republic of Korea , Year: 1988
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 76.7. Uncertainty (95%) bounds are between 68.8 and 78.7.
Country: Republic of Korea , Year: 1989
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68 and 78. Uncertainty (95%) bounds are between 70.2 and 79.8.
Country: Republic of Korea , Year: 1990
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.1 and 78.8. Uncertainty (95%) bounds are between 71.4 and 80.6.
Country: Republic of Korea , Year: 1991
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70 and 79.3. Uncertainty (95%) bounds are between 72.3 and 81.
Country: Republic of Korea , Year: 1992
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.2 and 79.7. Uncertainty (95%) bounds are between 72.5 and 81.4.
Country: Republic of Korea , Year: 1993
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.3 and 79.9. Uncertainty (95%) bounds are between 72.6 and 81.6.
Country: Republic of Korea , Year: 1994
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.4 and 80. Uncertainty (95%) bounds are between 72.8 and 81.7.
Country: Republic of Korea , Year: 1995
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.6 and 80.4. Uncertainty (95%) bounds are between 73 and 82.
Country: Republic of Korea , Year: 1996
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.1 and 80.7. Uncertainty (95%) bounds are between 73.4 and 82.3.
Country: Republic of Korea , Year: 1997
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.7 and 81. Uncertainty (95%) bounds are between 73.9 and 82.6.
Country: Republic of Korea , Year: 1998
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.9 and 81.3. Uncertainty (95%) bounds are between 74.2 and 82.8.
Country: Republic of Korea , Year: 1999
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.2 and 81.4. Uncertainty (95%) bounds are between 74.5 and 82.9.
Country: Republic of Korea , Year: 2000
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.8 and 81.6. Uncertainty (95%) bounds are between 74.9 and 83.1.
Country: Republic of Korea , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.5 and 82. Uncertainty (95%) bounds are between 75.4 and 83.5.
Country: Republic of Korea , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.1 and 82.4. Uncertainty (95%) bounds are between 76.1 and 83.7.
Country: Republic of Korea , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.7 and 82.5. Uncertainty (95%) bounds are between 76.6 and 83.8.
Country: Republic of Korea , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.7 and 82.1. Uncertainty (95%) bounds are between 76.5 and 83.4.
Country: Republic of Korea , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.5 and 81.6. Uncertainty (95%) bounds are between 76.2 and 82.8.
Country: Republic of Korea , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.8 and 81.2. Uncertainty (95%) bounds are between 75.5 and 82.5.
Country: Republic of Korea , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.1 and 81.1. Uncertainty (95%) bounds are between 75 and 82.4.
Country: Republic of Korea , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.6 and 80.9. Uncertainty (95%) bounds are between 74.6 and 82.2.
Country: Republic of Korea , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.4 and 80.6. Uncertainty (95%) bounds are between 74.4 and 82.
Country: Republic of Korea , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.3 and 80.5. Uncertainty (95%) bounds are between 74.3 and 81.8.
Country: Republic of Korea , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.2 and 80.3. Uncertainty (95%) bounds are between 74.3 and 81.7.
Country: Republic of Korea , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.4 and 80.2. Uncertainty (95%) bounds are between 74.4 and 81.6.
Country: Republic of Korea , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 72.5 and 80.6. Uncertainty (95%) bounds are between 74.6 and 81.9.
Country: Republic of Korea , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73 and 81. Uncertainty (95%) bounds are between 75.1 and 82.3.
Country: Republic of Korea , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 73.7 and 81.4. Uncertainty (95%) bounds are between 75.7 and 82.6.
Country: Republic of Korea , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.1 and 82. Uncertainty (95%) bounds are between 76.2 and 83.3.
Country: Republic of Korea , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.5 and 82.6. Uncertainty (95%) bounds are between 76.7 and 83.9.
Country: Republic of Korea , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 74.9 and 83.2. Uncertainty (95%) bounds are between 77 and 84.5.
Country: Republic of Korea , Year: 2019
Estimation Method: Projection. Uncertainty (80%) bounds are between 74.5 and 83.8. Uncertainty (95%) bounds are between 76.9 and 85.3.
Country: Republic of Korea , Year: 2020
Estimation Method: Projection. Uncertainty (80%) bounds are between 73.8 and 84.5. Uncertainty (95%) bounds are between 76.5 and 86.2.
Country: Republic of Korea , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 73.1 and 85.1. Uncertainty (95%) bounds are between 76.1 and 87.
Country: Republic of Korea , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 72.3 and 85.6. Uncertainty (95%) bounds are between 75.7 and 87.7.
Country: Argentina , Year: 1970
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.4 and 76.7. Uncertainty (95%) bounds are between 8.9 and 85.6.
Country: Argentina , Year: 1971
Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 76.6. Uncertainty (95%) bounds are between 9.7 and 85.3.
Country: Argentina , Year: 1972
Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 76.5. Uncertainty (95%) bounds are between 10.6 and 84.9.
Country: Argentina , Year: 1973
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 76.2. Uncertainty (95%) bounds are between 11.6 and 84.6.
Country: Argentina , Year: 1974
Estimation Method: Projection. Uncertainty (80%) bounds are between 5.7 and 76.1. Uncertainty (95%) bounds are between 12.8 and 84.4.
Country: Argentina , Year: 1975
Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 75.9. Uncertainty (95%) bounds are between 14 and 84.2.
Country: Argentina , Year: 1976
Estimation Method: Projection. Uncertainty (80%) bounds are between 7.4 and 75.8. Uncertainty (95%) bounds are between 15.4 and 83.9.
Country: Argentina , Year: 1977
Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 75.6. Uncertainty (95%) bounds are between 16.8 and 83.7.
Country: Argentina , Year: 1978
Estimation Method: Projection. Uncertainty (80%) bounds are between 9.6 and 75.6. Uncertainty (95%) bounds are between 18.3 and 83.4.
Country: Argentina , Year: 1979
Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 75.3. Uncertainty (95%) bounds are between 19.9 and 83.
Country: Argentina , Year: 1980
Estimation Method: Projection. Uncertainty (80%) bounds are between 12.1 and 75.1. Uncertainty (95%) bounds are between 21.6 and 82.7.
Country: Argentina , Year: 1981
Estimation Method: Projection. Uncertainty (80%) bounds are between 13.5 and 74.8. Uncertainty (95%) bounds are between 23.2 and 82.3.
Country: Argentina , Year: 1982
Estimation Method: Projection. Uncertainty (80%) bounds are between 15 and 74.6. Uncertainty (95%) bounds are between 25.1 and 81.7.
Country: Argentina , Year: 1983
Estimation Method: Projection. Uncertainty (80%) bounds are between 16.7 and 74.4. Uncertainty (95%) bounds are between 26.9 and 81.5.
Country: Argentina , Year: 1984
Estimation Method: Projection. Uncertainty (80%) bounds are between 18.7 and 74.2. Uncertainty (95%) bounds are between 28.9 and 81.
Country: Argentina , Year: 1985
Estimation Method: Projection. Uncertainty (80%) bounds are between 20.5 and 74. Uncertainty (95%) bounds are between 30.9 and 80.5.
Country: Argentina , Year: 1986
Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 73.6. Uncertainty (95%) bounds are between 32.7 and 80.1.
Country: Argentina , Year: 1987
Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 73.3. Uncertainty (95%) bounds are between 34.8 and 79.6.
Country: Argentina , Year: 1988
Estimation Method: Projection. Uncertainty (80%) bounds are between 27.2 and 73. Uncertainty (95%) bounds are between 36.8 and 79.1.
Country: Argentina , Year: 1989
Estimation Method: Projection. Uncertainty (80%) bounds are between 29.7 and 72.7. Uncertainty (95%) bounds are between 38.9 and 78.5.
Country: Argentina , Year: 1990
Estimation Method: Projection. Uncertainty (80%) bounds are between 32 and 72.5. Uncertainty (95%) bounds are between 41 and 78.1.
Country: Argentina , Year: 1991
Estimation Method: Projection. Uncertainty (80%) bounds are between 34.3 and 72.3. Uncertainty (95%) bounds are between 42.9 and 77.7.
Country: Argentina , Year: 1992
Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 72.2. Uncertainty (95%) bounds are between 44.8 and 77.3.
Country: Argentina , Year: 1993
Estimation Method: Projection. Uncertainty (80%) bounds are between 38.6 and 72.2. Uncertainty (95%) bounds are between 46.6 and 76.9.
Country: Argentina , Year: 1994
Estimation Method: Projection. Uncertainty (80%) bounds are between 40.6 and 72.1. Uncertainty (95%) bounds are between 48.4 and 76.6.
Country: Argentina , Year: 1995
Estimation Method: Projection. Uncertainty (80%) bounds are between 42.7 and 71.9. Uncertainty (95%) bounds are between 50.1 and 76.3.
Country: Argentina , Year: 1996
Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 71.8. Uncertainty (95%) bounds are between 51.6 and 75.9.
Country: Argentina , Year: 1997
Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 71.7. Uncertainty (95%) bounds are between 53.3 and 75.5.
Country: Argentina , Year: 1998
Estimation Method: Projection. Uncertainty (80%) bounds are between 49.3 and 71.6. Uncertainty (95%) bounds are between 55.1 and 75.
Country: Argentina , Year: 1999
Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 71.6. Uncertainty (95%) bounds are between 56.9 and 74.5.
Country: Argentina , Year: 2000
Estimation Method: Projection. Uncertainty (80%) bounds are between 53 and 71.6. Uncertainty (95%) bounds are between 58.8 and 74.2.
Country: Argentina , Year: 2001
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 72.2. Uncertainty (95%) bounds are between 60.9 and 74.3.
Country: Argentina , Year: 2002
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 73.5. Uncertainty (95%) bounds are between 63.1 and 75.4.
Country: Argentina , Year: 2003
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 75. Uncertainty (95%) bounds are between 65.3 and 76.6.
Country: Argentina , Year: 2004
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 76.1. Uncertainty (95%) bounds are between 66.9 and 77.6.
Country: Argentina , Year: 2005
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 76.6. Uncertainty (95%) bounds are between 67.2 and 78.2.
Country: Argentina , Year: 2006
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.5 and 76.6. Uncertainty (95%) bounds are between 66.9 and 78.5.
Country: Argentina , Year: 2007
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 76.4. Uncertainty (95%) bounds are between 66.2 and 78.3.
Country: Argentina , Year: 2008
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 75.9. Uncertainty (95%) bounds are between 65.6 and 78.
Country: Argentina , Year: 2009
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 75.2. Uncertainty (95%) bounds are between 64.9 and 77.4.
Country: Argentina , Year: 2010
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 74.5. Uncertainty (95%) bounds are between 64.4 and 76.7.
Country: Argentina , Year: 2011
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 73.9. Uncertainty (95%) bounds are between 64.3 and 76.2.
Country: Argentina , Year: 2012
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 73.7. Uncertainty (95%) bounds are between 64.6 and 75.9.
Country: Argentina , Year: 2013
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 73.9. Uncertainty (95%) bounds are between 64.9 and 76.1.
Country: Argentina , Year: 2014
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 74.2. Uncertainty (95%) bounds are between 64.7 and 76.5.
Country: Argentina , Year: 2015
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 74.6. Uncertainty (95%) bounds are between 64.5 and 76.9.
Country: Argentina , Year: 2016
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 74.8. Uncertainty (95%) bounds are between 64.3 and 77.3.
Country: Argentina , Year: 2017
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 75. Uncertainty (95%) bounds are between 64.2 and 77.6.
Country: Argentina , Year: 2018
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 75.1. Uncertainty (95%) bounds are between 64.1 and 77.8.
Country: Argentina , Year: 2019
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 75.4. Uncertainty (95%) bounds are between 64.1 and 78.
Country: Argentina , Year: 2020
Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 75.7. Uncertainty (95%) bounds are between 63.9 and 78.5.
Country: Argentina , Year: 2021
Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 76.4. Uncertainty (95%) bounds are between 63.5 and 79.3.
Country: Argentina , Year: 2022
Estimation Method: Projection. Uncertainty (80%) bounds are between 58.9 and 77. Uncertainty (95%) bounds are between 63 and 80.1.